5.1
Identified Sensitive Receivers
5.1.1
Representative
Noise Sensitive Receivers (NSRs) have been identified in accordance with
criteria set out in the Environmental Impact Assessment Ordinance (EIAO) and
Technical Memorandum on the Environmental Impact Assessment Process (TMEIA).
5.1.2
Preliminary
NSRs have been identified in an area 300m either side of the full stretch of
the proposed roads. Existing noise
sensitive receivers who may be adversely affected by increases in noise as a
result of the construction and operation of the improved Tung Chung Road are
listed in Table 5.1. The representative NSRs can also be seen in Figures 5.1a
to 5.1g. The density of village
properties in the Tung Chung Valley, Ha Ling Pei and Wong Ka Wai, has made it
necessary to allocate further sensitive receivers in this area for the
assessment of construction noise for permanent noise barrier construction and
operational noise impacts. The
additional sensitive receivers in this area are shown in Figure 5.3a. Visitors to the country park are also
potentially sensitive to impacts but as no permanent facilities, such as camp
grounds, are affected and all other visitors would be transient in nature, no
significant impacts are predicted.
5.1.3 In addition to the above, the Cheung Sha Layout Plan – Lantau Island, Plan No. L/I-CS/1, has identified several future sales sites in the vicinity of the junction of the new Tung Chung Road with the South Lantau Road. These sites have been allocated for future low rise 2 storey residential development. The boundaries of the site are indicative only and the layout of the properties is not known at this time. However, representative locations at the sites which are closest to the proposed road have been selected at the site boundaries in order to assess the potential impacts to any future receivers, as shown on Figure 5.1e. The properties will not be constructed and occupied until after the opening of the proposed widened Tung Chung Road and as such the representative ASRs are relevant to the operational phase of the project only.
Table 5.1: Noise Sensitive Receivers
Figures
No. |
NSR Ref. |
NSR |
No. of
Floor |
Shortest
Slant Distance (m) |
Description |
|
5.1a/5.3a |
SR1 |
8, Ha Ling Pei |
3 |
235 |
Residential |
|
SR2 |
7, Wong Ka Wai |
3 |
119 |
Residential |
||
SR3 |
Village House |
3 |
256 |
Residential |
||
SR4 |
8, Lung Tseng Tau |
3 |
56 |
Residential |
||
SR5 |
Village House |
3 |
168 |
Residential |
||
5.1b |
SR6 |
41, Shek Lau Po |
3 |
246 |
Residential |
|
SR7 |
Village House |
3 |
198 |
Residential |
||
SR8 |
1, Shek Mun Kap |
3 |
230 |
Residential |
||
5.1c |
SR9 |
AFCD Staff Quarters |
1 |
156 |
Residential |
|
|
|
|
|
|
|
|
5.1d |
SR10 |
74, Leyburn Villas |
2 |
298 |
Residential |
|
5.1e |
SR11 |
12, Cheung Sha Sheung Tsuen |
3 |
277 |
Residential |
|
SR12 |
32, Cheung Sha Sheung Tsuen |
3 |
266 |
Residential |
||
SR13 |
31B, South Lantau Road |
2 |
35 |
Residential |
||
SR14 |
Village House |
2 |
153 |
Residential |
||
SR15 |
YWCA Youth Camp |
1 |
55 |
Residential |
||
5.1f |
SR16 |
Block 1, Acacia Villa |
3 |
161 |
Residential |
|
SR17 |
37, South Lantau Road |
3 |
234 |
Residential |
||
SR18 |
39, South Lantau Road |
3 |
289 |
Residential |
||
5.1g |
SR19 |
Block 17, Butterfly Crest |
3 |
# |
Residential |
|
Additional Sensitive Receivers in Tung Chung Valley |
||||||
5.3a |
SR1A |
10, Ha Ling Pei |
3 |
273 |
Residential |
|
SR1B |
8, Ha Ling Pei |
3 |
256 |
Residential |
||
SR1C |
7, Ha Ling Pei |
3 |
215 |
Residential |
||
SR2A |
14, Wong Ka Wai |
3 |
165 |
Residential |
||
SR2B |
9, Wong Ka Wai |
3 |
132 |
Residential |
||
SR2C |
7, Wong Ka Wai |
3 |
99 |
Residential |
||
SR2D |
3A, Wong Ka Wai |
3 |
83 |
Residential |
||
SR4A |
10A, Lung Tseng Tau |
3 |
60 |
Residential |
||
SR4B |
7, Lung Tseng Tau |
3 |
45 |
Residential |
||
SR4C |
13, Lung Tseng Tau |
3 |
55 |
Residential |
||
SR4D |
28, Lung Tseng Tau |
3 |
34 |
Residential |
||
Future Sensitive Receivers in Cheung Sha(1) |
||||||
5.1f |
CS1 |
Cheung Sha future sale site
|
2 |
35(2) |
Residential |
|
CS2 |
Cheung Sha future sale site
|
2 |
32(2) |
Residential |
||
CS3 |
Cheung Sha future sale site
|
2 |
56(2) |
Residential |
||
CS4 |
Cheung Sha future sale site
|
2 |
53(2) |
Residential |
||
CS5 |
Cheung Sha future sale site
|
2 |
25(2) |
Residential |
||
CS6 |
Cheung Sha future sale site
|
2 |
20(2) |
Residential |
||
CS7 |
Cheung Sha future sale site
|
2 |
20(2) |
Residential |
||
CS8 |
Cheung Sha future sale site
|
2 |
25(2) |
Residential |
||
CS9 |
Cheung Sha future sale site
|
2 |
29(2) |
Residential |
||
CS10 |
Cheung Sha future sale site
|
2 |
33(2) |
Residential |
||
CS11 |
Cheung Sha future sale site
|
2 |
50(2) |
Residential |
||
CS12 |
Cheung Sha future sale site
|
2 |
22(2) |
Residential |
||
CS13 |
Cheung Sha future sale site
|
2 |
42(2) |
Residential |
||
Note: # The distance between SR19 and the improved
Tung Chung Road is more than 500m and thus it will only be potentially affected
by the slope remediation works on the obsolete sections of the existing Tung
Chung Road during the construction phase
(1): Future sensitive receivers relevant to the operational phase only.
