Environmental
Permit No. EP-674/2025
Àô¹Ò³\¥iÃÒ½s¸¹EP-674/2025
_cleared.files/image001.png)
ENVIRONMENTAL IMPACT ASSESSMENT ORDINANCE
(CHAPTER 499)
SECTION 10
Àô¹Ò¼vÅTµû¦ô±ø¨Ò
(²Ä499³¹)
²Ä10±ø
ENVIRONMENTAL PERMIT TO CONSTRUCT
A DESIGNATED PROJECT
«Ø³y«ü©w¤uµ{¶µ¥ØªºÀô¹Ò³\¥iÃÒ
A³¡ (³\¥iÃÒ¥Dn³¡¤À)
Pursuant to Section 10
of the Environmental Impact Assessment Ordinance (EIAO), the Director of
Environmental Protection (the Director) grants this environmental permit to the
Urban
Renewal Authority (hereinafter referred to
as the ¡§Permit Holder¡¨) to construct the designated project described in Part
B subject to the conditions specified in Part C. The issue of this
environmental permit is based on the documents, approvals or permissions
described below:
®Ú¾Ú¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò) ²Ä10±øªº³W©w¡AÀô¹Ò«OÅ@¸p¸pªø(¸pªø)±N¥»Àô¹Ò³\¥iÃҧ天¥«°Ï««Ø§½ (¤UºÙ¡§³\¥iÃÒ«ù¦³¤H¡¨) ¥H«Ø³yB³¡©Ò»¡©úªº«ü©w¤uµ{¶µ¥Ø¡A¦ý¶·¿í¦uC³¡©Ò¦C©úªº±ø¥ó¡C¥»Àô¹Ò³\¥iÃÒªºµo¥X¡A¤D¥H¤Uªí©Ò¦Cªº¤å¥ó¡B§åã©Î³\¥i§@¬°®Ú¾Ú¡R
|
Application No. ¥Ó½Ð®Ñ½s¸¹ |
AEP-674/2025 |
|
µn°O¥U¤Wªº¤å¥ó¡G |
(1)
Project Profile ¡V Repair, Maintenance and Revamping of Western
Market at Sheung Wan (Register No. PP-689/2025) ¤uµ{¶µ¥ØÂ²¤¶ ¡V ¤WÀô¦è´ä«°ªººûסB«O¾i©M½·s(µn°O¥U½s¸¹¡GPP-689/2025): (2)
The Director¡¦s letter of permission to apply directly for
Environmental Permit dated 30 July 2025 (Reference: (12) in EP 2/H3/Q/05) ¸pªø©ó2025¦~7¤ë30¤éµo¥Xã³\ª½±µ¥Ó½ÐÀô¹Ò³\¥iÃÒªº«H¥ó (ÀÉ®×½s¸¹¡G(12) in EP 2/H3/Q/05) (3)
Application for Environmental Permit submitted on
15 August 2025 (Application No. AEP-674/2025) ©ó2025¦~8¤ë15¤é ´£¥æªºÀô¹Ò³\¥iÃҥӽФå¥ó (¥Ó½Ð®Ñ½s¸¹: AEP-674/2025) |
9 September
2025
2025¦~9¤ë9¤é
|
Date ¤é´Á |
|
(Miss Queenie Y.C. NG) Principal
Environmental Protection Officer for Director of
Environmental Protection Àô¹Ò«OÅ@¸p¸pªø (º®uÀô¹Ò«OÅ@¥D¥ô§d¨J²M¤k¤h¥N¦æ) |
PART B (DESCRIPTION OF
DESIGNATED PROJECT)
B³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú)
Hereunder is the description of the
designated project mentioned in Part A of this environmental permit (hereinafter referred to as the ¡§Permit¡¨):
¤U¦C¬°¥»Àô¹Ò³\¥iÃÒ (¤UºÙ¡§³\¥iÃÒ¡¨) A³¡©Ò´£zªº«ü©w¤uµ{¶µ¥Øªº»¡©ú¡R
|
Title of Designated Project «ü©w¤uµ{¶µ¥Øªº¦WºÙ |
Repair, Maintenance and Revamping
of Western Market at Sheung Wan [This designated project is
