1                                            Alternative Pipeline Route

1.1                                      Introduction

Potentially, a container port, CT10, will be built to the west of Lantau (near Tai O).  If this is the case, it will hence be necessary to alter the LNG submarine gas pipeline in order to avoid the intersection with the CT10 which may require dredging the port area to substantial depth for reclamation. 

As seen from the figure below, an alternative pipeline route was designed to bypass the CT10.  To assess any potential impacts due to the alternative pipeline route was thus simulated by Delft3D model.  

The same modelling approach as presented in the Section 3 of Annex 6A was adopted.  The modelling is mainly carried out for KP7 – 14, KP14 – KP20 and KP20 – KP34.5 since the changes are mainly at these three zones.  The model results are presented in the next section of this Appendix.

 


1.2                                      Model Results

1.2.1                                Suspended Solids

TSHD Dredging at Lantau Channel (KP7-14) 

Modelling results (Table 1.1) indicate that SS elevations will be compliant with the WQO and tolerance criterion at all sensitive receivers in both seasons.

TSHD Dredging at West Lantau (KP14-20)

Modelling results (Table 1.1) indicate that SS elevations will be compliant with the WQO at all sensitive receivers in both seasons, with the exception of SR12 (horseshoe crab habitat near Tai O).  As seen from Table 1.1, the maximum depth-averaged SS concentrations at Pak Tso Wan would be about 52.3 and 45.7 mg L-1, exceeding the WQOs of 8.9 and 5.6 mg L-1 in the dry and wet seasons, respectively, whereas the mean depth-averaged SS concentrations are comply with the WQO.  This suggests that the exceedances are not persistent.

Jetting at the Urmston Road Crossing (KP20-34.5)

Modelling results (Table 1.1) indicate that SS elevations will be compliant with the WQO at all sensitive receivers in both seasons, with the exception of SR6a and 6b (boundary of Sha Chau and Lung Kwu Chau Marine Park). 

The maximum depth-averaged SS elevations at SR6a and 6b will exceed the WQOs of 8.2 and 5.6 mg L-1 in the dry and wet seasons, respectively, whereas the mean depth-averaged SS concentrations are well below the WQO.  This indicates that the exceedances are in short duration. 

Figures 1.1 – 1.3 show the contour plots (mean depth-averaged) of SS elevations for the alternative gas pipeline route for the above three zones.  They show that the sediment plume is in low concentrations (mean over 15 day spring-neap cycle), i.e. below 5 mg L-1.   This shows that there are no continually unacceptable impacts to water quality.

1.2.2                                Sediment Deposition

The majority of SS elevations in water have been predicted to be temporary and to remain within relatively close proximity to the dredging or jetting works and, as such, the majority of sediment has been predicted to settle within relatively close proximity of the works areas.

The simulated deposition rates ([1]) at the artificial reefs (ARs), i.e., SR6e and SR7d during the dry and wet seasons have been assessed for the respective construction works. Table 1.2 summarises the predicted deposition rates. No exceedance are predicted at both ARs and hence no unacceptable impacts are expected to be posed by the works. 


 

Table 1.1        Predicted SS Elevation (mg L-1) for Alternative Pipeline Route

 

Sensitive Receiver

Name

ID

Depth (a)

WQO Allowable Elevation

TSHD Dredging at Lantau Channel

(KP7-14)

TSHD Dredging at West Lantau

(KP14-20)

Jetting at the Urmston Road Crossing

(KP20-34.5)

Max

Mean

Max

Mean

Max

Mean

Dry

Wet

Dry

Wet

Dry

Wet

Dry

Wet

Dry

Wet

Dry

Wet

Dry

Wet

Intertidal Mudflats

Pak Nai

SR01

s

7.1

3.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Horseshoe Crab Nursery Grounds

Pak Nai

SR01

a

9.7

6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Seagrass Beds/Mangroves/Oyster Farm

Pak Nai

SR02

s

7.1

3.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Seawater Intakes

Black Point Power Station

SR04

b

700 (b)

700 (b)

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Non-gazetted Beaches

Lung Kwu Sheung Tan

SR05a

a

8.2

5.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Non-gazetted Beaches

Lung Kwu Tan

SR05b

a

8.2

5.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Gazetted Beaches

Butterfly Beach

SR05c

a

8.2

5.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Marine Park

Designated Sha Chau and Lung Kwu Chau

SR06a

a

8.2

5.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

44.9 (c)

