Appendix 4.3 |
Assumed Powered Mechanical Equipment for Submarine Outfall
Construction (Unmitigated) |
|
|
|
|
|
|
|
Erection of Steel Working
Platflorm |
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Stage 1:
Setting up Steel Working Platform |
|
|
|
|
|
|
|
Air
Compressor |
CNP 003 |
1 |
104 |
100% |
104 |
|
|
Percussion Drill rig, equiped with down the hole hammer |
CNP 164 |
1 |
115 |
100% |
115 |
|
|
Generator |
CNP101 |
1 |
108 |
100% |
108 |
|
|
Crane |
CNP 048 |
1 |
112 |
100% |
112 |
|
|
Barge |
CNP 016 |
1 |
104 |
100% |
104 |
117.7 |
117.69 |
Stage 2: Grouting |
|
|
|
|
|
|
Generator |
CNP101 |
1 |
108 |
100% |
108 |
|
|
Grout Pump |
CNP 106 |
1 |
105 |
100% |
105 |
109.8 |
109.76 |
Stage
3: Installation of Steel Casing in Rock |
|
|
|
|
|
|
Air Compressor |
CNP 003 |
1 |
104 |
100% |
104 |
|
|
Percussion Drill rig, equiped with ODEX |
CNP 164 |
1 |
115 |
100% |
115 |
115.3 |
115.33 |
Note: Stages 1, 2 and 3 would not be conducted
concurrently |
|
|
|
|
|
|
|
|
|
|
|
|
Erection of Scaffold |
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Generator |
CNP101 |
1 |
108 |
100% |
108 |
|
|
Vibrating Hammer |
CNP 172 |
1 |
115 |
100% |
115 |
|
|
Barge |
CNP 016 |
1 |
104 |
100% |
104 |
6 |
116.07 |
|
|
|
|
|
|
|
Drilling and Installation of
HDPE Pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
Powered Mechanical Equipment |
Reference |
No. Items |
SWL/Item |
On-time |
Sub-total |
Total SWL |
Total SWL |
(PME) |
|
|
dB(A) |
% |
SWL dB(A) |
dB(A) |
dB(A) |
Horizontal Drilling System1 |
CNP 101 |
1 |
108 |
100% |
108 |
111.6 |
|
Direct-drive
mixing system1 |
CNP 101 |
1 |
108 |
100% |
108 |
Reclaimer2 |
CNP 282 |
1 |
103 |
100% |
103 |
Note: |
|
|
|
|
|
|
1 Based on diesel
generator |
|
|
|
|
|
|
2 Based on water pump |
|
|
|
|
|
|
BS BS5228 (1997) Part 1 Noise and Vibration
Control on Construction and open sites |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|