Kai Tak Development – Infrastructure
at Former Runway and Remaining Areas of North Apron and Improvement of Adjacent
Waterways – D&C
Environmental Monitoring & Audit
Manual for KTD – Roads D3A & D4A
TABLE OF
CONTENTs
1.1 Project
Background
1.2 Project
Scope and Programme
1.3 Purpose
of this Manual
1.4 Project
Organization
2.1 Introduction
2.2 Operation
Phase
2.3 Mitigation
Measures
3.1 Introduction
3.2 Construction
Phase
3.3 Operation
Phase
3.4 Mitigation
Measures
4.1 Introduction
4.2 Site
Audits
5 WASTE
MANAGEMENT IMPLICATIONS
5.1 Introduction
5.2 Construction
Phase
5.3 Mitigation
Measures
6.1 Introduction
6.2 Methodology
and Criteria
6.3 Baseline
Monitoring
6.4 Event
and Action Plan
6.5 Mitigation
Measures
7.1 Site
Inspections
7.2 Compliance
with Legal and Contractual Requirements
7.3 Environmental
Complaints
8.1 General
8.2 Electronic
Reporting of EM&A Information
8.3 Monthly
EM&A Reports
8.4 First
Monthly EM&A Report
8.5 Subsequent
EM&A Reports
8.6 Quarterly
EM&A Summary Reports
8.7 Final
EM&A Review Reports
8.8 Data
Keeping
LIST OF FIGURES
Figure 1.1 Locations
of Roads D3A and D4A
Figure 1.2 Project
Organisation
Figure 7.1 Flow
Chart of the Complaint Response Procedures
LIST OF
APPENDICES
Appendix A Implementation Schedule of the Proposed Mitigation Measures