(2):
Based upon assumed locations of sensitive receivers only and site boundaries
are indicative.
5.1.4
All the sensitive receivers are residential and, thus,
the noise criteria for general construction work during normal working hours
(0700 to 1900 hours on any day not being Sunday and Public Holiday) will be 75
dB(A) (Leq (30mins)) and 70 dB(A) (L10(1hour)) for the
operational phase as detailed in Section 3.
5.1.5
The Remaining Development in Tung Chung and Tai Ho
Comprehensive Feasibility Study has also proposed sensitive development on the fringes of Tung Chung,
close to the northern edge of the project and these could be adversely affected
by the operation of the improved Tung Chung Road. The impacts on these
sensitive receivers are reported separately in Section 12 of this report.
5.2.1
The
majority of the proposed road, with the exception of the northern and southern
end, is situated within very quiet rural areas, with the surrounding land
comprising country parks, open space and agricultural activities. Noise levels for the majority of the study
area are very low, the only major noise sources is the traffic of existing Tung
Chung Road.
5.2.2
Noise
levels at the northern end of the alignment in Tung Chung are influenced by
traffic from the Yu Tung Road and existing Tung Chung Road. The southern end of the alignment connects
with the South Lantau Road and thus, noise levels in this area are higher due
to the presence of road traffic.
5.3.1
Construction Activities
5.3.1.1
The
construction equipment for each stage of the project has been determined and
the sound power level (SWL) of each piece of equipment is based upon the Technical Memorandum on Noise From
Construction Work Other Than Percussive Piling and BS5228 when the SWL are not listed in the Technical
Memorandum. No percussive piling is
anticipated for the Project.
5.3.1.2
The
construction activities for the Project can be divided into four broad areas,
namely roadworks and bridgeworks for the main alignment, slope stabilisation
works and slope remediation works for the obsolete section of the existing Tung
Chung Road. The key construction
activities within these broad activities will include:
(i)
Roadworks - earthworks
(including
utility works) - retaining wall construction (required
for all
areas
not on structure); and
-
pavement
construction.
(ii) Bridgeworks: - foundation
construction; and
- deck construction.
(iii) Slope Stabilisation - soil
nailing/rock dowelling; and
-
equipment
transportation.
-
(iv) Slope Remediation - earthworks;
and
-
slope
nailing.
(v) Noise Mitigation - foundation
construction; and
- erection.
5.3.1.3
The
individual pieces of equipment required for each of these stages have been
highlighted in Section 2. The
construction plant has been further divided into working scenarios for each of
the broad construction activities as detailed in Table 5.2 below:
Table 5.2: Equipment
Scenarios
Main Activity |
Sub-Activity |
Equipment Scenario |
Scenario Reference |
Roadworks |
Earthworks(1) |
Scenario 1 - Rock/earth excavation |
E1 |
Scenario 2 - Removal
/spreading of earth/rock |
E2 |
||
Scenario 3 - Forming of earthworks. |
E3 |
||
Retaining Wall Construction |
Scenario 1 - Foundation works |
R1 |
|
Scenario 2 - Piling |
R2 |
||
Scenario 3 - Formwork/concreting. |
R3 |
||
Scenario 4 - Backfilling Works |
R4 |
||
Pavement Construction (1) |
Scenario 1 - Preparation of Roadbase |
P1 |
|
Scenario 2 - Laying of Surface Material |
P2 |
||
Scenario 3 - Road Marking |
P3 |
||
Bridgeworks |
Foundation Construction |
Scenario 1 - Excavation |
F1 |
Scenario 2 - Piling |
F2 |
||
Scenario 3 - Formwork |
F3 |
||
Scenario 4 - Concreting |
F4 |
||
Deck Construction |
Scenario 1 - Formworks |
D1 |
|
Scenario 2 - Concreting |
D2 |
||
Scenario 3 - Deck elevation |
D3 |
||
Slope(2) Stabilisation |
Rock Dowelling |
Scenario 1 – Rock dowelling |
SS1 |
Equipment Transportation |
Scenario 1 – Delivery by helicopter |
SS2 |
|
Slope (2) Remediation |
Earthworks |
Scenario 1 – Earthworks |
SR1 |
Slope Nailing |
Scenario 1 – Slope Nailing |
SR2 |
|
Noise Mitigation |
Foundations and Erection |
Scenario 1 – Foundation Works |
NB1 |
Scenario 2 – Piling |
NB2 |
||
Scenario 3 – Formwork/Concreting |
NB3 |
||
Scenario 4 – Backfilling Works |
NB4 |
||
Scenario 5 - Erection |
NB5 |
Notes (1):
Includes minor works associated with utilities.
