Content


Chapter    Title                                                                                                                           Page

1.               Introduction                                                                                                                      1-1

1.1              Background___________________________________________________________________ 1-1

1.2              Designated Projects under EIA Ordinance____________________________________________ 1-1

1.3              Objectives of the EIA Study________________________________________________________ 1-2

1.4              Key Environmental Issues_________________________________________________________ 1-3

1.5              Use of Relevant Studies__________________________________________________________ 1-5

1.6                  Structure of the EIA Report________________________________________________________ 1-5

2.               Project Description                                                                                                           2-1

2.1              Project Background______________________________________________________________ 2-1

2.2              Project Components_____________________________________________________________ 2-2

2.3              Need for the Project_____________________________________________________________ 2-2

2.4              Scope of the Project_____________________________________________________________ 2-4

2.5              Public Consultation______________________________________________________________ 2-6

2.6              Consideration of Design Alternatives________________________________________________ 2-7

2.7              Description of Construction Works_________________________________________________ 2-21

2.8              Consideration of Construction Methodologies_________________________________________ 2-25

2.9              Tentative Construction Programme_________________________________________________ 2-33

2.10                Concurrent Projects____________________________________________________________ 2-34

3.               Air Quality Impact                                                                                                             3-1

3.1              Introduction____________________________________________________________________ 3-1

3.2              Environmental Legislations, Standards and Guidelines__________________________________ 3-1

3.3              Baseline Condition and Sensitive Receivers___________________________________________ 3-3

3.4              Identification of Pollution Sources and Assessment Methodology___________________________ 3-6

3.5              Identification, Prediction and Evaluation of Environmental Impact_________________________ 3-20

3.6              Mitigation of Adverse Environmental Impact__________________________________________ 3-36

3.7              Evaluation of Residual Impact_____________________________________________________ 3-38

3.8              Environmental Monitoring and Audit________________________________________________ 3-39

3.9                  Conclusion___________________________________________________________________ 3-39

4.               Noise Impact Assessment                                                                                                 4-1

4.1              Introduction____________________________________________________________________ 4-1

4.2              Environmental Legislation, Standards and Guidelines___________________________________ 4-1

4.3              Assessment Area, Noise Sensitive Receivers and Background Noise Climate_________________ 4-5

4.4              Construction Phase Impact________________________________________________________ 4-8

4.5              Operation Phase Impact_________________________________________________________ 4-22

4.6              Environmental Monitoring and Audit________________________________________________ 4-35

4.7                  Conclusion___________________________________________________________________ 4-35

5.               Water Quality Impact                                                                                                         5-1

5.1              Introduction____________________________________________________________________ 5-1

5.2              Environmental Legislation, Standards and Guidelines___________________________________ 5-1

5.3              Assessment Area, Water Sensitive Receivers and Description of the Environment______________ 5-4

5.4              Assessment Methodology_________________________________________________________ 5-9

5.5              Identification, Prediction and Evaluation of Environmental Impact_________________________ 5-10

5.6              Mitigation of Adverse Environmental Impact__________________________________________ 5-14

5.7              Evaluation of Residual Impact_____________________________________________________ 5-19

5.8              Environmental Monitoring and Audit________________________________________________ 5-19

5.9                  Conclusion___________________________________________________________________ 5-19

6.               Sewerage and Sewage Treatment Impact                                                                           6-1

6.1              Introduction____________________________________________________________________ 6-1

6.2              Assessment Approach and Methodology_____________________________________________ 6-1

6.3              Design Assumptions, Parameters and Criteria_________________________________________ 6-2

6.4              Existing Sewerage Conditions_____________________________________________________ 6-5

6.5              Estimated Pollutant Loads due to the Project__________________________________________ 6-7

6.6              Proposed Mitigation Measures_____________________________________________________ 6-9

6.7              Short Term Measures during Construction Phase______________________________________ 6-13

6.8              Environmental Monitoring and Audit________________________________________________ 6-13

6.9                  Conclusion___________________________________________________________________ 6-13

7.               Waste Management Implications                                                                                       7-1

