15.1.1 The Project covers the following designated project (DP) elements as specified in Items A.1, A.7, A.8, A.9 and C.2(c) in Schedule 2 Part 1 of the EIAO (Cap.499):
· DP1 – A road which is an expressway, trunk road, primary distributor road or district distributor road including new roads, and major extensions or improvements to existing roads under A.1 in Schedule 2 Part 1;
· DP2 – A road tunnel more than 800m in length between portals under A.7 in Schedule 2 Part 1;
· DP3 – A road bridge more than 100m in length between abutments under A.8 in Schedule 2 Part 1;
· DP4 – A road fully enclosed by decking above and by structure on the sides for more than 100m under A.9 in Schedule 2 Part 1; and
· DP5 – Reclamation works (including associated dredging works) more than 1 ha in size and a boundary of which is less than 100m from an existing residential area under C.2(c) in Schedule 2 Part 1.
15.1.2 This EIA Report has provided an assessment of the potential environmental impacts associated with the construction and operation of the Project based on the preliminary engineering design information available at this stage, and taken into consideration of the potential cumulative impacts from other concurrent projects. The assessment has been conducted, in accordance with the Study Brief No. ESB-195/2008 under the EIAO for the Project, covering the following environmental issues:
· Air Quality Impact
· Noise Impact
· Water Quality Impact
· Waste Management
· Ecological Impact
· Fisheries Impact
· Impact on Cultural Heritage
· Landscape and Visual Impact
· Landfill Gas Hazard
· Hazard to Life
15.1.3 The findings of this EIA Study have determined the likely nature and extent of environmental impacts predicted to arise from the construction and operation of the Project. During the EIA process, specific environmental control and mitigation measures have been identified and incorporated into the planning and design of the Project in order to achieve compliance with environmental legislation and standards during both the construction and operation phases. An environmental monitoring and audit (EM&A) programme has also been developed. The Implementation Schedules listing the recommended mitigation measures are presented in the Section 14. A summary of the environmental impacts are presented in the sections below.
Air
Quality Impact
Construction
Phase
15.1.4 Air quality impacts from the construction works for the Project would mainly be related to construction dust from excavation, materials handling, filling activities and wind erosion. With the implementation of mitigation measures specified in the Air Pollution Control (Construction Dust) Regulation together with the recommended dust suppression measures, good site practices and EM&A programme, dust impact on air sensitive receivers would be minimal.
Operation
Phase
15.1.5 For the operation phase, cumulative air quality impacts arising from vehicular emissions from open road network, portal emissions from the TKO-LT Tunnel, EHC, T2 Tunnel, proposed full enclosures, landscape decks at Lam Tin Interchange and Road P2, emissions from the ventilation exhaust buildings of TKO-LT Tunnel, EHC and T2, the background concentration within and adjacent to the Project site and the implementation of roadside noise barriers/semi-enclosures/landscape decks are assessed. Results show that the predicted maximum 1-hour and daily average NO2, annual average NO2 and maximum daily average and annual average RSP concentrations at the representative ASRs and within the Study Area would comply with the AQO. No mitigation measures are required.
15.1.6 The air pollutant concentrations in the TKO-LT Tunnel, proposed full enclosures and under the landscape decks at Lam Tin Interchange and Road P2 would comply with the EPD Tunnel Air Quality Guidelines. No mitigation measures are required.
Noise
Impact
Construction
Phase
15.1.7 This assessment examined the construction noise impacts of the Project, taking into account other concurrent projects. The predicted unmitigated noise levels would range from 54 to 88 dB(A) at the representative NSRs. With the use of quiet PME, movable barriers and temporary barriers, the noise level at the NSRs selected for construction noise impact assessment (except Kei Faat Primary School) would not exceed the construction noise standard. The affected Kei Faat Primary School has been noise insulated with air conditioners. It is recommended that the particularly noisy construction activities should be scheduled to avoid examination periods of these NSRs as far as practicable.
15.1.8 During the actual construction period, as much as practically possible should be done to reduce the construction noise, and on-going liaison with all concerned parties and site monitoring should also be conducted during the course of the construction period.
15.1.9 Ground-borne construction noise impacts pertinent to the use of breaker, drill rig and pile rig were also found to comply with relevant criteria. No adverse ground-borne construction noise impacts were predicted.
15.1.10 A construction noise EM&A programme is recommended to check the compliance of the noise criteria during normal daytime working hours.
Operational Phase
15.1.11 The potential road traffic noise impacts have been assessed based on the worst case traffic flows in 2036. Without any noise mitigation measures in place, the predicted noise levels at the NSRs would range from 31 to 79 dB(A). Practicable traffic noise mitigation measures are therefore formulated for the NSRs with predicted noise levels exceeding the EIAO-TM traffic noise criteria.