(2):
No drainage works are required for the slope stabilisation works. Noise associated with the drainage and
shotcreting works for the remediation of slopes on the existing Tung Chung Road
are considered to be minor but covered in Table 5.8d.
5.3.1.4 The equipment included in each of these scenarios, together with the appropriate sound power levels are provided in Tables 5.3 to 5.7 below for roadworks, bridge works, slope stabilisation works, slope remediation works and noise mitigation works respectively. As noted, in Section 2.7.2, the equipment lists have been confirmed by the Project Proponent as being practical for completing the works.
Table 5.3: Typical Equipment Requirement for Road Construction
CNP Equipment Code |
Equipment
Scenario |
Sound
Power Level
(SWL) in dB(A) |
Number of
Equipment |
Total
Sound Power Level (SWL) in dB(A) |
Earthworks |
||||
Scenario
E1 |
Excavation
of earth / rock and removal |
|||
028 |
Breaker |
122 |
2 |
125.9 |
067 |
Dump Truck |
117 |
1 |
|
081 |
Excavator |
112 |
1 |
|
282 |
Water Pump (Petrol) |
103 |
1 |
|
Scenario
E2 |
Spreading
of earth / rock |
|||
030 |
Bulldozer |
115 |
1 |
119.5 |
067 |
Dump Truck |
117 |
1 |
|
204 |
Scraper |
109 |
1 |
Scenario
E3 |
Forming of earthworks |
|||
030 |
Bulldozer |
115 |
1 |
120.7 |
104 |
Grader |
113 |
1 |
|
067 |
Dump Truck |
117 |
1 |
|
186 |
Roller Vibratory |
108 |
1 |
|
050 |
Compactor |
105 |
1 |
|
169 |
Power Rammer (Petrol) |
108 |
1 |
|
Retaining wall construction |
||||
Scenario
R1 |
Foundation
works |
|
||
028 |
Breaker |
122 |
2 |
125.9 |
067 |
Dump Truck |
117 |
1 |
|
081 |
Excavator |
112 |
1 |
|
282 |
Water Pump (Petrol) |
103 |
1 |
|
Scenario
R2(1) |
Piling |
|
|
|
164 |
Piling Rig |
115 |
1 |
116.9 |
282 |
Water Pump |
103 |
1 |
|
141 |
Lorry |
112 |
1 |
|
165 |
Piling, large diameter bored, oscillator * |
115 |
1 |
|
Scenario
R3 |
Formwork /
concreting |
|||
044 |
Concrete Lorry Mixer |
109 |
1 |
117.9 |
170 |
Poker |
113 |
1 |
|
101 |
Generator |
108 |
1 |
|
201 |
Saw, circular |
108 |
1 |
|
282 |
Water pump |
103 |
1 |
|
043 |
Chipper |
112 |
1 |
|
066 |
Dumper |
106 |
1 |
|
|
|
|
|
|
|
|
|
|
|
CNP Equipment Code |
Equipment Scenario |
Sound
Power Level
(SWL) in dB(A) |
Number of
Equipment |
Total
Sound Power Level (SWL) in dB(A) |
Scenario
R4 |
Backfilling
works |
|||
050 |
Compactor Vibratory |
105 |
1 |
117.8 |
067 |
Dump Truck |
117 |
1 |
|
186 |
Roller Vibratory |
108 |
1 |
|
|
Pavement Construction |
|
||
Scenario
P1 |
Preparation of Roadbase |
|||
186 |
Vibratory roller |
108 |
1 |
118.6 |
067 |
Dump truck |
117 |
1 |
|
081 |
Excavator |
112 |
1 |
|
Scenario
P2 |
Laying of
Surface Material |
|
||
004 |
Asphalt paver |
109 |
1 |
119.0 |
185 |
Road roller |
108 |
1 |
|
067 |
Dump Truck |
117 |
1 |
|
186 |
Vibratory roller |
108 |
1 |
|
044 |
Concrete Lorry Mixer |
109 |
1 |
|
Scenario P3 |
Road
Marking |
|
||
161 |
Paint line marker |
90 |
1 |
115.0 |
203 |
Saw |
115 |
1 |
* The
piling oscillator will be required to be used with the piling rig (CNP
164). However, as these pieces of
equipment will be used alternately and never concurrently, the total SWL has
been based upon the SWL of only one piece of equipment (ie one SWL of 115
only).
(1) The
equipment which will be used for the detailed ground investigation will be
similar to that required for the bored piling.
However, the bored piling rig will be noisier than the rig used for the
ground investigation.