hereafter referred to as ¡§the Project¡¨] ¤WÀô¦è´ä«°ªººûסB«O¾i©M½·s [¥»«ü©w¤uµ{¶µ¥Ø¤UºÙ ¡§¤uµ{¶µ¥Ø¡¨] |
|
Nature of Designated Project |
Building
works wholly in a site of cultural heritage (Items
Q.1 of Part I of Schedule 2 of the EIAO) «Ø¿v¤uµ{¥þ³¡¦ì©ó¤å¤Æ¿ò²£¦aÂI (Àôµû±ø¨Òªþªí2²ÄI³¡ªºQ.1¶µ) |
|
Location of Designated Project «ü©w¤uµ{¶µ¥Øªº¦aÂI |
The Project is located at Sheung Wan. The location of the
Project is shown in Figure 1
of this Permit. ¤uµ{¶µ¥Ø¦ì©ó¤WÀô¡C¤uµ{¶µ¥Øªº¦ì¸m¸ü©ó¥»³\¥iÃÒ¹Ï1¡C |
|
Scale and Scope of
Designated Project «ü©w¤uµ{¶µ¥Øªº³W¼Ò©M½d³ò |
The Project includes repair, maintenance
and revamping works on the Western Market, including brick walls, roof tiles,
general building services and alternation of internal layout. ¤uµ{¶µ¥Ø¥]¬A¹ï¦è´ä«°ªººûסB«O¾i©M½·s¤uµ{¡A¥]¬A¿jùÙ¡B«Î³»¥Ë¤ù¡B¤@¯ë«Ø¿v³]¬I¤Î内³¡§G§½ªº§ï°Ê¡C |
C³¡ (³\¥iÃÒ±ø¥ó)
¤@¯ë±ø¥ó
³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó«Ø³y¤uµ{¶µ¥Øªº¤H¤h¥²¶·§¹¥þ²Å¦X¥»³\¥iÃÒ¸ü¦Cªº¥þ³¡±ø¥ó¡C¥ô¦ó¤H¤h¦p¦³¤£²Å¦X¥»³\¥iÃÒªº±¡ªp¡A¥i¯à¹H¤Ï¡mÀô¹Ò¼vÅTµû¦ô±ø¨Ò¡n(Àôµû±ø¨Ò) (²Ä499³¹) ªº³W©w¡A¦Ó·í§½¥i®Ú¾ÚÀôµû±ø¨Ò±Ä¨ú¾A·í¦æ°Ê¡C
1.2 The Permit
Holder and any
person constructing the Project shall ensure full
compliance with all legislation from time to time in force including, without
limitation to, the Noise Control Ordinance (Cap. 400), Air Pollution Control Ordinance (Cap.
311), Water Pollution Control Ordinance (Cap. 358), Dumping at Sea Ordinance
(Cap. 466) and Waste Disposal Ordinance (Cap. 354). This Permit does not of itself
constitute any ground of defence against any proceedings instituted under any
legislation or imply any approval under any legislation.
³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó«Ø³y¤uµ{¶µ¥Øªº¤H¤h¶·½T«O§¹¥þ²Å¦X²{¦æªk¨Òªº³W©w¡A¥]¬A¦ý¤£©ó¡m¾¸µºÞ¨î±ø¨Ò¡n(²Ä400³¹) ¡B¡mªÅ®ð¦Ã¬VºÞ¨î±ø¨Ò¡n(²Ä311³¹)¡B¡m¤ô¦Ã¬VºÞ¨î±ø¨Ò¡n(²Ä358³¹) ¡B¡m®ü¤W¶É˪«®Æ±ø¨Ò¡n(²Ä466³¹) ¤Î¡m¼oª«³B¸m±ø¨Ò¡n(²Ä354³¹)¡C¥»³\¥iÃÒ¥»¨¤£·|´N®Ú¾Ú¥ô¦óªk¨Ò´£¥Xªºªk«ßµ{§Çºc¦¨¥ô¦ó§ÜÅG²z¥Ñ¡A©Î®Ú¾Ú¥ô¦óªk¨ÒÀq¥Ü¥ô¦ó§åã¡C
1.3 The Permit
Holder shall make copies of this Permit together with all documents referred to
in this Permit and the documents referred to in Part A of this
Permit readily available at all times for inspection by the Director or his
authorised officers at all sites covered by this Permit. Any reference to this
Permit shall include all documents referred to in this Permit and also the
relevant documents in the Register.