7.1              Introduction____________________________________________________________________ 7-1

7.2              Environmental Legislation, Standards and Guidelines___________________________________ 7-1

7.3              Assessment Methodology_________________________________________________________ 7-2

7.4              Identification, Prediction and Evaluation of Environmental Impact__________________________ 7-4

7.5              Opportunities for Reducing Waste Generation and Maximise Re-Use________________________ 7-7

7.6              Mitigation of Adverse Environmental Impacts__________________________________________ 7-9

7.7              Impacts Caused by Handling, Collection and Disposal of C&D Materials____________________ 7-11

7.8              Waste Handling Procedures and Routes_____________________________________________ 7-11

7.9              Evaluation of Residual Impacts____________________________________________________ 7-14

7.10            Environmental Monitoring and Audit________________________________________________ 7-14

7.11                Conclusion___________________________________________________________________ 7-14

8.               Land Contamination                                                                                                          8-1

8.1              Introduction____________________________________________________________________ 8-1

8.2              Environmental Legislation, Standards and Guidelines___________________________________ 8-1

8.3              Description of the Environment/ Baseline Conditions____________________________________ 8-1

8.4              Assessment Methodology_________________________________________________________ 8-4

8.5              Identification of Environmental Impact_______________________________________________ 8-4

8.6              Prediction and Evaluation of Environmental Impact_____________________________________ 8-6

8.7              Mitigation of Adverse Environmental Impact___________________________________________ 8-8

8.8              Evaluation of Residual Impact______________________________________________________ 8-9

8.9              Environmental Monitoring and Audit_________________________________________________ 8-9

8.10                Conclusion____________________________________________________________________ 8-9

9.               Ecological Impact                                                                                                             9-1

9.1              Introduction____________________________________________________________________ 9-1

9.2              Background___________________________________________________________________ 9-1

9.3              Environmental Legislation, Standards and Guidelines___________________________________ 9-7

9.4              Assessment Area and Ecological Survey Methodology___________________________________ 9-8

9.5              Ecological Baseline Condition____________________________________________________ 9-12

9.6              Habitat and Species Evaluation__________________________________________________ 9-104

9.7              Identification / Evaluation of Environmental Impact and Recommendation of Mitigation Measures 9-134

9.8              Mitigation Measures___________________________________________________________ 9-172

9.9              Evaluation of Cumulative Impact_________________________________________________ 9-181

9.10            Evaluation of Residual Impact____________________________________________________ 9-186

9.11            Environmental Monitoring and Audit_______________________________________________ 9-186

9.12            Conclusion__________________________________________________________________ 9-187

9.13                Reference___________________________________________________________________ 9-189

10.              Fisheries Impact                                                                                                             10-1

10.1            Introduction___________________________________________________________________ 10-1

10.2            Environmental Legislation, Standards and Guidelines__________________________________ 10-1

10.3            Assessment Methodology________________________________________________________ 10-1

10.4            Baseline Condition_____________________________________________________________ 10-1

10.5            Identification, Prediction and Evaluation of Environmental Impact_________________________ 10-2

10.6            Mitigation of Adverse Environmental Impact__________________________________________ 10-2

10.7            Evaluation of Residual Impact_____________________________________________________ 10-2

10.8            Environmental Monitoring and Audit________________________________________________ 10-2

10.9            Conclusion___________________________________________________________________ 10-3

10.10              References___________________________________________________________________ 10-3

11.              Landscape, Visual and Glare Impact                                                                                11-1