Table 5.4: Typical Equipment Requirement for Bridge Construction
CNP Equipment
Code |
Equipment
Scenario |
Sound
Power Level
(SWL) in dB(A) |
Number of
Equipment |
Total
Sound Power Level (SWL) in dB(A) |
Deck Construction |
||||
Scenario
D1 |
Formwork |
|
||
021 |
Bar Bender and cutter |
90 |
1 |
119.8 |
171 |
Planer |
117 |
1 |
|
101 |
Generator |
108 |
1 |
|
201 |
Saw |
108 |
1 |
|
043 |
Chipper, hand-held |
112 |
1 |
|
141 |
Lorry |
112 |
1 |
|
Scenario
D2 |
Concreting |
|||
044 |
Concrete lorry mixer |
109 |
1 |
115.5 |
047 |
Concrete pump |
109 |
1 |
|
170 |
Poker |
113 |
1 |
|
Scenario
D3 |
Elevation |
|
||
048 |
Crane |
112 |
1 |
112.0 |
|
||||
Foundation/Pier Construction |
||||
Scenario
F1 |
Excavation |
|||
027 |
Breaker |
122 |
2 |
125.9 |
067 |
Dump truck |
117 |
1 |
|
081 |
Excavator |
112 |
1 |
|
282 |
Water Pump |
103 |
1 |
|
Scenario
F2 |
Piling |
|
||
164 |
Piling Rig |
115 |
1 |
119.1 |
283 |
Water Pump |
85 |
1 |
|
067 |
Dump Truck |
117 |
1 |
|
165 |
Piling, large diameter bored, oscillator* |
115 |
1 |
|
Scenario
F3 |
Formwork |
|||
021 |
Bar Bender |
90 |
1 |
118.0 |
171 |
Planer |
117 |
1 |
|
101 |
Generator |
108 |
1 |
|
201 |
Saw |
108 |
1 |
|
Scenario
F4 |
Concreting |
|
||
047 |
Concrete pump |
109 |
1 |
115.5 |
044 |
Concrete lorry mixer |
109 |
1 |
|
170 |
Poker |
113 |
1 |
* The
piling oscillator will be required to be used with the piling rig (CNP
164). However, as these pieces of
equipment will be used alternately and never concurrently, the total SWL has
been based upon the SWL of only one piece of equipment (ie one SWL of 115 dB(A)
only).
Table 5.5 Typical Equipment Requirement for Slope Stabilisation Works
CNP Equipment
Code |
Equipment
Scenario |
Sound
Power Level
(SWL) in dB(A) |
Number of
Equipment |
Total
Sound Power Level (SWL) in dB(A) |
Rock Dowelling |
||||
Scenario
SS1 |
Rock
Dowelling |
|||
183 |
Rock Drill, hand held |
116 |
1 |
116.3 |
003 |
Compressor |
104 |
1 |
|
Equipment Transportation |
||||
Scenario
SS2 |
Delivery
by Helicopter(1) |
(1)
The assessment of
helicopter noise has been based upon the Lmax for typical helicopter
models and not the SWL.
Table 5.6 Typical Equipment Requirement for Slope Remediation Works
CNP Equipment
Code |
Equipment
Scenario |
Sound
Power Level
(SWL) in dB(A) |
Number of
Equipment |
Total
Sound Power Level (SWL) in dB(A) |
Slope Remediation Earthworks |
||||
Scenario SR1 |
Earthworks |
|||
081 |
Excavator |
112 |
1 |
118.2 |
067 |
Dump Truck |
117 |
1 |
|
Slope Nailing |
||||
Scenario SR2 |
Slope Nailing |
|||
183 |
Rock Drill, hand held |
116 |
1 |
116.3 |
003 |
Compressor |
104 |
1 |
Table
5.7 Typical Equipment Requirement for
the Construction of Permanent Noise Barrier in Tung Chung Valley
CNP Equipment
Code |
Equipment
Scenario |
Sound
Power Level
(SWL) in dB(A) |
Number of
Equipment |
Total
Sound Power Level (SWL) in dB(A) |
Noise Barrier Construction |
||||
Scenario
NB1 |
Foundation works |
|
||
Scenario NB1A |
||||
026 |
Breaker, Hand Held |
114 |
1 |
114.3 |
002 |
Air compressor |
102 |
1 |
|
Scenario NB1B |
||||
081 |
Excavator |
112 |
1 |
112.5 |
282 |
Water Pump |
103 |
1 |
|
Scenario NB1C |
||||
141 |
Lorry with grab# |
112 |
1 |
112.0 |
Scenario
NB2 |
Piling |
|
||
- |
Mini Piling Rig* |
113 |
1 1 |
113.4 |
282 |
Water Pump |
103 |
1 1 |
|
Scenario
NB3 |
Formwork /
concreting |
|
||
044 |
Concrete Lorry Mixer |
109 |
1 |
114.8 |
170 |
Poker |
113 |
1 |
|
282 |
Water pump |
103 |
1 |
|
Scenario
NB4 |
Backfilling
works |
|
||
Scenario
NB4A |
||||
050 |
Compactor Vibratory |
105 |
1 |
105.0 |
Scenario
NB4B |
||||
141 |
Lorry with grab# |
112 |
1 |
112.0 |
|
|
|
||
Scenario
NB5 |
Erection |
|
||
Scenario
NB5A |
||||
141 |
Lorry with grab# |
112 |
1 |
112.0 |
Scenario
NB5B |
||||
048 |
Crane |
112 |
1 |
112.0 |
* See
Table C.10, item 6 of BS 5228 for SWL
# Lorry
(CNP 141) is assumed for the purposes of the noise assessment.
5.3.2.1
Predicted
traffic flows used in the operational noise assessment have been discussed in
Section 2.8 of this report. Transport
Department have approved the traffic figures for use in the EIA and their
approval is presented in Appendix G.