³\¥iÃÒ«ù¦³¤H¶·¦L»s¥»³\¥iÃÒªº½Æ¥»¡A³s¦P¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Î¥»³\¥iÃÒA³¡©Òz¤å¥ó¡A¥H¨Ñ¸pªø©ÎÀò±ÂÅv¤Hû¥ô¦ó®É¶¡¤º¦b¥»³\¥iÃÒ©Ò²[»\ªº©Ò¦³¤u¦a¬d¾\¡C¤Z´£z¥»³\¥iÃÒ¡A¶·¥]¬A¥»³\¥iÃÒ©Òzªº©Ò¦³¤å¥ó¤Îµn°O¥U¤ºªº¬ÛÃö¤å¥ó¡C
1.4 The Permit
Holder shall give a copy of this Permit to the person(s) in charge of the
site(s) and ensure that such person(s) fully understands all conditions and all
requirements incorporated in this Permit. The site(s) refers to
site(s) of construction of the Project and shall mean the same hereafter.
³\¥iÃÒ«ù¦³¤H¶·§â¥»³\¥iÃÒªº¤@¥÷½Æ¥»¥æ¤©¦³Ãö¤u¦aªºt³d¤H¡A¨Ã½T«O³o¨Ç¤H¤h§¹¥þ©ú¥Õ¥»³\¥iÃÒªº©Ò¦³±ø¥ó»P³W©w¡C¤u¦a¬O«ü«Ø³y¤uµ{¶µ¥Øªº¤u¦a¡A¤U¤å©Ò´£¤Îªº¤u¦a¥çÄݦP¤@·N«ä¡C
³\¥iÃÒ«ù¦³¤H¶·¦b«Ø³y¤u¦aªº©Ò¦³¨®½ø¶i¥X¤f©Î¤@³B¤è«K¦aÂI¡AÅã²´¦a®i¥Ü¥»³\¥iÃÒªº½Æ¥»¡A¥H¨Ñ¤½²³¦b¥ô¦ó®É¶¡¤º¾\Äý¡C³\¥iÃÒ«ù¦³¤H¶·½T«O¦b³o¨Ç¦aÂI®i¥ÜÃö©ó¥»³\¥iÃÒ(¥]¬A¥ô¦ó¸g×qªº³\¥iÃÒ)ªº³Ì·s¸ê®Æ¡C³\¥iÃÒ«ù¦³¤H¦p¥æ¦^¥»³\¥iÃÒªº³¡¤À©Î¥þ³¡¡A¥²¶·§â¨ä°e¥æ¸pªøªº³qª¾®Ñ¡A¦b³Æ¦³ì¦³³\¥iÃÒªº¦U³B¬Û¦P¦aÂI®i¥Ü¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q«Ø³y¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
1.6 The Permit
Holder and any person constructing the Project shall construct the Project in
accordance with the project description in Part B of this Permit.
³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó«Ø³y¤uµ{¶µ¥Øªº¤H¤h¶·¨Ì¾Ú¥»³\¥iÃÒB³¡ªº¤uµ{¶µ¥Ø»¡©ú¡A«Ø³y¤uµ{¶µ¥Ø¡C
1.7 The Permit
Holder and any person constructing the Project shall ensure that the Project is
designed and constructed
in accordance with the information and recommendations described in the Project Profile (Register No.: PP-689/2025); the
application documents for
environmental permits; other relevant document in the Register;
the information and mitigation measures described in this Permit, and
mitigation measures to be recommended under on-going surveillance and
monitoring activities during all stages of the Project. Where
recommendations referred to in the application documents
of the Register are not expressly referred to in this Permit, such
recommendations are nevertheless to be implemented unless expressly excluded in
this Permit or otherwise agreed by the Director.