79.2(c)

1.1

0.8

Marine Park

Designated Sha Chau and Lung Kwu Chau

SR06b

a

8.2

5.6

0.2

0.0

0.0

0.0

0.2

0.0

0.0

0.0

12.8(c)

12.1(c)

0.8

0.2

Marine Park

Designated Sha Chau and Lung Kwu Chau

SR06c

a

8.2

5.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.2

0.0

0.0

0.0

Marine Park

Designated Sha Chau and Lung Kwu Chau

SR06d

a

8.2

5.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.4

0.3

0.0

0.0

Artificial Reef Deployment Area

Sha Chau and Lung Kwu Chau

SR06e

a

8.2

5.6

0.0

0.0

0.0

0.0

0.1

0.0

0.0

0.0

3.1

4.7

0.4

0.1

Seawater Intakes

Castle Peak Power Station

SR07a

b

700 (b)

700 (b)

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Seawater Intakes

Tuen Mun Area 38

SR07b

b

14.2

9.8

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Seawater Intakes

Airport

SR07c

b

8.9

8.8

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Seawater Intakes

Airport

SR07d

b

8.9

8.8

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Artificial Reef Deployment Area

Northeast Airport

SR07d

a

4.7

5.2

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Seawater Intakes

Airport

SR07e

b

8.9

8.8

0.0

0.0

0.0

0.0

0.0

0.1

0.0

0.0

0.0

0.6

0.0

0.0

Seawater Intakes

Airport

SR07f

b

8.9

8.8

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.1

0.0

0.0

Spawning/Nursery Grounds

Fisheries Spawning Ground in North Lantau

SR08

a

8.2

5.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Horseshoe Crab Nursery Grounds

Sham Wat Wan

SR10

a

8.9

6.5

0.4

0.2

0.0

0.0

1.2

1.3

0.2

0.1

2.0

2.5

0.1

0.1

Protection Zone

Chinese White Dolphin Protection Zone in Mainland Waters

SR11

a

8.9

6.5

0.6

0.4

0.1

0.0

0.2

0.1

0.0

0.0

0.4

0.3

0.0

0.0

Protection Zone

Chinese White Dolphin Protection Zone in Mainland Waters

SR11a

a

8.9

6.5

0.6

0.7

0.1

0.1

0.2

0.2

0.0

0.0

0.3

0.2

0.0

0.0

Protection Zone

Chinese White Dolphin Protection Zone in Mainland Waters

SR11b

a

8.9

6.5

0.5

0.8

0.1

0.0

0.2

0.3

0.0

0.0

0.3

0.2

0.0

0.0

Horseshoe Crab Nursery Grounds

Tai O

SR12

a

8.9

6.5

0.7

1.1

0.1

0.1

52.3(c)

45.7(c)

2.4

1.9

1.3

1.3

0.1

0.1

Intertidal Mudflats

Yi O

SR14

s

6.5

3.6

0.5

0.0

0.1

0.0

2.3

1.3

0.2

0.0

0.6

0.3

0.0

0.0

Horseshoe Crab Nursery Grounds

Yi O

SR14

a

8.9

6.5

0.7

0.9

0.2

0.1

3.1

3.9

0.4

0.2

0.7

0.4

0.1

0.0

Non-gazetted Beaches

Fan Lau Sai Wan

SR15a

a

6.9

5.5

0.7

0.8

0.2

0.1

0.4

0.4

0.1

0.0

0.2

0.1

0.0

0.0

Mangroves

Fan Lau Tung Wan

SR15b

s

4.5

3

0.1

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Non-gazetted Beaches

Fan Lau Tung Wan

SR15b

a

6.9

5.5

0.1

1.3

0.0

0.1

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Non-gazetted Beaches

Tsin Yue Wan

SR15c

a

6.9

5.5

0.8

0.5

0.2

0.1

0.6

0.7

0.1

0.1

0.2

0.3

0.0

0.0

Fish Fry Habitat

Pak Tso Wan

SR16b

a

6.9

5.5

0.2

0.2

0.0

0.0

0.0

0.1

0.0

0.0

0.0

0.0

0.0

0.0

Horseshoe Crab Nursery Grounds

Sha Lo Wan

SR18

a

7.8

4.8

0.2

0.1

0.0

0.0

0.5

0.2

0.1

0.0

0.7

1.5

0.0

0.1

Spawning/Nursery Grounds

Fisheries Spawning/Nursery Grounds in South Lantau

SR24

a

6.9

5.5

0.6

0.2

0.0

0.0

0.1

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Spawning/Nursery Grounds

Fisheries Spawning/Nursery Grounds in South Lantau

SR27

a

6.9

5.5

0.5

0.2

0.0

0.0

0.1

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Subtidal Hard Bottom Habitat (coral)