15.1.12 With the proposed noise barriers, semi-enclosures, full-enclosures and low noise surfacing applied on roads in place, the predicted overall noise levels at some of the NSRs would still exceed the noise limit. For these NSRs, the predicted traffic noise level due to the road sections within the Project does not exceed (i.e. new road) the criteria by 1 dB(A) or more. The ‘New’ road noise contribution to the overall traffic noise level would be less than 1.0 dB(A) and the ‘New’ road noise levels at these NSRs would all be below criterion. Furthermore, although the predicted overall traffic noise level does exceed the criteria by 1 dB(A) or more, the predicted overall noise level is not greater than that of the without Project Scenario at the design year. It should be noted that such noise exceedances at the representative NSRs are due to the existing roads. Nevertheless, there will be an overall reduction of noise brought about by the project, which may be considered an environmental benefit.
15.1.13 Operation noise impacts from fixed plant noise sources including ventilation buildings and pumping stations can be effectively mitigated by implementing noise control treatment at source during the design stage and adverse residual operation noise impacts are not anticipated.
Water Quality Impact
Construction Phase
15.1.14 The water quality impacts during the marine construction works have been quantitatively assessed by numerical modelling. It is predicted that, with the implementation of the recommended mitigation measures, there would be no unacceptable water quality impacts due to the construction of the Project and due to the cumulative effects from other concurrent marine construction activities. A water quality monitoring and audit programme will be implemented to ensure the effectiveness of the proposed water quality mitigation measures.
15.1.15
The
key issue from the land-based construction activities
would be the potential water quality impact due to the release of
sediment-laden water from surface works areas and discharge of construction site
effluent. Minimisation of water quality deterioration could be achieved through
implementing adequate mitigation measures.
Regular site inspections should be undertaken routinely to
inspect the construction activities and works areas in order to ensure the
recommended mitigation measures are properly implemented.
Operational Phase
15.1.16 During operational phase, no significant change in hydrodynamic regime is predicted according to the modelling results. No significant change in water quality regime, which associated with the hydrodynamic impact, is anticipated. Therefore no adverse hydrodynamic and water quality impacts are expected.
Ecological
Impact
15.1.17 There is no recognized terrestrial/marine site of conservation interest (e.g. as Country Parks, Sites of Special Scientific Interest, Coastal Protection Areas, Conservation Areas, Marine Parks) within the assessment area. The ecological resources identified included mixed woodland, disturbed woodland, grassland/shrubland mosaic, village/orchard, plantation, pond/stream, natural rocky shore, sandy shore, artificial seawall, hard substrata subtidal habitat, soft substrate subtidal habitat and pelagic subtidal habitat. Of which, hard substrata subtidal habitat has moderate and low-to-moderate ecological value. Fifteen hard coral, two black coral and 17 octocoral species were recorded within and in vicinity of marine works area. The remaining habitats were of low to low-to-moderate value.
15.1.18 Potential direct impacts on significant ecological resources of conservation importance (e.g. natural coastline along Chiu Keng Wan, natural coral communities with moderate to high ecological value on western coast of Junk Bay, coral recipient sites for translocation under other development projects, natural streams, and potential habitats of Philippine Neon Goby and Grassy Puffer Fish) have been avoided or minimized in the alignment option selection process.
15.1.19 The land-based construction works would cause a loss of approximately 3.8 ha of vegetated habitats (grassland/shrubland mosaic and plantation) with low and low to moderate ecological value. The associated flora and fauna recorded from these affected habitats are predominantly common and widespread species in Hong Kong. Terrestrial ecological impacts arising from the Project are considered low.
15.1.20 Reclamation works and bridge piers would result in the loss of 3.6 ha of subtidal habitat. Additionally, 19 ha of this same habitat would be lost temporarily due to marine construction works during construction phase. Existing artificial seawall of 540 m at TKO would be lost to reclamation works, however the reclaimed area would provide a surplus of 310 m of the same habitat. Direct impact on sparse coverage (<1%) of coral community would be minimized through coral translocation measures as far as possible.
15.1.21
Potential indirect impact due to change in water quality resulting from
the proposed marine works and reclamation would be temporary and
localized. Possible mitigation measures
for water quality impact, such as the deployment of
silt curtains around the active stone column installation points, opening of
newly installed seawall and marine works area would serve to protect nearby
marine ecological resources. With the
proper implementation of appropriate mitigation measures, the potential impact
on marine ecology due to water quality deterioration would be acceptable.
Fisheries
Impact
15.1.22
A review on existing information on commercial fisheries resources and
fishing operations within the surrounding waters has been undertaken. No important spawning or nursery grounds were identified
within or in the vicinity of the proposed marine works area, while the nearest Fish Culture Zone (FCZ) (Tung Lung Chau FCZ) is
located approximately 5 km from the proposed marine works area.