³\¥iÃÒ«ù¦³¤H¤Î¥ô¦ó«Ø³y¤uµ{¶µ¥Øªº¤H¤h¶·½T«O¤uµ{¶µ¥Ø«ö·Ó¤Uz¸ê®Æ³]p¤Î«Ø³y¡G¤uµ{¶µ¥ØÂ²¤¶(µn°O¥U½s¸¹¡GPP-689/2025)©Ò»¡©úªº¸ê®Æ¤Î¬ÛÃö«ØÄ³¡FÀô¹Ò³\¥iÃÒªº¥Ó½Ð¤å¥ó¡Fµn°O¥U¤ºªº¨ä¥L¬ÛÃö¤å¥ó¡F¥»³\¥iÃÒ©Ò»¡©úªº¸ê®Æ¤Î½w¸Ñ±¹¬I¡F¥H¤Î¦b¤uµ{¶µ¥Ø¦U¶¥¬q¶i¦æªº«ùÄòºÊ¹î¤ÎºÊ´ú¤u§@©Ò«ØÄ³ªº½w¸Ñ±¹¬I¡Cµn°O¥U¤ºªº¥Ó½Ð¤å¥ó©Òz«ØÄ³¦p¨S¦³¦b¥»³\¥iÃÒ©ú½Tªí¥Ü¡A«h¤´¶·¹ê¬I³o¨Ç«ØÄ³¡A°£«DÀò¥»³\¥iÃÒ©ú½TÁŰ£©Î¥tÀò¸pªø¦P·N¡C
1.8 The Permit Holder shall notify the Director in writing the
commencement date of construction of the Project no later than 2 weeks prior to the
commencement of construction of the Project. The Permit Holder shall notify the
Director in writing immediately if there is any change of the commencement date
of the construction.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Ø«Ø³y¤uµ{®i¶}«e³Ì¤Ö2Ó¬P´Á¡A¥H®Ñ±¤è¦¡§â¤uµ{¶µ¥Ø«Ø³y¤uµ{ªº®i¶}¤é´Á³qª¾¸pªø¡C«Ø³y¤uµ{ªº®i¶}¤é´Á¦p¦³¥ô¦ó§ó§ï¡A³\¥iÃÒ«ù¦³¤H¥²¶·¥ß§Y¥H®Ñ±¤è¦¡³qª¾¸pªø¡C
¬°°õ¦æ¥»³\¥iÃÒ¡A¡u«Ø³y¤uµ{ªº®i¶}¡v¤£¥]¬A¦³Ãö¤u¦a²M²z©M¹w³Æªº¤uµ{¡A©Î¸pªø¦P·Nªº¨ä¥L¤uµ{¡C
¯S©w±ø¥ó
2.1 An Independent Environmental Checker (IEC) shall be employed by the
Permit Holder no later than 2 weeks before the commencement of construction of
the Project. The IEC shall not be
in any way an associated body of the Contractor for the Project. The IEC shall be a person who has at
least 7 years of experience in Environmental Monitoring and Auditing or
environmental management. The IEC
shall be responsible for duties defined in the Project Profile (Register No.
PP-689/2025) and this Permit, including the audit of the implementation of
mitigation measures recommended in the Project Profile and required under this
Permit.
³\¥iÃÒ«ù¦³¤H¶·¦b¤uµ{¶µ¥Øªº«Ø³y¤uµ{®i¶}«e³Ì¤Ö2Ó¬P´Á¸u¥Î¤@¦W¿W¥ßÀô¹Ò¬d®Ö¤H¡C¿W¥ßÀô¹Ò¬d®Ö¤H¤£±o»P¤uµ{¶µ¥Øªº©Ó¿ì°Ó¦³¥ô¦óÃöÁp¡A¦Ó¸Ó¦W¿W¥ßÀô¹Ò¬d®Ö¤H¶·¦bÀô¹ÒºÊ¹î¤Î¼f®Ö©ÎÀô¹ÒºÞ²z¤è±¦Ü¤Ö¦³7¦~¸gÅç¡C¿W¥ßÀô¹Ò¬d®Ö¤H¶·°õ¦æ¤uµ{¶µ¥ØÂ²¤¶(µn°O¥U½s¸¹¡GPP-689/2025)¤Î¥»³\¥iÃÒ©Ò¦C©úªºÂ¾³d¡A¥]¬A¼f®Ö¤uµ{¶µ¥ØÂ²¤¶©Ò«ØÄ³¤Î¥»³\¥iÃÒ³W©wªº½w¸Ñ±¹¬Iªº¹ê¬I±¡ªp¡C
2.2 All measures described
in the Project Profile (Register No. PP-689/2025) submitted with the
application (Application No. DIR-314/2025) on 3 July 2025 shall be fully
implemented.
