1.1 Background of the Study
1.2 Project History
1.3 Relevant Studies
1.4 Purpose and Objectives of the EIA
1.5 Key Environmental Issues and Study Approach
1.6 Inter-Relationship with Other EIA Studies
1.7 Structure of the EIA
2.1 Introduction
2.2
Site Location and History
2.3
Existing Major Developments within The Project Area
2.4
Development Programme
2.5
Major Roads and Railway
2.6
EIA Ordinance Requirements and Designated Projects
2.7
EIA Study Assessment Areas
2.8
Reclamation Construction Schedule
2.9
Project Roads Construction Works Schedule
2.10
Stormwater Drainage, Sewerage and Other Utilities
2.11
Developments
2.12
Concurrent Projects
2.13
Benefits and Disbenefits of The Project
2.14
“Without The Project” Scenario
3 AIR
QUALITY
3.1 Introduction
3.2 Evaluation
Criteria
3.3 Baseline
Conditions and Sensitive Receivers
3.4 NLDFS
Development
3.5 Chok Ko
Wan Link Road
3.6 Residual
Environmental Impacts
3.7 Environmental
Monitoring and Audit
3.8 Conclusions
4 NOISE
4.1 Introduction
4.2 Statutory
Requirements and Evaluation Criteria
4.3 Noise
Sensitive Receivers
4.4 Assessment
Methodology
4.5 NLDFS :
Identification and Assessment of Environmental Impacts
4.6 NLDFS:
Mitigation of Adverse Environmental Impacts
4.7 CKWLR:
Identification and Assessment of Environmental Impacts
4.8 CKWLR:
Mitigation of Adverse Environmental Impacts
4.9 Residual
Environmental Impact
4.10 Environmental
Monitoring and Audit
4.11 Conclusions
5 WATER QUALITY
5.1 Introduction
5.2 Relevant
Legislation and Guidelines
5.3 Existing
Environment/Sensitive Receivers
5.4 Assessment
Methodology - Construction
5.5 Identification
of Environmental Impacts - Construction
5.6 Assessment
of Environmental Impacts - Construction
5.7 Mitigation
of Environmental Impacts - Construction Phase
5.8 Assessment
Methodology - Operation
5.9 Identification
of Environmental Impacts - Operation
5.10 Assessment
of Environmental Impacts - Operation
5.11 Mitigation
of Adverse Environmental Impacts - Operation
5.12 Residual
Environmental Impacts
5.13 Environmental
Monitoring and Audit
5.14 Conclusions
5.15 Impact
Summary
6 SOLID WASTE MANAGEMENT
6.1
Introduction
6.2
Statutory Requirements and Evaluation Criteria
6.3
Waste Management Infrastructure
6.4
Assessment Methodology
6.5
NLDFS: Identification of Environmental Impacts
6.6
NLDFS: Assessment of Environmental Impacts
6.7
NLDFS: Mitigation of Adverse Environmental Impacts
6.8
CKWLR: Identification of Environmental Impacts
6.9
CKWLR: Assessment of Environmental Impacts
6.10
CKWLR: Mitigation of Adverse Environmental Impacts
6.11
Residual Environmental Impacts
6.12
Environmental Monitoring and Audit
6.13
Conclusion
6.14
Biogas Assessment
6.15
Impact Summary
7.1 Introduction
7.2 Statutory
Requirements and Evaluation Criteria
7.3 Assessment
Methodology
7.4 Existing
Environment/Sensitive Receivers
7.5 NLDFS:
Identification of Environmental Impacts
7.6 NLDFS:
Assessment of Environmental Impacts
7.7 NLDFS:
Mitigation of Adverse Environmental Impacts
7.8 CKWLR:
Identification of Environmental Impacts
7.9 CKWLR:
Assessment of Environmental Impacts
7.10 CKWLR:
Mitigation of Adverse Environmental Impacts
7.11 Residual
Environmental Impacts
7.12 Ecological
Monitoring and Audit (EM&A) Requirement
8.1 Introduction