5.4
Construction Noise Impact Assessment
5.4.1
Assessment Methodology
5.4.1.1
The
assessment of the proposed alignment has comprised an evaluation of the
construction noise impacts at representative sensitive receivers along its
length based upon the full range of construction activity scenarios detailed
above. The construction noise at the
NSRs has been assessed in accordance with the methodology of the Technical Memorandum on Noise from
Construction Work Other than Percussive Piling. The noise impact from the
use of a helicopter to deliver slope stabilisation equipment has also been
assessed. While the assessment of construction
noise has been based upon non-restricted periods, this does not preclude the
Contractor from working in restricted periods should this be required. However, any work in restricted periods will
be subject to the Contractor obtaining a valid Construction Noise Permit under
the Noise Control Ordinance as detailed in Section 3.3.2. It is likely that working up to 11.00pm will
be required and further assessment of this period is presented in Section
5.4.3.12 below.
5.4.1.2
Potential
cumulative impacts associated with the construction of the development in Tung
Chung Valley are assessed in Section 12.
There are no other cumulative impacts from other contemporary projects
in the vicinity.
5.4.1.3 Construction activities on site will involve the use of heavy machinery and as detailed in Section 5.3, an indicative schedule of key equipment to be used, activities to be carried out and duration of each segment of the works has been identified. Based upon the number and type of heavy plant to be employed in the construction works, noise levels generated will probably be high and impacts are a key issue.
5.4.2.1
The
maximum noise levels at the NSRs during the construction phase of the alignment
without noise mitigation
measures applied are shown below in Tables 5.8a and 5.8b for the road
earthworks and bridge works respectively, Tables 5.8c and 5.8d for the slope
stabilisation and slope remediation respectively and Table 5.8e for the
permanent noise barrier construction. The detailed modelling result is provide
in Appendix F and a summary of the maximum unmitigated levels at each NSR is
provided in Figures 5.2a to 5.2e.
Table 5.8a Maximum
Noise Levels (dB(A)) during Road Construction without Noise Mitigation
Sensitive Receiver |
Slant Distance (m) |
Noise Level without Mitigation, dB(A) |
|||||||||
(EW+PC/RW)(1) |
Earth Works |
Retaining Wall |
Pavement Construction |
||||||||
Scenario |
E1 |
E2 |
E3 |
R1 |
R2(2) |
R3 |
R4 |
P1 |
P2 |
P3 |
|
SWL |
125.9 |
119.5 |
120.7 |
125.9 |
116.9 |
117.9 |
117.8 |
118.6 |
119.0 |
115.0 |
|
SR1 |
235/325 |
73 |
67 |
68 |
71 |
62 |
63 |
63 |
66 |
67 |
63 |
SR2 |
114/238 |
80 |
73 |
75 |
73 |
64 |
65 |
65 |
72 |
73 |
69 |
SR3 |
256/425 |
73 |
66 |
68 |
68 |
59 |
60 |
60 |
65 |
66 |
62 |
SR4 |
56/162 |
86 |
80 |
81 |
77 |
68 |
69 |
69 |
79 |
79 |
75 |
SR5 |
162/211 |
77 |
70 |
72 |
74 |
65 |
66 |
66 |
69 |
70 |
66 |
SR6 |
244/248 |
73 |
67 |
68 |
73 |
64 |
65 |
65 |
66 |
66 |
62 |
SR7 |
202/206 |
75 |
68 |
70 |
75 |
66 |
67 |
66 |
67 |
68 |
64 |
SR8 |
229/241 |
74 |
67 |
68 |
73 |
64 |
65 |
65 |
66 |
67 |
63 |
SR9 |
156/161 |
77 |
71 |
72 |
77 |
68 |
69 |
69 |
70 |
70 |
66 |
SR10 |
276/271 |
72 |
66 |
67 |
72 |
63 |
64 |
64 |
65 |
65 |
61 |
SR11 |
267/272 |
72 |
66 |
67 |
72 |
63 |
64 |
64 |
65 |
65 |
61 |
SR12 |
263/252 |
72 |
66 |
67 |
73 |
64 |
65 |
65 |
65 |
66 |
62 |
SR13 |
32/32 |
91 |
84 |
86 |
91 |
82 |
83 |
83 |
83 |
84 |
80 |
SR14 |
151/145 |
77 |
71 |
72 |
78 |
69 |
70 |
70 |
70 |
70 |
66 |
SR15 |
55/96 |
86 |
80 |
81 |
81 |
72 |
73 |
73 |
79 |
79 |
75 |
SR16 |
166/164 |
76 |
70 |
71 |
77 |
68 |
69 |
68 |
69 |
70 |
66 |
SR17 |
240/234 |
73 |
67 |
68 |
73 |
65 |
66 |
65 |
66 |
66 |
62 |
SR18 |
291/291 |
72 |
65 |
66 |
72 |
63 |
64 |
63 |
64 |
65 |
61 |
76 |
Noise
Level at the sensitive receiver exceeds relevant criteria of 75dB(A) for
domestic premises |
(1): The first distance quoted relates
to both earth works and pavement construction and the second distance in the
column is from the NSR to the nearest retaining wall works. Locations of retaining walls are shown in
Figures 5.1a to f.
(2): Equipment for the piling
activities assumed to be noisier than that required for the detailed ground investigation. However, based upon a worst case scenario,
predicted noise levels for scenario R2 could be used to represent GI works.