¦b2025¦~7¤ë3¤éÀH¥Ó½Ð®Ñ(¥Ó½Ð½s¸¹¡GDIR-314/2025)´£¥æªº¤uµ{¶µ¥ØÂ²¤¶(µn°O¥U½s¸¹¡GPP-689/2025)©Ò´yzªº¤@¤Á±¹¬I§¡¶·¤©¥H¹ý©³°õ¦æ¡C
Notes:
µù¡G
1. This Permit
consists of three parts, namely, Part A (Main Permit), Part B
(Description of Designated Project) and Part C (Permit Conditions). Any person relying on this Permit should
obtain independent legal advice on the legal implications under the EIAO, and
the following notes are for general information only.
¥»³\¥iÃÒ¦@¦³3³¡¡A§Y A³¡ (³\¥iÃÒ¥Dn³¡¤À)¡FB³¡ («ü©w¤uµ{¶µ¥Øªº»¡©ú) ¤ÎC³¡ (³\¥iÃÒ±ø¥ó)¡C¥ô¦ó´©¤Þ¥»³\¥iÃÒªº¤H¤h¶·´NÀôµû±ø¨Òªºªk«ß§t·N¼x¸ß¿W¥ßªk«ß·N¨£¡A¤Uzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡C
2. If there is
a breach of any condition of this Permit, the Director or his authorized
officer may, with the consent of the Secretary
for Environment and Ecology, order the cessation of associated work
until the remedial action is taken in respect of the resultant environmental
damage, and in that case the Permit Holder shall not carry out any associated
works without the permission of the Director or his authorized officer.
¦p¹H¤Ï¥»³\¥iÃÒªº¥ô¦ó±ø¥ó¡A¸pªø©ÎÀò±ÂÅv¤Hû¼x±oÀô¹Ò¤Î¥ÍºA§½§½ªøªº¦P·N«á¥i°Ç¥O°±¤î¬ÛÃö¤uµ{¡Aª½¦Ü³\¥iÃÒ«ù¦³¤H¬°©Ò³y¦¨ªºÀô¹Ò·l®`±Ä¨ú¸É±Ï¦æ°Ê¬°¤î¡C¦b¦¹±¡ªp¤U¡A³\¥iÃÒ«ù¦³¤H¥¼¸g¸pªø©ÎÀò±ÂÅv¤Hû¦P·N¡A¤£±o¶i¦æ¥ô¦ó¬ÛÃö¤uµ{¡C
3. The Permit
Holder may apply under Section 13 of the EIAO to the Director for a variation
of the conditions of this Permit. The Permit Holder shall replace the original
permit displayed on the Project site by the amended permit.
³\¥iÃÒ«ù¦³¤H¥i®Ú¾ÚÀôµû±ø¨Ò²Ä13±øªº³W©w¦V¸pªø¥Ó½Ð§ó§ï¥»Àô¹Ò³\¥iÃÒªº±ø¥ó¡C³\¥iÃÒ«ù¦³¤H¶·¥H¸gק諸³\¥iÃÒ´À´«¦b¤uµ{¶µ¥Ø¤u¦a¤º®i¥Üªºì¦³³\¥iÃÒ¡C
4. A person
who assumes the responsibility for the whole or a part of the Project may,
before he assumes responsibility of the Project, apply under Section 12 of the
EIAO to the Director for a further environmental permit.
©Ó¾á¤uµ{¶µ¥Ø¾ã¶µ©Î³¡¤À¤uµ{ªº³d¥ôªº¤H¡A¦b©Ó¾á³d¥ô¤§«e¡A¥i®Ú¾ÚÀôµû±ø¨Ò²Ä12±øªº³W©w¦V¸pªø¥Ó½Ð·sªºÀô¹Ò³\¥iÃÒ¡C
5. Under
Section 14 of the EIAO, the Director may with the consent of the Secretary for Environment and Ecology, suspend,
vary or cancel this Permit. The suspended, varied or cancelled Permit shall be
removed from display at the Project site.
®Ú¾ÚÀôµû±ø¨Ò²Ä14±øªº³W©w¡A¸pªø¥i¦b¨ú±oÀô¹Ò¤Î¥ÍºA§½§½ªøªº¦P·N¤U¼È®É¦Q¾P¡B§ó§ï©Î¨ú®ø¥»³\¥iÃÒ¡C¾D¼È®É¦Q¾P¡B§ó§ï©Î¨ú®øªº³\¥iÃÒ¥²¶·±q¤uµ{¶µ¥Ø¤u¦a°£¤U¡A¤£¦A®i¥Ü¡C
6. If this
Permit is cancelled or surrendered during construction of the Project, another
environmental permit must be obtained under the EIAO before the Project could
be continued. It is an offence
under Section 26(1) of the EIAO to construct a designated project listed in
Part I of Schedule 2 of the EIAO without a valid environmental permit.
