Table 12.7 Implementation Schedule of Fisheries Impact Measures
EIA Ref |
EM&A Ref |
Environmental Protection Measures* |
Location / Timing |
Implementation Agent |
Implementation Stages** |
Relevant Legislation & Guidelines |
||
D |
C |
O |
||||||
9.29 |
8.3 |
Use of closed grab dredging and silt curtains around the immediate dredging area and low dredging rates as recommended in Water Quality of the EIA report |
Marine works site, during dredging works |
Contractor |
|
Ö |
|
TM on EIA Process |
9.32 |
Section 8 |
Water quality monitoring (see Implementation Schedule for Water Quality Control Measures) |
Designated monitoring locations / throughout construction period and 1 year following operation of the STW
|
Contractor and Environmental Team |
|
Ö |
Ö |
EM&A Manual |
* All recommendations and requirements resulted during the course of EIA Process, including ACE and/or accepted public comment to the proposed project.
** D=Design, C=Construction, O=Operation
N/A Not applicable