Table 12.7       Implementation Schedule of Fisheries Impact Measures

 

EIA Ref

EM&A Ref

Environmental Protection Measures*

Location / Timing

Implementation Agent

Implementation Stages**

Relevant Legislation & Guidelines

D

C

O

9.29

8.3

Use of closed grab dredging and silt curtains around the immediate dredging area and low dredging rates as recommended in Water Quality of the EIA report

Marine works site, during dredging works

Contractor

 

Ö

 

TM on EIA Process

9.32

Section 8

Water quality monitoring  (see Implementation Schedule for Water Quality Control Measures)

Designated monitoring locations / throughout construction period and 1 year following operation of the STW

 

Contractor and Environmental Team

 

Ö

Ö

EM&A Manual

*            All recommendations and requirements resulted during the course of EIA Process, including ACE and/or accepted public comment to the proposed project.

**            D=Design, C=Construction, O=Operation