15.1.23
The importance of captured fisheries resources in the area of the
proposed reclamation and bridge piers within Junk Bay WCZ is identified as low
in terms of both production weight and value.
Fish fry production is not expected to be affected within Junk Bay and
Victoria Harbour due to the proposed works.
15.1.24 The Project would cause about 3.6
ha permanent loss and 19 ha temporary loss of fishing area in inner Junk Bay due
to the proposed reclamation and bridge construction. Considering the generally low importance of
the fishing area in inner Junk Bay as compared to the Hong Kong fishery and the
low production at this area, the direct impact of the Project on fisheries
resources and operations would be regarded as low.
15.1.25
No significant indirect impacts due to deterioration
of water quality are expected. However, mitigation
measures for water quality impact, such as the deployment of silt curtains
around the active stone column installation points, opening of newly installed
seawall and marine works area would still be implemented to protect fisheries
resources. No operational phase impacts
are expected.
Waste
Management Implications
15.1.26
Different types of waste
generated from the Project during the construction
phase are likely to include Construction and
Demolition (C&D) materials from demolition, excavation and site formation
works, excavated sediment, general refuse from workforce, and chemical waste
from the maintenance of equipment. During the operation phase, the major types of waste would be general
refuse from staff and office activities and chemical waste from maintenance
activities.
15.1.27
Approximately 4,170,420 m3 of inert
materials and 83,000 m3 of non-inert materials would be generated
during the construction phase of the Project.
814,600 m3 of inert material would be reused in the
reclamation while the remaining would be recycled or disposed off-site. Non-inert waste will be recycled as far as
possible before disposed to landfill. Opportunities in minimisation of
generation and maximisation of reuse would be continually investigated during
the detailed design and construction phases.
The other materials would be disposed to designated outlets. Provided that these wastes are handled,
transported and disposed of using approved methods and that the recommended
good site practices are strictly followed, adverse environmental impacts would
not be anticipated.
15.1.28 The total volume of excavated sediment generated from the Project is estimated to be approximately 19,360 m3. The sediment will be reused as filling material. Approximately 17,450 m3 of sediment is considered below the RBRGs. It is anticipated that the reuse of these sediments will not lead to land contamination. 1,910m3 of sediment exceeds the RBRG for lead. However, cement stabilization will immobilize metal contaminants and is capable to treat the exceedance on lead.
15.1.29
All sediment can be reused as filling material on-site after cement
stabilization. However, stabilized materials from 1,910m3 of
sediment with RBRG exceedance on lead have to comply with UTS and UCS. Final disposal/treatment on the 1,910m3
sediment has to be agreed with DEP.
15.1.30
Alternatively, excavated sediment can be treated with marine disposal. Based
on the results of the chemical and biological screening, approximately 9,600 m3 of sediment is suitable
for Type 1 – Open Sea Disposal, 60m3 of sediment is suitable for
Type 1 – Open Sea Disposal (Dedicated Sites), 7,790 m3 of sediment requires
Type 2 – Confined Marine Disposal and 1,910 m3 of sediment requires
Type 3 – Special Treatment/Disposal in accordance with ETWB TC(W) No.
34/2002 - Management of Dredged/Excavated Sediment.
15.1.31
The final determination of the
appropriate disposal options, routing and the allocation of a permit to dispose
of material at a designated site shall be determined in accordance with ETWB
TC(W) No. 34/2002. Three types of
disposal options for excavated sediments were stipulated in the ETWB TC(W) No.
34/2002: Type 1 – Open Sea Disposal or Open Sea Disposal in Dedicated Sites,
Type 2 – Confined Marine Disposal and Type 3 – Special Treatment /
Disposal. For Type 3 disposal, the Project Proponent shall be responsible for identifying and agreeing with the DEP the
most appropriate treatment and/or disposal arrangement. The determination of the appropriate disposal
options shall be based on the sediment classification and if necessary, the
biological screening results.
15.1.32
Mitigation
measures are recommended in this EIA to minimise potential environmental
impacts associated with handling and disposal of different wastes arising from
the Project. Provided that the
recommended mitigation measures are properly followed, adverse environmental
impacts would not be expected from the Project.
.
Impact
on Cultural Heritage
15.1.33 As no terrestrial and marine archaeological potential was identified, it is thus considered no impact on archaeology and therefore no mitigation measure required. However, indirect impact on one of the built heritage resources, Cha Kwo Ling Tin Hau Temple, located within the Study Area was anticipated. Mitigation measures have been suggested to protect the concerned temple during the construction phase. As long as the recommended mitigation measures are followed, adverse impact on the temple should be largely reduced and no residual cultural heritage impact is expected.
