4.       Landscape and Visual

Landscape and Visual Audit

4.1               Landscape and visual site audit was carried out on a monthly basis to monitor environmental issues on the construction sites to ensure that all mitigation measures were implemented timely and properly.  The findings in August 2006 were:

·         The maximum stockpiling height at the Fill Bank was limited to a maximum of +40 mPD;

·         The Contractor hydroseeded the outer slopes of the Fill Bank as far as practicable;

·         The Contractor removed the stockpile of public fill in a sequence to allow the outer hydroseeded to be removed later than other portions as far as practicable;

·         Casuarina equisetifolia were planted as buffer tree along the northern perimeter of the Site The height of Casuarina equisetifolia was maintained at least 3000mm above soil level; and

·         Lighting was set to minimise nighttime glare.