11.1            Introduction___________________________________________________________________ 11-1

11.2            Environmental Legislation, Standards and Guidelines__________________________________ 11-1

11.3            Scope and Content of the Study___________________________________________________ 11-2

11.4            Planning and Development Control Framework______________________________________ 11-10

11.5            Baseline Conditions___________________________________________________________ 11-15

11.6            Landscape Impact Assessment__________________________________________________ 11-53

11.7            Visual Impact Assessment_____________________________________________________ 11-105

11.8            Cumulative Effects___________________________________________________________ 11-148

11.9            Environmental Monitoring and Audit______________________________________________ 11-150

11.10          Conclusion_________________________________________________________________ 11-151

11.11              Glare Impact Assessment______________________________________________________ 11-161

12.              Impact on Cultural Heritage                                                                                              12-1

12.1            Introduction___________________________________________________________________ 12-1

12.2            Environmental Legislations, Standards and Guidelines_________________________________ 12-1

12.3            Assessment Methodology________________________________________________________ 12-3

12.4            Baseline Condition_____________________________________________________________ 12-7

12.5            Identification, Prediction and Evaluation of Potential Impacts____________________________ 12-32

12.6            Mitigation Measures (Preservation Proposals)_______________________________________ 12-43

12.7            Evaluation of Residual Impact____________________________________________________ 12-49

12.8            Environmental Monitoring and Audit_______________________________________________ 12-49

12.9                Conclusion__________________________________________________________________ 12-50

13.              Environmental Monitoring and Audit                                                                                 13-1

13.1            Introduction___________________________________________________________________ 13-1

13.2            Air Quality Impact______________________________________________________________ 13-1

13.3            Noise Impact__________________________________________________________________ 13-1

13.4            Water Quality Impact____________________________________________________________ 13-1

13.5            Sewerage and Sewage Treatment Implications_______________________________________ 13-2

13.6            Waste Management Implications__________________________________________________ 13-2

13.7            Land Contamination____________________________________________________________ 13-2

13.8            Ecological Impact______________________________________________________________ 13-2

13.9            Fisheries Impact_______________________________________________________________ 13-3

13.10          Landscape, Visual and Glare Impact________________________________________________ 13-3

13.11              Impact on Cultural Heritage______________________________________________________ 13-4

14.              Conclusion                                                                                                                     14-1

14.1            General______________________________________________________________________ 14-1

14.2                Summary of Environmental Outcomes, Benefits and Mitigation Measures___________________ 14-1

15.              Implementation Schedule of Mitigation Measures                                                             15-1

15.1                General______________________________________________________________________ 15-1

 

Figures

Figure 1.1              Project Layout Plan

Figure 1.1a           Project Layout Plan (Sheet 1 of 11)

Figure 1.1b           Project Layout Plan (Sheet 2 of 11)

Figure 1.1c            Project Layout Plan (Sheet 3 of 11)

Figure 1.1d           Project Layout Plan (Sheet 4 of 11)

Figure 1.1e           Project Layout Plan (Sheet 5 of 11)

Figure 1.1f            Project Layout Plan (Sheet 6 of 11)

Figure 1.1g           Project Layout Plan (Sheet 7 of 11)

Figure 1.1h           Project Layout Plan (Sheet 8 of 11)

Figure 1.1i             Project Layout Plan (Sheet 9 of 11)

Figure 1.1j             Project Layout Plan (Sheet 10 of 11)

Figure 1.1k            Project Layout Plan (Sheet 11 of 11)

Figure 2.1              Project Area – Description of Works

Figure 2.1a           Project Area – Description of Works (Sheet 1 of 11)

Figure 2.1b           Project Area – Description of Works (Sheet 2 of 11)

Figure 2.1c            Project Area – Description of Works (Sheet 3 of 11)

Figure 2.1d           Project Area – Description of Works (Sheet 4 of 11)

Figure 2.1e           Project Area – Description of Works (Sheet 5 of 11)

Figure 2.1f            Project Area – Description of Works (Sheet 6 of 11)

Figure 2.1g           Project Area – Description of Works (Sheet 7 of 11)

Figure 2.1h           Project Area – Description of Works (Sheet 8 of 11)