Landscape
and Visual Impact
15.1.34 On the TKO side, the principle landscape impact will be on the sea waterbody of Junk Bay, existing trees and vegetation. Whilst the physical impact of the TKO Interchange reclamation and bridge/slip road piers is relatively small in relation to the bay as a whole, the actual area of impact has been assessed as the footprint of the interchange as it changes the landscape character from open water to enclosed sea space. The main areas of impacts on trees will be on the existing TKO reclamation along Road D4and at the TKO tunnel portal area. The loss of trees can be minimised through tree protection measures and mitigated through new compensatory planting.
15.1.35 The primary visual impacts of the project at TKO will be the addition of the TKO Interchange in Junk Bay, the tunnel portal on the western hill slopes and the road improvement works with footbridges on the TKO reclamation. Visual mitigation of the interchange can mainly be achieved through minimisation of the apparent size and scale of development through sensitive design of the visible elements. Visual mitigation of the road works will be achieved by reinstatement of streetscape and planting. The tunnel portal slopes will be partially greened with shrubs and climbers planted in toe planters on the slope berms. The primary VSRs will be the surrounding existing and planned residential blocks on the TKO reclamation which will experience elevated views of the interchange, and the users of the planned waterfront and open space facilities. It is considered that the residual visual impacts will be Moderate after mitigation in the operational phase.
15.1.36 For TKO, the Moderate adverse residual landscape and visual impacts at Year 10 are considered acceptable given the context of an area which is planned for large-scale development and the fact that the TKO-LT Tunnel will be integrated with the TKO Town Centre South Extensions. Impacts on the Junk Bay Landscape Resource and Character Area are unavoidable but the scale is considered acceptable in relation to the scale of the Bay.
15.1.37 On the Lam Tin side of the Project, many existing trees will be impacted at the ex-Cha Kwo Ling Kaolin Mine Site and on the EHC approach roads. However, it is anticipated that the loss of the trees can be minimised though tree protection measures and mitigated with new planting around the TKO-LT Tunnel works.
15.1.38 The primary visual impacts at Lam Tin come from the construction of the Lam Tin Interchange with its elevated slip roads and associated tunnel portal and service buildings within the ex-Cha Kwo Ling Kaolin Mine Site. The existing quarry walls provide a high degree of visual containment and extensive mitigation planting will in time offset the loss of existing trees and the visual impact on surrounding elevated VSRs will be reduced. The principal VSRs are the surrounding high rise residential blocks which define the ZVI to the west, north and east which will experience Substantial visual impacts during construction. It is considered that the residual impacts to these VSRs and those in the planned residential development at Cha Kwo Ling to the west and the CDA development in Yau Tong Bay to the east will be reduced from Moderate with the implementation of mitigation measures.
15.1.39 For Lam Tin, the Moderate adverse residual landscape and visual impacts are also considered acceptable given the planning intent for the area which includes major redevelopment of the waterfront and the abandoned ex-Cha Kwo Ling Kaolin Mine Site. The number of VSRs affected is relatively low due to the visual containment of the site. In addition, the existing visual quality of the proposed site for the interchange is relatively low and the proposed development can be integrated into the overall development of the area with impacts reduced to acceptable levels provided the recommended mitigation measures are implemented.
15.1.40 In accordance with the criteria and guidelines for evaluating and assessing impacts as stated in Annex 10 and 18 of the TM- EIAO, it is considered that overall the residual landscape and visual impacts of the proposed TKO-LT Tunnel are acceptable with mitigation during the construction and operation phases.
Landfill Gas Hazard Assessment
15.1.41 The results of the qualitative risk assessment of landfill gas hazard to the Project posed by Sai Tso Wan Landfill suggested that the overall level of the landfill gas hazard would be “medium”.
15.1.42 Some appropriate precautionary measures have been proposed to minimise the landfill gas hazard at the Project sites during the construction phase and operational phase. In particular, it is noted that landfill gas membrane should be installed at the tunnels, underground structures, and basement & ground floor of the buildings within the Consultation Zone of the Sai Tso Wan Landfill. Routine monitoring is recommended as a precautionary measure..
15.1.43 Provided that the recommended precautionary measures are implemented properly, the health and safety of the site workers/personnel working at the Project sites would be safeguarded and there would be no adverse impact on the feasibility of the Project.
Hazard
to Life
15.1.44 As there is no overnight storage of explosives on site, no hazard assessment of the storage and transport of explosives is deemed necessary.
