Appendix 4.3    
Assumed Powered Mechanical Equipment for Submarine Outfall Construction (Unmitigated)
Erection of Steel Working Platflorm
Powered Mechanical Equipment Reference No. Items SWL/Item On-time Sub-total Total SWL Total SWL
(PME)     dB(A) % SWL dB(A) dB(A) dB(A)
Stage 1: Setting up Steel Working Platform          
Air Compressor CNP 003 1 104 100% 104    
Percussion Drill rig, equiped with down the hole hammer CNP 164 1 115 100% 115    
Generator CNP101 1 108 100% 108    
Crane CNP 048 1 112 100% 112    
Barge CNP 016 1 104 100% 104 117.7 117.69
Stage 2: Grouting    
Generator CNP101 1 108 100% 108    
Grout Pump CNP 106 1 105 100% 105 109.8 109.76
Stage 3: Installation of Steel Casing in Rock      
Air Compressor CNP 003 1 104 100% 104    
Percussion Drill rig, equiped with ODEX CNP 164 1 115 100% 115 115.3 115.33
Note:  Stages 1, 2 and 3 would not be conducted concurrently
Erection of Scaffold
Powered Mechanical Equipment Reference No. Items SWL/Item On-time Sub-total Total SWL Total SWL
(PME)     dB(A) % SWL dB(A) dB(A) dB(A)
Generator CNP101 1 108 100% 108    
Vibrating Hammer CNP 172 1 115 100% 115    
Barge CNP 016 1 104 100% 104 6 116.07
Drilling and Installation of HDPE Pipeline
Powered Mechanical Equipment Reference No. Items SWL/Item On-time Sub-total Total SWL Total SWL
(PME)     dB(A) % SWL dB(A) dB(A) dB(A)
Horizontal Drilling System1 CNP 101 1 108 100% 108 111.6  
Direct-drive mixing system1 CNP 101 1 108 100% 108
Reclaimer2 CNP 282 1 103 100% 103
Note:
1      Based on diesel generator
2      Based on water pump
BS  BS5228 (1997) Part 1 Noise and Vibration Control on Construction and open sites