Southern Side of South Soko

SR31

a

10

10

0.0

0.2

0.0

0.0

0.0

0.1

0.0

0.0

0.0

0.0

0.0

0.0

Intertidal Mudflats

Shui Hau Wan

SR33

s

3.9

2.5

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Horseshoe Crab Nursery Grounds

Tong Fuk Miu Wan

SR33

a

4.8

3.9

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Gazetted Beaches

Tong Fuk

SR34

a

4.8

3.9

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Gazetted Beaches

Upper Cheung Sha Beach

SR35

a

4.8

3.9

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Seagrass Beds/Mangroves

Tung Chung Bay

SR39

s

6.5

3.6

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Horseshoe Crab Nursery Grounds

Tung Chung Bay

SR39

a

8.9

6.5

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

Notes:

a.       s = surface, m = middle, b = bottom, a = depth-averaged

b.       The assessment criterion of 700 mg L-1 was adopted for these seawater intakes.

c.        Shaded area indicates non-compliance with the assessment criterion.

 


Table 1.2        Predicted Deposition Rate (g m-2 day-1) for the Alternative Gas Pipeline Route at the Artificial Reefs and Subtidal Hard Bottom Habitat

Sensitive Receiver

Name

ID

Depth

WQO Allowable Elevation

TSHD Dredging at Lantau Channel

(KP7-14)

TSHD Dredging at West Lantau

(KP14-20)

Jetting at the Urmston Road Crossing

(KP20-34.5)

 

 

Dry

Wet

Dry

Wet

Dry

Wet

Dry

Wet

 

 

Max

Max

Max

Max

Max

Max

Artificial Reef Deployment Area

Sha Chau and Lung Kwu Chau

SR06e

b

200

200

0.0

0.0

0.1

0.0

15.1

3.7

Artificial Reef Deployment Area

Northeast Airport

SR07d

b

200

200

0.0

0.0

0.0

0.0

0.0

0.0


Figure 1.1       Predicted Mean Depth-Averaged SS Elevations (mg L-1) for TSHD Dredging at Lantau Channel (KP7-14)

Dry Season

Wet Season

Figure 1.2       Predicted Mean Depth-Averaged SS Elevations (mg L-1) for TSHD Dredging at West Lantau (KP14-20)

Dry Season

Wet Season

Figure 1.3       Predicted Mean Depth-Averaged SS Elevations (mg L-1) for Jetting at the Urmston Road Crossing (KP20-34.5)

Dry Season

Wet Season


1.3                                      Conclusion

 

Installation for the alternative gas pipeline route has been simulated by water quality model using the same modelling approach as for the proposed route presented in the EIA report Section 6.  This model results show that the SS elevations exceed the WQO at two locations whereas the SS deposition rate remain below the assessment criteria.  It is expected the SS exceedances are short-term and do not have unacceptable impacts to water quality. 

At the EIA stage, the alternative gas pipeline route is not considered to be a preferred option.  Should the alternative gas pipeline route be selected at next stage as a result of any planning uncertainties, a further impact detailed assessment should be conducted and the following implementations should be considered:

·      Jetting works next to the designated Sha Chau and Lung Kwu Chau Marine Park will be replaced by grab dredging in order to minimise the instantaneous SS elevations.

·      Dredging works along the route designated Sha Chau and Lung Kwu Chau Marine Park and in West Lantau will be operated during daytime (maximum 12 hours a day) and will avoid the peak calving season of the Indo-Pacific Humpback Dolphin, i.e. March through August.

·      Appropriate mitigation measures will be derived if any predicted WQO exceedances are predicted.

The residual impacts, if any, will be assessed.

 



([1])         The deposition rate is simulated as the total deposition divided by the duration of complete tidal cycle.