Figure 2.1i             Project Area – Description of Works (Sheet 9 of 11)

Figure 2.1j             Project Area – Description of Works (Sheet 10 of 11)

Figure 2.1k            Project Area – Description of Works (Sheet 11 of 11)

Figure 2.2              Finalised BCP Layout

Figure 2.3              Refined Alignment Options

Figure 2.4              Indicative Locations of Potential Concurrent Projects

 

Figure 3-1.1 to 3-1.11       Location of Air Sensitive Receivers and the Assessment Area)

Figure 3-2.1 to 3-2-11         Location of Potential Dust Emission Source

Figure 3-3.1 to 3-3.17         Location of 30% Active Areas of Dust Sources Assumed for Tier 2 Assessment

Figure 3-4.1a to 3-4.9a       Cumulative Result - Contour of Tier 1 Hourly TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (unmitigated)

Figure 3-4.1b to 3-4.9b     Cumulative Result  - Contour of Tier 1 Hourly TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (mitigated)

Figure 3-5.1 to 3-5.17       Cumulative Result  - Contour of Tier 2 Hourly TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (mitigated)

Figure 3-6.1a to 3-6.9a                       Cumulative Result  - Contour of Tier 1 Daily TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (unmitigated)

Figure 3-6.1b to 3-6.9b     Cumulative Result  - Contour of Tier 1 Daily TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (mitigated)

Figure 3-7.1 to 3-7.6         Cumulative Result  - Contour of Tier 2 Daily TSP Concentration (mg/m3) at 1.5m Above

Ground during Construction Phase (mitigated)

Figure 3-8.1a to 3-8.9a       Cumulative Result  - Contour of Annual TSP Concentration (mg/m3) at 1.5m Above Ground

during Construction Phase (unmitigated)

Figure 3-8.1b to 3-8.9b     Cumulative Result  - Contour of Annual TSP Concentration (mg/m3) at 1.5m Above Ground

during Construction Phase (mitigated)

Figure 3-9.1 to 3-9.11       Classifications of Road Types

Figure 3-10.1 to 3-10.9     Cumulative Result  - Contour of Hourly NO2 Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class D)

Figure 3-11.1 to 3-11.9                       Cumulative Result  - Contour of Daily NO2 Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class D)

Figure 3-12.1 to 3-12.9     Cumulative Result  - Contour of  Daily RSP Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class D)

Figure 3-13.1 to 3-13.9     Cumulative Result  - Contour of Hourly NO2 Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class F)

Figure 3-14.1 to 3-14.9                       Cumulative Result  - Contour of Daily NO2 Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class F)

Figure 3-15.1 to 3-15.9     Cumulative Result  - Contour of  Daily RSP Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase (Stability Class F)

Figure 3-16.1 to 3-16.9                 Cumulative Result  - Contour of Annual NO2 Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase

Figure 3-17.1 to 3-17.9                       Cumulative Result  - Contour of  Annual RSP Concentration (mg/m3) at 1.5m Above Ground

during Operational Phase

 

Figure 4.1.1          Assessment Area and Outline Zoning Plan

Figure 4.1.2          Recommended Development Plan (Sheet 1 of 2)

Figure 4.1.3          Recommended Development Plan (Sheet 2 of 2)

Figure 4.2              Representative Noise Sensitive Receivers (Sheet 1 of 11)

Figure 4.3              Representative Noise Sensitive Receivers (Sheet 2 of 11)

Figure 4.4              Representative Noise Sensitive Receivers (Sheet 3 of 11)

Figure 4.5              Representative Noise Sensitive Receivers (Sheet 4 of 11)

Figure 4.6              Representative Noise Sensitive Receivers (Sheet 5 of 11)

Figure 4.7              Representative Noise Sensitive Receivers (Sheet 6 of 11)

Figure 4.8              Representative Noise Sensitive Receivers (Sheet 7 of 11)

Figure 4.9              Representative Noise Sensitive Receivers (Sheet 8 of 11)