15.2
Summary
of the Measures taken for the Minimization of Environmental Impacts
15.2.1 The various chapters and appendices of this EIA report have presented the measures to minimize pollution in the planning, design, construction and operation stages. The key measures to minimize pollution are summarized below for easy reference and they are not exhaustive. For details, please refer to the relevant chapters and appendices as appropriate.
15.2.2 The following measures are considered during project investigation and preliminary design stage.
Alignment
Option
15.2.3 For the main tunnel alignment, the alignment option “straight tunnel option without toll plaza” is adopted as the Recommended Scheme. Under this Scheme, the tunnel is in a straight alignment in TKO section. The main road’s length is reduced by about 600m as compared with the conforming S-curve tunnel under Further Development of Tseung Kwan O – Feasibility Study.
15.2.4 Toll plaza is not required in the Recommended Scheme. Thus, minimizing the extent of reclamation and construction works when compared with other options.
15.2.5 Depressed road with Landscape deck is proposed at Road P2 to minimize the visual and noise impact to the nearby residential area.
15.2.6 At Lam Tin Interchange (LTI), a noise shelter covering the main line is introduced. The noise shelter comprises of a landscape deck and translucent noise cover. This noise shelter serves to minimize the noise and visual impact from the main road.
15.2.7 To further abate the visual impact, part of the 3 slip roads at the northeast area of LTI will be in tunnel form instead of at-grade roads.
15.2.8 At Lam Tin Interchange and Cha Kwo Ling Section, tunnel scheme is adopted instead of the depressed road. By adopting tunnel option, the environmental impact to the surroundings will be less than that in the depressed road option as the construction works will be carried out underground in the tunnel option. Furthermore, less natural hillside will be affected by the tunnel option than depressed road.
15.2.9 For Cha Kwo Ling Section, the alignment option H1b is adopted in which the tunnel will pass through the middle of Cha Kwo Ling Village (CKLV). Under this alignment, the tunnel will be away from Tin Hau Temple and previous Four Hills Public School when compared with Option H2a/H2b.
15.2.10 Also, the tunnel alignment under H1b is further away from Yau Lai Estate when compared with Option H2a/H2b.
Ventilation
Building
15.2.11 To minimize the visual impact to the surrounding residential area, green roof is applied at the ventilation building as far as practical.
Construction
Method
15.2.12 For the reclamation at TKO, non-dredged reclamation method is adopted in lieu of dredged method in order to minimize sediment generation.
15.2.13 At Cha Kwo Ling section, the construction method for the adopted option H1b are drill and blast and mechanical breaking method or other non-blasting methods. Compared with the cut and cover tunnel construction method adopted in other options, the drill and blast and mechanical breaking method or other non-blasting methods are relatively environmental friendly as there is no excavation works from the ground level thus minimizing the construction noise and dust generation.
15.2.14 Mitigation measures requirements specified for other environmental aspects are summarized below.
Measures
for Air Quality Impact
· Implementation of dust suppression measures stipulated in Air Pollution Control (Construction Dust) Regulation. The mitigation measures and good site practices as mentioned in Section 3.8 would be strictly followed. A comprehensive dust monitoring and audit programme are recommended to minimize cumulative dust impacts.
Measures
for Noise Impact
·
Good site practices to limit noise emissions at source
and use of quiet plant and working methods, whenever practicable.
·
Provision direct noise mitigation measures on project
roads such as noise barriers, semi-enclosures, full-enclosures and landscape deck.
·
Provision of noise control treatment at the
Ventilation Buildings and Pumping Stations during the design stage and
implementing the same during operation phase for fixed plant noise.
Measures
for Water Quality Impact
·
Mitigation measures have been recommended for land-based and
marine-based construction activities. Provided the recommended mitigation
measures as mentioned in Section 5.8 are implemented, and all construction
site / works area discharges comply with the TM-DSS standards, no unacceptable
residual water quality impact is anticipated
Measures
for Waste Management
·
Reduction measures have been recommended to minimise
the amount of materials generated in the Project.
·
Implementation of recommended mitigation measures, no
adverse environmental impacts would be expected.
Measures
for Ecological Impact
·
The mitigation
measures as mentioned in Section 6.8, in order of priority, avoidance, minimization,
and compensation approaches, have been
recommend to alleviate the potential ecological impacts on important habitats
and the associated wildlife caused by the proposed development.
Measures
for Fisheries Impact
·
By minimizing the extent of reclamation and the application of non-dredge method, the direct loss of fishing ground
in Junk Bay due to reclamation has been largely avoided.
·
Implementation of mitigation measures proposed in water quality impact
assessment include the installation
of single floating silt curtain at the opening of the newly installed seawall
during the reclamation of Road P2 and the proposed marine works, protects
fisheries resources from indirect impacts and ensure no unacceptable impact on
fisheries resources and operations.