Table 5.8b Maximum
Noise Levels (dB(A)) at NSRs during Bridge Construction without Noise
Mitigation
Sensitive Receiver* |
Slant Distance (m) |
Noise Level without Mitigation, dB(A) |
|||||||
Deck Construction |
Foundation Construction |
||||||||
Scenario |
D1 |
D2 |
D3 |
F1 |
F2 |
F3 |
F4 |
||
SWL |
119.8 |
115.5 |
112.0 |
125.9 |
119.1 |
118.0 |
115.5 |
||
SR9 |
159 |
71 |
67 |
63 |
77 |
70 |
69 |
67 |
|
SR10 |
277 |
66 |
62 |
58 |
72 |
65 |
64 |
62 |
|
SR11 |
323 |
65 |
60 |
57 |
71 |
64 |
63 |
60 |
|
SR12 |
295 |
65 |
61 |
58 |
71 |
65 |
64 |
61 |
|
SR13 |
231 |
67 |
63 |
60 |
74 |
67 |
66 |
63 |
|
SR14 |
206 |
68 |
64 |
61 |
75 |
68 |
67 |
64 |
|
SR15 |
218 |
68 |
64 |
60 |
74 |
67 |
66 |
64 |
|
SR16 |
375 |
63 |
59 |
56 |
69 |
63 |
62 |
59 |
|
SR17 |
460 |
62 |
57 |
54 |
68 |
61 |
60 |
57 |
|
SR18 |
501 |
61 |
57 |
53 |
67 |
60 |
59 |
57 |
|
|
|
|
|
|
|
|
|
|
|
76 |
Noise
Level at the sensitive receiver exceeds relevant criteria of 75dB(A) for
domestic premises |
||||||||
* The
distance between the SR1 to SR9, SR19 and the construction work is more than
500 metres, as such noise levels would not exceed the relevant noise criteria.
Table 5.8c Maximum
Noise Levels (dB(A)) at NSRs during Slope Stabilisation Works without
Noise Mitigation
Sensitive Receiver |
Slant Distance (m) |
Noise Level without Mitigation, dB(A) |
|
Scenario |
Rock Dowelling (SS1) |
||
Total SWL |
116.3 |
||
SR1 |
325 |
61 |
|
SR2 |
238 |
64 |
|
SR3 |
425 |
59 |
|
SR4 |
162 |
67 |
|
SR5 |
211 |
65 |
|
SR6 |
248 |
63 |
|
SR7 |
206 |
65 |
|
SR8 |
241 |
64 |
|
SR9 |
161 |
67 |
|
SR10 |
271 |
63 |
|
SR11 |
272 |
63 |
|
SR12 |
252 |
63 |
|
SR13 |
380 |
60 |
|
SR14 |
145 |
68 |
|
SR15 |
96 |
72 |
|
SR16 |
164 |
67 |
|
SR17 |
234 |
64 |
|
SR18 |
291 |
62 |
|
|
|||
76 |
Noise
Level at the sensitive receiver exceeds relevant criteria of 75dB(A) for
domestic premises. |
||
* Noise from transport of equipment by
helicopter assessed below
Table 5.8d Maximum
Noise Levels (dB(A)) at NSRs during Slope Remediation without Noise
Mitigation
Sensitive Receiver* |
Slant Distance (m) |
Noise Level with Mitigation, dB(A) |
|
Earthwork |
Soil Nailing |
||
Scenario |
SR1 |
SR2 |
|
SWL |
118.2 |
116.3 |
|
SR19 |
90 |
74 |
72 |
Note: * SR1 to SR18 located near the improved
Tung Chung Road, and will not affected by the slope remediation work on the
obsolete section of the existing Tung Chung Road. (see Figures 2.12 and 2.13).
** Drainage works and
shotcreting works associated with the slope remediation works would involve a
concrete pump (CNP047) and a concrete mixer (CNP046) with a combined SWL of 109
dB(A). Based upon the fact that no
adverse impacts have been predicted for the above noisier scenarios SR1 and
SR2, no impacts from the drainage works are expected.
Table 5.8e Maximum Noise Levels (dB(A)) during
Construction of Permanent Noise Barrier in Tung Chung Valley without
Noise Mitigation
Sensitive Receiver |
Slant Distance (m) |
Noise Level without Mitigation, dB(A) |
||||||||
Construction of Noise Barrier |
||||||||||
Scenario |
NB1A |
NB1B |
NB1C |
NB2 |
NB3 |
NB4A |
NB4B |
NB5A |
NB5B |
|
SWL |
114.3 |
112.5 |
112.0 |
113.4 |
114.8 |
105.0 |
112.0 |
112.0 |
112.0 |
|
SR1A |
200 |
63 |
61 |
61 |
62 |
64 |
54 |
61 |
61 |
61 |
SR1B |
179 |
64 |
62 |
62 |
63 |
65 |
55 |
62 |
62 |
62 |
SR1 |
153 |
66 |
64 |
63 |
65 |
66 |
56 |
63 |
63 |
63 |
SR1C |
149 |
66 |
64 |
64 |
65 |
66 |
57 |
64 |
64 |
64 |
SR2A |
96 |
70 |
68 |
67 |
69 |
70 |
60 |
67 |
67 |
67 |
SR2B |
60 |
74 |
72 |
71 |
73 |
74 |
64 |
71 |
71 |
71 |
SR2 |
40 |
77 |
75 |
75 |
76 |
78 |
68 |
75 |
75 |
75 |
SR2C |
21 |
83 |
81 |
81 |
82 |
83 |
74 |
81 |
81 |
81 |
SR2D |
25 |
81 |
80 |
79 |
80 |
82 |
72 |
79 |
79 |
79 |
SR3 |
242 |
62 |
60 |
59 |
61 |
62 |
52 |
59 |
59 |
59 |
SR4A |
50 |
75 |
74 |
73 |
74 |
76 |
66 |
73 |
73 |
73 |
SR4 |
48 |
76 |
74 |
73 |
75 |
76 |
66 |
73 |
73 |
73 |
SR4B |
39 |
77 |
76 |
75 |
77 |
78 |
68 |
75 |
75 |
75 |
SR4C |
46 |
76 |
74 |
74 |
75 |
77 |
67 |
74 |
74 |
74 |
SR4D |
25 |
81 |
80 |
79 |
80 |
82 |
72 |
79 |
79 |
79 |
SR5 |
168 |
65 |
63 |
62 |
64 |
65 |
55 |
62 |
62 |
62 |
Note: * SR6 to SR19 are located more than 300 meters away from the barrier construction works and thus will not be affected by these works.