¦pªG¥»³\¥iÃÒ¦b¤uµ{¶µ¥Ø«Ø³y´Á¶¡¨ú®ø©Î¥æ¦^¡A«h¦bÄ~Äò¶i¦æ¤uµ{¶µ¥Ø¤§«e¡A¥²¶·¥ý®Ú¾ÚÀôµû±ø¨Ò³W©w¨ú±o¥t¤@¥÷Àô¹Ò³\¥iÃÒ¡C®Ú¾ÚÀôµû±ø¨Ò²Ä26(1)±øªº³W©w¡A¥ô¦ó¤H¦b¨S¦³¦³®ÄÀô¹Ò³\¥iÃÒªº±¡ªp¤U«Ø³yÀôµû±ø¨Òªþªí2²Ä1³¡©Ò¦C©úªº«ü©w¤uµ{¶µ¥Ø¡A§YÄݥǸo¡C
7. Any person
who constructs the Project contrary to the conditions in this Permit, and is
convicted of an offence under the EIAO, is liable:
(i)
on a first conviction on indictment to a fine of $2 million
and to imprisonment for
6 months;
(ii)
on a second or subsequent conviction on indictment to a
fine of $5 million and to imprisonment for 2 years;
(iii)
on a first summary conviction to a fine at level 6 and to
imprisonment for 6 months;
(iv)
on a second or subsequent summary conviction to a fine of
$1 million and to imprisonment for 1 year; and
(v)
in any case where the offence is of a continuing nature,
the court or magistrate may impose a fine of $10,000 for each day on which he
is satisfied the offence continued.
¦p¥ô¦ó¤H¦b¹H¤Ï¥»³\¥iÃÒªº±ø¥ó¤U«Ø³y¤uµ{¶µ¥Ø¡A¥B³Qµô©wIJ¥ÇÀôµû±ø例©Òq©úªº¸o行¡A§YÄݥǸo¡G
(i)
¤@¸g´`¤½¶Dµ{§Çº¦¸©w¸o¡A¥i³B»@´Ú200¸U¤¸¤ÎºÊ¸T6Ó¤ë¡F
(ii)
¤@¸g´`¤½¶Dµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú500¸U¤¸¤ÎºÊ¸T2¦~¡F
(iii)
¤@¸g´`²©öµ{§Çº¦¸©w¸o¡A¥i³B²Ä6¯Å»@´Ú¤ÎºÊ¸T6Ó¤ë¡F
(iv)
¤@¸g´`²©öµ{§Ç²Ä¤G¦¸©Î¨ä«á¨C¦¸©w¸o¡A¥i³B»@´Ú100¸U¤¸¤ÎºÊ¸T1¦~¡F¥H¤Î
(v)
¦b¥ô¦ó±¡ªp¤U¦p¸Ó¸o¦æÄÝ«ùÄò©Ê½è¡Aªk°|©Îµô§P©x¥i´N¨ä«H¯Ç¸Ó¸o¦æ«ùÄòªº¨C¤Ñ¥t³B»@´Ú10,000¤¸¡C
8. The Permit
Holder may appeal against any condition of this Permit under Section 17 of the
EIAO within 30 days of receipt of this Permit.
³\¥iÃÒ«ù¦³¤H¥i¦b±µÀò¥»³\¥iÃÒ«á30¤Ñ¤º¡A®Ú¾ÚÀôµû±ø¨Ò²Ä17±ø´N¥»³\¥iÃÒªº¥ô¦ó±ø¥ó´£¥X¤W¶D¡C
9. The
Notes are for general reference only and that the Permit Holder should refer to
the EIAO for details and seek independent legal advice.
¤Wzµù¸Ñ¥u¨Ñ¤@¯ë°Ñ¦Ò¥Î¡A±ýª¾¦³Ãö¸Ô±¡¡A³\¥iÃÒ«ù¦³¤H¶·°Ñ¾\Àôµû±ø¨Ò¤Î¼x¸ß¿W¥ßªk«ß·N¨£¡C
Environmental Permit No. EP-674/2025
Àô¹Ò³\¥iÃÒ½s¸¹
EP-674/2025