Measures
for Cultural Heritage
·
For preventing dust and visual
impacts to the Cha Kwo Ling Tin Hau Temple and its fung shui rocks (Child-given
Rocks) during the construction phase, mitigation measure in the form of a
temporarily fenced off buffer zone (about 5 meters form the edge of Rocks and
about 15m form the edge of Rocks alter) with allowance for public access
(minimum 1m) should be provided around the temple and the fung shui rocks. The
open yard in front of the temple should be kept as usual for annual Tin Hau
festival. Such mitigation measures
should be consulted with Cha Kwo Ling Villagers during the detailed design
stage and before construction stage. In addition, monitoring of vibration
impacts should be conducted when the construction works are less than 100m from
the temple.
·
In case indirect vibration impact occurs during the construction phase,
vibration level is to be controlled within a peak particle velocity (ppv) limit
of 5mm/s measured inside the historical buildings to prevent potential damage
to built heritage. Monitoring of
vibration should be carried out during construction phase.
Measures
for Landscape and Visual Impact
·
A number of measures have been recommended for the
Project during the construction and operational phases to minimize impacts on
existing trees,freshwater streams and ponds, natural coastline and sea
waterbody areas. Mitigation measures have also been proposed to reduce visual impacts..
·
Compensatory tree planting, slope greening works,
sensitive design and greening of buildings and structures, streetscape and
highway elements of the Project, noise barriers and enclosures are recommended.
Measures
for Landfill Gas Hazard
·
A number of measures have been recommended for the Project to safeguard
the safety of all personnel and the general public (i.e. passengers of vehicles
using the TKO-LT Tunnel) present at the Project site. These include site safety measures,
installation of gas barrier, routine monitoring of landfill gas at excavation
area during construction phase, and buildings and enclosures (e.g.
administration building, ventilation building, workshop, tunnel etc) during
operation phase.
Measures
for Hazard to Life
·
Since
no overnight storage of explosive on site is required for the construction of
the Project and no hazard to
life impact, no mitigation measure is proposed.
15.3.1 The major environmentally sensitive areas within the study area include the existing urban districts in Lam Tin and Tseung Kwan O areas, the seawater intakes at the waterfront of the Junk Bay and coral communities. With the implementation of the proposed environmental control and mitigation measures, the environmentally sensitive receivers within the Study Area would be protected from adverse environmental impacts arising from the proposed Project. A summary of the key environmental outcomes arising from the EIA Study and environmental benefits of the environmental protection measures recommended are presented in Table 15.1 below.
Table 15.1 Summary of Key Environmental Outcomes / Benefits
Area/Issue |
Environmental
Outcomes / Benefits and Mitigation Measures |
The
Project |
The Project is to provide a highway
connecting TKO at Po Shun Road
in the east and Trunk Road T2 in
the west with the associated interchange. It comprises the following key
elements: (a)
a
dual two-lane highway approximately 4.8 km long. About 2.6 km of the highway is in the form of tunnel; (b)
slip
roads, depressed roads, viaducts, TKO Interchange, ventilation building,
tunnel portal facilities and around 3 ha reclamation
on TKO side; (c)
slip
roads, branch tunnels, viaducts, Lam Tin Interchange, tunnel portal
facilities, ventilation and administration buildings on Kowloon
side; and (d)
the
associated building, civil, structural, marine, electrical and mechanical,
traffic control and surveillance system (TCSS), landscaping, and
environmental protection and mitigation works. |
Environmentally
Friendly Design Considered and Recommended to Avoid Environmental Problems |
·
The
recommended preferred option would avoid the clearance of vegetation on the
disturbed woodland located between the Kwong Tin Estate and Lei Yue Mun Road
by relocating the tunnel portal to urbanized developed area with lower
ecological value. ·
The
option with minimal reclamation extent (approximately 3 ha) has been
selected. Potential environmental impacts such as water quality, marine
ecology, and waste associated with the reclamation would be avoided or
minimized. ·
The
selected alignment option would avoid the direct impact and disturbance to
the natural habitats (rocky shore and stream) along the coastline of Chiu
Keng Wan where fish of conservation interest (Philippine Neon Goby and Grass
Puffer Fish) were previously recorded.