Figure 4.10           Representative Noise Sensitive Receivers (Sheet 9 of 11)

Figure 4.11           Representative Noise Sensitive Receivers (Sheet 10 of 11)

Figure 4.12           Representative Noise Sensitive Receivers (Sheet 11 of 11)

Figure 4.13           Photos of Noise Sensitive Receivers

Figure 4.14           Photos of Noise Sensitive Receivers

Figure 4.15           Photos of Noise Sensitive Receivers

Figure 4.16           Photos of Noise Sensitive Receivers

Figure 4.17           Photos of Noise Sensitive Receivers

Figure 4.18           Schematic Diagram of Movable Noise Barrier

Figure 4.19           Schematic Diagram of Full Noise Enclosure for PME

Figure 4.20.1        Proposed Location of Noise Barriers (Sheet 1 of 4)

Figure 4.20.2        Proposed Location of Noise Barriers (Sheet 2 of 4)

Figure 4.20.3        Proposed Location of Noise Barriers (Sheet 3 of 4)

Figure 4.20.4        Proposed Location of Noise Barriers (Sheet 4 of 4)

Figure 4.20.5        Cross-section Plans of Proposed Barriers

Figure 4.21.1        Fixed Plant of Boundary Control Point

Figure 4.21.2        Fixed Plant of North Tunnel North Portal

Figure 4.21.3        Fixed Plant of North Tunnel South Portal

Figure 4.21.4        Fixed Plant of Administration Building

Figure 4.21.5        Fixed Plant of South Tunnel North Portal

Figure 4.21.6        Fixed Plant of Mid-Ventilation Building

Figure 4.21.7        Fixed Plant of South Tunnel South Portal

 

Figure 5.1              Location of Water Control Zone

Figure 5.2              Locations of Key Water Sensitive Receivers

Figure 5.3              Location Plan of the Interception between Proposed Connecting Road Alignment and Existing Stream

 

Figure 6.1              General Layout Plan for BCP
Figure 6.2              General Layout Plan for the Proposed Treatment Process
Figure 6.3              Proposed Landscape at Lower Deck Level Plan for BCP
Figure 6.4              Proposed Landscape at Upper Deck Level Plan for BCP

 

Figure 7.1              Potential Locations of Piers

Figure 7.2              Locations of Possible Temporary Stockpiling Areas

Figure 9.1a           Ecological Assessment Area

Figure 9.1b           Sections of Works Area

Figure 9.2a           Habitat Map (Key Plan)

Figure 9.2b           Record Locations of Mammal Species Yellow-bellied Weasel and Crab-eating Mongoose around Assessment Area

Figure 9.3              Habitat Map (Sheet 1 of 12)

Figure 9.4              Habitat Map (Sheet 2 of 12)

Figure 9.5              Habitat Map (Sheet 3 of 12)

Figure 9.6              Habitat Map (Sheet 4 of 12)

Figure 9.7              Habitat Map (Sheet 5 of 12)

Figure 9.8              Habitat Map (Sheet 6 of 12)

Figure 9.9              Habitat Map (Sheet 7 of 12)

Figure 9.10           Habitat Map (Sheet 8 of 12)

Figure 9.11           Habitat Map (Sheet 9 of 12)

Figure 9.12           Habitat Map (Sheet 10 of 12)

Figure 9.13           Habitat Map (Sheet 11 of 12)

Figure 9.14           Habitat Map (Sheet 12 of 12)

Figure 9.15           Estimated Extent of Habitat to be Affected (Sheet 1 of 11)

Figure 9.16           Estimated Extent of Habitat to be Affected (Sheet 2 of 11)

Figure 9.17           Estimated Extent of Habitat to be Affected (Sheet 3 of 11)

Figure 9.18           Estimated Extent of Habitat to be Affected (Sheet 4 of 11)

Figure 9.19           Estimated Extent of Habitat to be Affected (Sheet 5 of 11)