76 |
Noise Level at the sensitive receiver
exceeds relevant criteria of 75dB(A) for domestic premises |
Transportation of Slope
Stabilisation Equipment by Helicopter
5.4.2.2
As
highlighted previously, some equipment required high up the hills may need to
be transported by helicopter. The areas
where the slope stabilisation works will be required are shown by the limit of
slope stabilisation in the figures in Section 2. Based upon the works, there is the potential for short term noise
impacts on the local residents.
5.4.2.3
The
TMEIA specifies a maximum level for helicopter noise at sensitive receivers
which is 85 Lmax dB(A).
However, if the helicopter is considered to be a piece of construction
equipment then the 75 dB(A) at the sensitive receivers should be met. Thus, in order to provide a full assessment,
comparison to both these standards has been made.
5.4.2.4
Based
upon two common helicopter types used in Hong Kong, the Lmax dB(A)
of each are detailed in Table 5.9 as follows:
Brand |
Model |
Users |
Reference Height (1) |
Lmax dB(A)
(1) |
Sikorsky |
S76 |
Government Flying Service, Private |
244m (800 feet) |
78dB(A) |
Aerospatiale (Eurocopter) |
AS355 |
Private |
153m (500 feet) |
77dB(A) |
Note (1): Source: UK Institute of Acoustics (IOA), Volume 14, Part 4 (1992) “Noise Levels of Helicopters Performing Elevated Pad Take-off and Landing Procedures”.
5.4.2.5
The
impact of noise from the helicopter can be calculated at the facades of the
representative NSRs in terms of maximum LAmax using basic acoustic
principles as follows:
At a specified distance, say D1, the Sound Pressure Level (Lp) should be
Lp(at D1) = Lw - distance attenuation (D1) ……(1)
where Lw is the Sound Power Level
Since the helicopter noise is a point source, then (1) can be converted:
Lp(at D1) = Lw - 20log(D1) ……(2)
At distance D2, then
Lp(at D2) = Lw - 20log (D2) ……(3)
Rearrange (2) and (3)
Lw=Lw, then,
Lp(at D1) + 20log (D1) = Lp (at D2) + 20 log(D2), and
Lp(at D2) = Lp(at D1) + 20log (D1) - 20log (D2), and
Lp(at D2) = Lp(at D1) + 20(log(D1/D2)) ……(4)
Equation (4) can be used to convert the reference noise level from the
helicopter measurement to the noise level at a specified distance. The facade correction factor is then
included.
5.4.2.6
The
predicted noise levels in Lmax dB(A) based on the two different
helicopter types at a set of distances from noise sensitive receivers are shown
in Table 5.10 below.
Table 5.10 Predicted Helicopter Noise (Lmax
dB(A))
Distance (metres) |
Sikorsky S76 |
Aerospatiale
AS355 |
||
Reference Noise
Level 78 |
Reference Distance, 244 m |
Reference Noise
Level 77 |
Reference Distance, 153 m |
|
Noise Level (non-building) |
Noise Level (facade) |
Noise Level
(non-building) |
Noise Level (facade) |
|
10 |
106 |
109 |
101 |
104 |
20 |
100 |
103 |
95 |
98 |
30 |
96 |
99 |
91 |
94 |
40 |
94 |
97 |
89 |
92 |
50 |
92 |
95 |
87 |
90 |
60 |
90 |
93 |
85 |
88 |
70 |
89 |
92 |
84 |
87 |
80 |
88 |
91 |
83 |
86 |
90 |
87 |
90 |
82 |
85 |
100 |
86 |
89 |
81 |
84 |
110 |
85 |
88 |
80 |
83 |
120 |
84 |
87 |
79 |
82 |
130 |
83 |
86 |
78 |
81 |
140 |
83 |
86 |
78 |
81 |
150 |
82 |
85 |
77 |
80 |
160 |
82 |
85 |
77 |
80 |
170 |
81 |
84 |
76 |
79 |
180 |
81 |
84 |
76 |
79 |
190 |
80 |
83 |
75 |
78 |
200 |
80 |
83 |
75 |
78 |
210 |
79 |
82 |
74 |
77 |
220 |
79 |
82 |
74 |
77 |
230 |
79 |
82 |
73 |
76 |
240 |
78 |
81 |
73 |
76 |
250 |
78 |
81 |
73 |
76 |
260 |
77 |
80 |
72 |
75 |
270 |
77 |
80 |
72 |
75 |
280 |
77 |
80 |
72 |
75 |
290 |
76 |
79 |
71 |
74 |
300 |
76 |
79 |
71 |
74 |
310 |
76 |
79 |
71 |
74 |
320 |
76 |
79 |
71 |
74 |
330 |
75 |
78 |
70 |
73 |
340 |
75 |
78 |
70 |
73 |
350 |
75 |
78 |
70 |
73 |
360 |
75 |
78 |
70 |
73 |
370 |
74 |
77 |
69 |
72 |
380 |
74 |
77 |
69 |
72 |
390 |
74 |
77 |
69 |
72 |
400 |
74 |
77 |
69 |
72 |
410 |
73 |
76 |
68 |
71 |
420 |
73 |
76 |
68 |
71 |
430 |
73 |
76 |
68 |
71 |
440 |
73 |
76 |
68 |
71 |
450 |
73 |
76 |
68 |
71 |
460 |
72 |
75 |
67 |
70 |
470 |
72 |
75 |
67 |
70 |
480 |
72 |
75 |
67 |
70 |
490 |
72 |
75 |
67 |
70 |
500 |
72 |
75 |
67 |
70 |
5.4.2.7
In
accordance with Hong Kong’s Civil Aviation Department requirements, helicopters
must operate outside a 500ft (152 metres) ceiling from residential
properties. This distance, will,
therefore, be the shortest distance between the noise sensitive receivers and
any helicopter noise. Based upon the results in Table 5.9, it can be seen that
the maximum noise of both helicopter types would not exceed the 85dB(A) noise
limit at this distance.