With the natural coastline along Chiu Keng Wan preserved, there would
be no blockage to the passage between the stream habitat and coastal water
where potential migration of Philippine Neon Goby may occur. ·
Section
of Road P2 at the eastern side of Ocean Shores has been designed as depressed
road covering with landscape deck to minimize potential environmental impacts
on the nearby sensitive receivers. |
Population
and Environmentally Sensitive Areas Protected |
With the
adoption of environmentally friendly design mentioned above, major
environmentally sensitive receivers would be protected. |
Construction
Dust |
Environmental benefits of
environmental protection measures recommended: The unloading process of spoil materials at barging point would be undertaken within a 3-sided screen with
top tipping hall. Water spraying and flexible dust curtains would be provided
at the discharge point for dust suppression. Watering 8 times a day on active works areas,
exposed areas and paved haul roads. Dust suppression
measures stipulated in the Air Pollution Control (Construction Dust)
Regulation. Compensation areas included: N/A Population and environmentally
sensitive receivers protected: Existing ASRs within 500m of the project boundary, including residential
premises, schools, temple and institutional uses. |
Air
Quality (Operation Phase) |
Environmental benefits of
environmental protection measures recommended: N/A Compensation areas included: N/A Population and environmentally
sensitive receivers protected: Existing and planned ASRs within 500m of the project boundary, including residential
premises, schools, temple and institutional uses. |
Airborne
Noise |
Environmental benefits of
environmental protection measures recommended: NSRs are protected with
implementation of quiet PME, movable barriers and full enclosure as well as
good site practices during construction stage. The predicted mitigated noise
levels complied with the noise standards at all NSRs except Kei Faat Primary
School. However, this affected NSR is
school and has been noise insulated with air conditioners. By keeping the windows closed during
construction activities, noise impacts at the indoor environment of these
NSRs can be avoided. Notwithstanding
this, it is recommended that the particularly noisy construction activities
should be scheduled to avoid examination periods of these NSRs as far as
practicable. The following mitigation
measures would be recommended for operational traffic noise: Existing NSRs ·
VB4-1: about 6m of 4m High
Vertical Noise Barrier on Cha Kwo Ling Road; ·
VB4-2: about
40m of 4m High Vertical Noise Barrier on Cha Kwo Ling Road; ·
CT1: about 100m of 6m
High Cantilever Noise Barrier with 4.2m Cantilever (at 45 °) on Cha Kwo Ling
Road; ·
CT2: about 80m
of 6m High Cantilever Noise Barrier with 3.7m Cantilever (at 90) on road EHC2; ·
FE1: about 400m
Landscape deck provided on the entire extent of the Main line (Cha Kwo Ling
Side); ·
FE2: about 130m
of Full-enclosure provided on road S2; ·
FE3: about 120m
of Full-enclosure provided on road EHC4; ·
FE4: about 200m
of Landscape Deck provided on road P2 ·
SE1: about 260m of Semi-enclosure provided on road EHC2; ·
SE2: about 180m
of Semi-enclosure provided on road S2; ·
SE3: about 30m
of Semi-enclosure provided on road EHC4; ·
VB5-1: about 130m
of 5m High Vertical Noise Barrier provided at road EHC4; ·
VB5-2: about
50m of 5m High Vertical Noise Barrier provided at road EHC4; ·
VB5-3: about
80m of 5m High Vertical Noise Barrier provided at road EHC1; ·
VB5-4: about
70m of 5m High Vertical Noise Barrier provided at road EHC1; ·
VB5-5: about
170m of 5m High Vertical Noise Barrier provided at road S3; ·
VB5-6: about 180m
of 5m High Vertical Noise Barrier provided at road S1; ·
LNS1: about
190m of Low Noise Surfacing on North and South Bound P2 Road ; ·
LNS2: about 240m of Low Noise Surfacing on East and West Bound Po
Yap Road; and ·
LNS3: about
200m of Low Noise Surfacing on East and West Bound Po Yap Road. Planned NSRs ·
FE5: about 80m of Full-enclosure on road EHC4; and With the proposed noise mitigation measures in
place, the ‘New’ road noise contributions to the overall noise levels at all
representative NSRs would be less than 1.0 dB(A) and the ‘New’ road noise
levels would all be below the relevant noise criteria. Although the predicted overall noise levels
at some of the NSRs does exceed the criteria by 1 dB(A) or more, the
predicted overall noise level is not greater than that of the without Project
scenario at the design year. No adverse noise impacts arising from the ‘New’
roads would be predicted at any of the representative NSRs. Noise exceedances at the representative
NSRs, if any, would be due to the existing roads. Acoustic louvers and silencer were proposed for
ventilation buildings & pumping station, no residual operation noise
impact is anticipated. Compensation areas included: N/A Population and environmentally
sensitive receivers protected: Existing and planned NSRs
within 300m of the project boundary, including residential premises, schools,
temple and institutional uses. |
Water
quality |
Environmental benefits of
environmental protection measures recommended: Implementation
of the proposed mitigation measures including adopt non-dredged method by
constructing steel cellular caisson structure with stone column for
construction of seawall foundation, deployment of floating type silt curtain
around the active stone column installation points, formation of seawall
enclosing the reclamation for Road P2 (notwithstanding
an opening of about 50m for marine access) prior to the filling activities,
seawall opening of about 50m wide for marine access shall be selected at a
location as indicatively shown in Appendix
5.10, no more than 3 filling barge trips per day with a maximum daily
rate of 3,000m3 (i.e. 1,000 m3 per trip) for the
filling operation at the reclamation area for Road P2, and carry out all
filling works behind the seawall with the use of single silt curtain at the
marine access. Floating single silt
curtain shall be employed for construction
of piers for TKO Interchange and all other marine works. Compensation areas included: N/A Population and environmentally
sensitive receivers protected: Coral communities at Junk Bay near
Chiu Keng Wan, Junk Bay and Junk Island (refer to Appendix 5.5). |
Waste
management implication |
Environmental benefits of
environmental protection measures recommended: Implementation of the
proposed waste control and mitigation measures would avoid the potential
water quality, dust, odour, and noise impacts associated with handling,
transportation and disposal of the identified wastes arising from the
construction phase of the Project. It is estimated that
approximately 4,170,420 m3 of inert
C&D materials would be generated from the project, which are proposed to
be reused at reclamation, disposed at PFRFs or recycled into aggregates and
other rock products. About 83,000 m3 of non-inert C&D
materials would be generated and disposed of at landfill. Methods to
minimise the volume of sediment generated have been explored and implemented.