Figure 9.20           Estimated Extent of Habitat to be Affected (Sheet 6 of 11)

Figure 9.21           Estimated Extent of Habitat to be Affected (Sheet 7 of 11)

Figure 9.22           Estimated Extent of Habitat to be Affected (Sheet 8 of 11)

Figure 9.23           Estimated Extent of Habitat to be Affected (Sheet 9 of 11)

Figure 9.24           Estimated Extent of Habitat to be Affected (Sheet 10 of 11)

Figure 9.25           Estimated Extent of Habitat to be Affected (Sheet 11 of 11)

Figure 9.26           Potential Woodland Compensation Area

Figure 9.27           Indicative Boundary of the Potential Wetland Compensation Area

Figure 9.28           Conceptual Plan and Typical Cross-section Views of the Proposed Wetland Compensation Area

Figure 11.1.0        Project Profile – Key Plan

Figure 11.1.1        Project Profile – Section A, Zone 1

Figure 11.1.2        Project Profile – Section A, Zones 1 & 2

Figure 11.1.3        Project Profile – Section A, Zones 2 & 3

Figure 11.1.4        Project Profile – Section A, Zones 2 & 3

Figure 11.1.5        Project Profile – Section B

Figure 11.1.6        Project Profile – Section C

Figure 11.2           Not Used

Figure 11.3.1        Proposed Landscape at Lower Deck Level Plan for BCP

Figure 11.3.2        Proposed Layout Plan at Upper Deck Level for BCP

Figure 11.3.3        BCP - Elevation

Figure 11.3.4        Ventilation Building Type A – G/F to 3/F Layout Plans

Figure 11.3.5        Ventilation Building Type A – 4/F Layout Plans & Section

Figure 11.3.6        Ventilation Building Type B – G/F to 3/F Layout Plans

Figure 11.3.7        Ventilation Building Type B – Section

Figure 11.3.8        Ventilation Building Type C – G/F to 3/F Layout Plans

Figure 11.3.9        Ventilation Building Type C – Section

Figure 11.3.10     Administration Building – Ground Floor Layout Plan

Figure 11.3.11     Administration Building – Section A-A, B-B

Figure 11.3.12     Viaduct – Typical Section

Figure 11.4.0        Existing Zonings within 500m Study Area – Key Plan

Figure 11.4.1        Existing Zonings within 500m Study Area Section A, Zones 1 & 2

Figure 11.4.2        Existing Zonings within 500m Study Area Section A, Zones 1 & 2

Figure 11.4.3        Existing Zonings within 500m Study Area Section A, Zones 2 & 3

Figure 11.4.4        Existing Zonings within 500m Study Area Section A, Zones 2 & 3

Figure 11.4.5        Existing Zonings within 500m Study Area Section B

Figure 11.4.6        Existing Zonings within 500m Study Area Section C

Figure 11.5.1        Landscape Resources – Key Plan

Figure 11.5.2        Landscape Resources – Section A, Zones 1 & 2

Figure 11.5.3        Landscape Resources – Section A, Zones 1 & 2

Figure 11.5.4        Landscape Resources – Section A, Zones 2 & 3

Figure 11.5.5        Landscape Resources – Section A, Zones 2 & 3

Figure 11.5.6        Landscape Resources – Section B

Figure 11.5.7        Landscape Resources – Section C

Figure 11.5.8        Landscape Character Areas – Key Plan

Figure 11.5.9        Landscape Character Areas – Section A, Zones 1 & 2

Figure 11.5.10      Landscape Character Areas – Section A, Zones 1 & 2

Figure 11.5.11      Landscape Character Areas – Section A, Zones 2 & 3

Figure 11.5.12      Landscape Character Areas – Section A, Zones 2 & 3

Figure 11.5.13      Landscape Character Areas – Section B

Figure 11.5.14      Landscape Character Areas – Section C

Figure 11.5.15      Photorecord of Various Landscape Resources – Section A, Zone 1