5.4.2.8
Based
upon the testing and investigation, the approximate area for slope
stabilisation works is shown in Section 2. The distance between slope
stabilisation work and the nearest sensitive receivers is about 500 metres.
According to the result shown in Table 5.10, the Lmax for the
helicopter, the Sikorsky S76 and Aerospatiale AS355,
is 75 and 70 dB(A) at 500m respectively which is within the 85 dB(A) criteria.
The noise at the sensitive receivers is also within the 75 dB(A) noise criteria
if the helicopter is considered to be a piece of construction equipment.
5.4.2.9
The
helicopter pick-up location will be located at the proposed Contractor’s works
area which is shown in Figure 2.10.
This area is 400 meters away from the nearest existing noise sensitive
receivers. Based upon this distance and
the levels provided in Table 5.10 above, the maximum noise level at the closest
sensitive receiver would be 77 and 72 for the Sikorsky S76 and Aerospatiale
helicopters respectively. Thus, the
Sikorsky S76 helicopter would marginally exceed the noise criteria 75dB(A) if
the helicopter remained on the works area for a period of 30 minutes.
5.4.2.10
It has been determined that in order to meet the 75
dB(A) standard, the operation of the helicopter at the pick-up location should
be restricted to 60%, which equates to the helicopter operating for only 18
minutes in any half hour period at the pick-up point. This period is more than
sufficient for the helicopter to remove or drop off equipment in this location
and move away. In addition, the scenarios assessed are the worst case, with
noise levels being lower with a quieter helicopter.
5.4.2.11
Thus,
no unacceptable impacts are predicted from the use of the helicopter, as is the
case for the slope stabilisation and slope remediation activities associated
with the new road.
5.4.2.12
However,
the results detailed above for road construction, bridge construction and noise
barrier construction in Tung Chung Valley indicate that, the maximum noise
levels at some of the NSRs will exceed the day time noise criteria of 75dB(A).
Mitigation measures are, therefore, required to reduce the noise levels to meet
the standards. Recommended mitigation measures are detailed in Section 5.4.3.
5.4.3
Construction Mitigation Measures
5.4.3.1
Based
upon the anticipated construction scenarios for the main alignment, the maximum
noise levels at the closest NSRs would exceed the 75dB(A) noise guideline for
non restricted hours at residential properties during road construction and
permanent noise barrier construction.
Thus, the following noise mitigation measures should be implemented to
reduce the construction noise to an acceptable level. The noise
mitigation measures and the sound reduction estimated are based on current
noise control technologies and BS5228 and have been confirmed by the Project
Proponent as being practical.
5.4.3.2 Noise mitigation measures are recommended at SRs 2, 4, 5, 9, 13-16 during road construction and SR9 during bridge construction and SRs 2 and 4 in Tung Chung Valley during permanent noise barrier construction as detailed below in Tables 5.11 and 5.12 respectively.
Table 5.11: Recommended
Mitigation Measures for the Noisy Equipment during Road Construction and Bridge
Construction
Plant |
Mitigation
Measures* |
Noise
Reduction, dB(A)* |
Reduction
Assumed, dB(A) |
·
Breaker (Excavator
Mounted) |
¨
Fit suitably designed muffler
or sound reduction equipment. ¨
Use dampened bit to eliminate
ringing |
Up to 15 |
5 |
|
|
|
|
· Dump Truck ·
Excavator ·
Bulldozer ·
Concrete Lorry Mixer |
¨
Fit more efficient
exhaust sound reduction equipment ¨
Manufacturers’
enclosure panels should be kept closed |
5 to 10 |
5 |
·
Chipper · Poker |
¨
Fit suitably designed muffler
or sound reduction equipment. ¨
Ensure all leaks in air line
are sealed ¨
Use dampened bit to eliminate
ringing |
Up to 15 |
5 |
* Reference: Noise and vibration control on
construction and open sites, BS5228: Part 1: 1997, P.15-16.
Table 5.12 Recommended Mitigation
Measures for the Noisy Equipment during Permanent Noise Barrier Construction
Plant |
Mitigation
Measures* |
Noise
Reduction, dB(A)* |
Reduction
Assumed, dB(A) |