Agreement No. CE 35/2006(CE)
Kai Tak Development Engineering Study
cum Design and Construction of Advance Works
– Investigation, Design and Construction
Kai Tak Development
Environmental Monitoring and Audit Manual
Contents
14.......... hazard
to life. 14-1
14
hazard to life
14.1.1 Based on the results of the
Quantitative Risk Assessments (QRAs) for the operations of the Mau Tau Kok Gas
Works North Plant (MTKGWWNP) and its associated facilities, the Kwun Tong DG
Vehicular Ferry Pier (DGVFP), and the Kerry DG Godown, the risk levels at the
assessment year of 2012, 2016 and 2021 to the future occupants of the Project
are considered to be in compliance with the risk guidelines and no adverse
impact is expected. No mitigation measures and monitoring programme are
required.
14.1.2 With regards to the existing petrol
cum LPG filling stations / dedicated LPG filling stations in the proximity of
the KTD, the results of the QRAs indicated that the risk levels at the
assessment year of 2012, 2016 and 2021 to the future occupants of the Project
are also considered to be in compliance with the risk guidelines. No
mitigation measures and monitoring programme are required.