Figure 11.5.16      Photorecord of Various Landscape Resources – Section A, Zone 2

Figure 11.5.17      Photorecord of Various Landscape Resources – Section A, Zone 3

Figure 11.5.18      Photorecord of Various Landscape Resources – Section B

Figure 11.5.19      Photorecord of Various Landscape Resources – Section C

Figure 11.5.20      Visual Envelope

Figure 11.5.21      Location Plan of Visual Sensitive Receivers – Key Plan

Figure 11.5.22      Location Plan of Visual Sensitive Receivers (Sheet 1 of 4)

Figure 11.5.23      Location Plan of Visual Sensitive Receivers (Sheet 2 of 4)

Figure 11.5.24      Location Plan of Visual Sensitive Receivers (Sheet 3 of 4)

Figure 11.5.25      Location Plan of Visual Sensitive Receivers (Sheet 4 of 4)

Figure 11.5.26      Photorecords of Visually Sensitive Receivers (Sheet 1 of 2)

Figure 11.5.27      Photorecords of Visually Sensitive Receivers (Sheet 2 of 2)

Figure 11.6.0        Impact on Landscape Resources – Key Plan

Figure 11.6.1        Impact on Landscape Resources – Section A, Zone 1

Figure 11.6.2        Impact on Landscape Resources – Section A, Zones 1 & 2

Figure 11.6.3        Impact on Landscape Resources – Section A, Zone 2

Figure 11.6.4        Impact on Landscape Resources – Section A, Zone 3

Figure 11.6.5        Impact on Landscape Resources – Section B

Figure 11.6.6        Impact on Landscape Resources – Section C

Figure 11.6.7        Impact on Landscape Character Areas – Key Plan

Figure 11.6.8        Impact on Landscape Character Areas – Section A, Zone 1

Figure 11.6.9        Impact on Landscape Character Areas – Section A, Zones 1 & 2

Figure 11.6.10      Impact on Landscape Character Areas – Section A, Zone 2

Figure 11.6.11      Impact on Landscape Character Areas – Section A, Zone 3

Figure 11.6.12      Impact on Landscape Character Areas – Section B

Figure 11.6.13      Impact on Landscape Character Areas – Section C

Figure 11.7.0        Landscape and Visual Mitigation Plan – Key Plan

Figure 11.7.1        Landscape and Visual Mitigation Plan – Section A, Zone 1

Figure 11.7.2        Landscape and Visual Mitigation Plan – Section A, Zones 1 & 2

Figure 11.7.3        Landscape and Visual Mitigation Plan – Section A, Zone 2

Figure 11.7.4        Landscape and Visual Mitigation Plan – Section A, Zone 3

Figure 11.7.5        Landscape and Visual Mitigation Plan – Section B

Figure 11.7.6        Landscape and Visual Mitigation Plan – Section C

Figure 11.7.7        VPs for Photomontages – Key Plan

Figure 11.7.8        VP1 Photomontage at Ha Heung Yuen

Figure 11.7.9        VP2 Photomontage at Tsung Yuen Ha

Figure 11.7.10      VP3 Photomontage at Kaw Liu Village

Figure 11.7.11      VP4 Photomontage at Nga Yiu Ha

Figure 11.7.12      VP5 Photomontage at Lung Mei Teng

Figure 11.7.13      VP6 Photomontage at Village West of Man Uk Pin

Figure 11.7.14      VP7 Photomontage at Tai Tong Wu

Figure 11.7.15      VP8 Photomontage at Loi Tung Village

Figure 11.7.16      VP9 Photomontage at Lung Shan Temple

Figure 11.7.17      VP10 Photomontage at Dawning Views

Figure 11.7.18      VP11 Photomontage at Yuen Leng

Figure 11.7.19     VP12 Photomontage at Wilson Trail

 

Figure 12.1           Key Plan For Cultural Heritage Resources Recorded by AMO within the Study Area