8.2 Statutory Requirements and
Evaluation Criteria
8.3 Existing Environment
8.4 Assessment Methodology
8.5 Identification of Environmental
Impacts
8.6 Assessment of Environmental Impacts
8.7 Mitigation of Adverse Environmental
Impacts
8.8 Residual Environmental Impacts
8.9 Ecological Monitoring and Audit
Requirements
8.10 Conclusions
8.11 Impacts Summary
9.1 Introduction
9.2 Statutory
Requirements and Evaluation Criteria
9.3 Existing Environment and Fisheries Sensitive Receivers
9.4 Assessment Methodology
9.5 Identification of Environmental
Impacts
9.6 Assessment of Environmental Impacts
9.7 Conclusions
10 HAZARD
TO LIFE ASSESSMENT FOR DANGEROUS GOODS
10.1 Introduction
10.2 Relevant
Legislation and Guidelines
10.3 Background
Information
10.4 Evaluation
of Impacts
10.5 Risk
Assessment Conclusions
11 HISTORICAL, ARCHAEOLOGICAL AND CULTURAL HERITAGE ASSESSMENT
11.1
Introduction
11.2
Legislation, Standards, Guidelines & Criteria
11.3
Assessment Methodology
11.4
Baseline Condition
11.5
Potential Sources of Impacts
11.6 NLDFS: Assessment of Historical,
Archaeological and Cultural Heritage Impacts
11.7 NLDFS: Mitigation of Adverse
Historical, Archaeological and Cultural Heritage Impacts
11.8 CKWLR: Assessment of Historical,
Archaeological and Cultural Heritage Impacts
11.9
CKWLR: Mitigation of Adverse Environmental Impacts
11.10
Residual Environmental Impact
11.11
Impacts Summary
11.12
Conclusions
12.1
Introduction
12.2
Statutory Requirements and Evaluation Criteria
12.3
Existing Environmental Sensitive Receivers
12.4
Assessment Methodology
12.5
Identification of Environmental Impacts
12.6
Assessment of Environmental Impacts
12.7
Mitigation of Adverse Environmental Impacts
12.8
Conclusions
13 LANDSCAPE AND VISUAL IMPACT ASSESSMENT (LVIA)
13.1 Introduction
13.2 Baseline Conditions
13.3 Impact On Landscape Elements
13.4 Impacts To Landscape Character
13.5 Visual Impact
13.6 Mitigation Measures
13.7 Residual Impact and Acceptability
of Impact
14 ENVIRONMENTAL
MONITORING AND AUDIT
15.1 Introduction
16 CONCLUSIONS AND
SUMMARY OF EIA FINDINGS
16.1 Introduction
16.2 Summary of EIA Findings
16.3 Noise
16.4 Water Quality
16.5 Waste Management
16.6 Terrestrial Ecology
16.7 Marine Ecology
16.8 Fisheries
16.9 Risk Assessment
16.10 Landscape and Visual Impacts
16.11 Historical, Archaeological and
Cultural Heritage
16.12 Land Contamination
16.13 Environmental
Monitring and Audit (EM&A)
16.14
Benefits and Environmental Enhancements arising from the Project
16.15 Recommendations of Further Studies
16.16 Overall Conclusions
Annex A Construction Programme and Phasing of the Reclamations
Annex B Air Quality Impact Assessment
Annex C Noise Impact Assessment (excluding Annex C3)
Annex D Water Quality Impact Assessment
Annex E Terrestrial Ecology Impact Assessment
Annex F Supporting Information for the Marine Ecology Impact Assessment
Annex G Supporting Information for the Fisheries Impact Assessment
Annex H Cultural Heritage Impact Assessment
Annex I Land Contamination Assessment
Annex J Landscape and Visual Impact Assessment for NLDFS and CKWLR
Annex K EIA Study Brief (SB-044/BC)
Annex C3 (only) Construction Noise Impact Assessment - Predicted Noise Levels
Environmental Monitoring & Audit Manual (Annex L)