Table 12.8 Implementation Schedule of Landscape and Visual Impact Measures
EIA Ref |
EM&A Ref |
Environmental Protection Measures* |
Location / Timing |
Implementation Agent |
Implementation Stages ** |
Relevant Legislation & Guidelines |
||
D |
C |
O |
||||||
Construction Phase |
||||||||
10.74 |
9.10 |
Retaining existing trees and minimizing damage to vegetation by close coordination and on site alignment adjusted of rising main and gravity sewer pipelines.
|
All sites |
Contractor |
|
Ö |
|
WBTC No. 14/2002 |
|
|
Careful and efficient transplanting of affected trees to temporary or final transplant location (the proposed tree to be transplanted is a semi-mature Macaranga tanarius and is located at the proposed Pumping Station P2 location).
|
All sites |
Contractor |
|
Ö |
|
WBTC No. 14/2002 |
|
|
Short excavation and immediate backfilling sections upon completion of works to reduce active site area.
|
All sites |
Contractor |
|
Ö |
|
|
|
|
Screening of site construction works by use of hoarding that is appropriate to its site.
|
All sites |
Contractor |
|
Ö |
|
WBTC No. 19/2001 |
|
|
Conservation of topsoil for reuse.
|
All sites |
Contractor |
|
Ö |
|
|
|
|
Night-time light source from marine fleets should be directed away from the residential units.
|
Outfall area. |
Contractor |
|
Ö |
|
|
Operation Phase |
||||||||
10.75 |
9.12 |
Architectural finishes to proposed structures, which area sympathetic to the surrounding landscape
|
Pumping stations and STW |
DSD |
|
Ö |
|
|
|
|
Soft landscape to proposed structures |
Pumping stations and STW |
DSD |
|
Ö |
Ö |
WBTC No. 14/2002 |
|
|
Planting to reformed slope in-keeping with the surrounding landscape character |
Reformed Slope behind STW |
DSD |
|
Ö |
Ö |
WBTC No. 17/2000 & 25/93 |
|
|
Appropriate finishes to reinstated areas of footpath in-keeping with existing finishes |
All sites |
DSD |
|
Ö |
Ö |
WBTC No. 14/2002 |
|
|
Appropriate paint finishes to sections of exposed pipeline |
All sites |
DSD |
|
Ö |
Ö |
|
* All recommendations and requirements resulted during the course of EIA Process, including ACE and/or accepted public comment to the proposed project.
** D=Design, C=Construction, O=Operation
N/A Not applicable