Figure 12.2           Key Plan For Built Heritage

Figure 12.2.1        1:1000 Map Showing Built Heritage Identified Within the Boundary Control Point Section (Sheet 1

                                of 2)

Figure 12.2.2        1:1000 Map Showing Built Heritage Identified Within the Boundary Control Point Section (Sheet 2 of 2)

Figure 12.2.3        1:1000 Map Showing Built Heritage Identified Within Section Between Lin Ma Hang and Frontier Closed Area Boundary (Sheet 1 of 4)

Figure 12.2.4        1:1000 Map Showing Built Heritage Identified Within Section Between Lin Ma Hang and Frontier

Closed Area Boundary (Sheet 2 of 4)

Figure 12.2.5        1:1000 Map Showing Built Heritage Identified Within Section Between Lin Ma Hang and Frontier Closed Area Boundary (Sheet 3 of 4)

Figure 12.2.6        1:1000 Map Showing Built Heritage Identified Within Section Between Lin Ma Hang and Frontier Closed Area Boundary (Sheet 4 of 4)

Figure 12.2.7a      1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 1 of 6)

Figure 12.2.7b      1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 2 of 6)

Figure 12.2.8        1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 3 of 6)

Figure 12.2.9a      1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 4 of 6)

Figure 12.2.9b      1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 5 of 6)

Figure 12.2.9c      1:1000 Map Showing Built Heritage Identified Within Section Between Ping Yeung and Wo Keng Shan (Sheet 6 of 6)

Figure 12.2.10a   1:1000 Map Showing Built Heritage Identified Within Cheung Shan Tunnel Section (North Tunnel) (Sheet 1 of 3)

Figure 12.2.10b   1:1000 Map Showing Built Heritage Identified Within Cheung Shan Tunnel Section (North Tunnel) (Sheet 2 of 3)

Figure 12.2.10c    1:1000 Map Showing Built Heritage Identified Within Cheung Shan Tunnel Section (North Tunnel) (Sheet 3 of 3)

Figure 12.2.11a   1:1000 Map Showing Built Heritage Identified Within Sha Tau Kok Road Section (Sheet 1 of 3)

Figure 12.2.11b   1:1000 Map Showing Built Heritage Identified Within Sha Tau Kok Road Section (Sheet 2 of 3)

Figure 12.2.12      1:1000 Map Showing Built Heritage Identified Within Sha Tau Kok Road Section (Sheet 3 of 3)

Figure 12.2.13      1:1000 Map Showing Built Heritage Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 1 of 5)

Figure 12.2.14      1:1000 Map Showing Built Heritage Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 2 of 5)

Figure 12.2.15      1:1000 Map Showing Built Heritage Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 3 of 5)

Figure 12.2.16      1:1000 Map Showing Built Heritage Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 4 of 5)

Figure 12.2.17      1:1000 Map Showing Built Heritage Identified Within Lau Shui Heung Tunnel Section (South Tunnel) (Sheet 5 of 5)

Figure 12.2.18      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 1 of 6)

Figure 12.2.19      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 2 of 6)

Figure 12.2.20      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 3 of 6)

Figure 12.2.21      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 4 of 6)

Figure 12.2.22      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 5 of 6)

Figure 12.2.23      1:1000 Map Showing Built Heritage Identified Within Fanling Section (Sheet 6 of 6)

Figure 12.3           Key Plan for Geology Map of CHIA Study Area

Figure 12.4.1        Known Site of Archaeological Interest – Ping Che Archaeological Site

Figure 12.4.2        Known Site of Archaeological Interest – Queen’s Hill Archaeological Site

Figure 12.5           Key Plan for Archaeological Survey

Figure 12.5.1        Location Plan of Test Pit and Auger Hole within BCP Section

Figure 12.5.2        Location Plan of Test Pit and Auger Hole within Section Between Lin Ma Hang and Frontier Closed Area Boundary