The total volume of excavated sediment generated from the Project is
estimated to be approximately 19,360 m3. All sediment will be reused on site after cement stabilization. Based on the
results of the chemical screening result, approximately
17,450 m3 of sediment
is considered below the RBRGs of heavy metals, TBT, PCBs and PAHs. It is
anticipated that the reuse of these sediments will not lead to land
contamination. Some 1,910m3
of sediment exceeded the RBRG for lead and will be suitable to reuse after cement
stabilization. Further agreement on final treatment on this 1,910m3 of sediment has to be sought from DEP. With the implementation
of the recommended mitigation measures, no adverse environment impacts would
be expected. Compensation areas included: N/A Population and environmentally
sensitive receivers protected: Water quality, air, and
noise sensitive receivers in the vicinities of Project sites, the waste
transportation routes and the waste disposal site(s). |
Ecology |
Environmental benefits of
environmental protection measures recommended: Adjustment of the alignment option would avoid the
clearance of vegetation on the disturbed woodland and the blockage of the
streams where Philippine Neon Goby previously recorded, and minimize the loss
of marine habitat. Implementation of good
site practice would minimize the disturbance to the nearby terrestrial
habitats and associated wildlife. Coral translocation would
reduce the loss of coral. 15.3.2
The installation of silt curtain at the opening of the newly installed
seawall and around the proposed marine works area would control water quality
deterioration within acceptable level. Compensation areas included: Felling of mature trees would be compensated by
planting of standard or heavy standard trees.
Such compensatory planting for trees should be provided with at least
a 1:1 ratio. The loss of hard substrata subtidal and artificial
seawall intertidal habitat would be largely compensated through the provision
of new artificial seawall with surface for recolonization of intertidal fauna
and corals. The affected coral colonies except Oulastrea crispata within the reclamation
area and bridge footprint would be translocated to the other suitable
locations as far as practicable. Population and environmentally
sensitive receivers protected: Vegetation, wildlife and their associated
habitats at and in the vicinity of the project site. |
Fisheries impact |
Environmental benefits of
environmental protection measures recommended: 15.3.3
The installation of silt curtain at
the opening of the newly installed seawall and the proposed marine works
areas is recommended to protect fisheries resources. With implementation of the proposed
mitigation measures, the potential impact on fisheries due to water quality
deterioration would be controlled within an acceptable level. Compensation areas included: Not required (no significant adverse
fisheries impact is anticipated). Population and environmentally
sensitive receivers protected: Fisheries resources near
the project site |
Cultural Heritage |
Environmental benefits of
environmental protection measures recommended: There would
be indirect impact on Cha Kwo Ling Tin Hau Temple due to their close
proximity to the work site of the Project. With implementation of the proposed mitigation
measures, adverse impact on the temple should be largely reduced Compensation areas included: N/A Population and environmentally
sensitive receivers protected: Cha Kwo Ling Tin Hau Temple |
Landscape
and visual |
Environmental benefits of
environmental protection measures recommended: The project works will result in adverse impacts to
landscape resources and visually sensitive receivers. The proposed mitigation
measures on the TKO side will reduce and offset the physical impacts on
existing trees and vegetation, natural hillsides,natural coastline and sea
waterbody areas. They will also mitigate the visual impacts on surrounding
visually sensitive receivers in TKO. The creation of a landscaped deck over
the road P2 will enhance the outlook of the existing reclamation area and new
public waterfront access will be provided on the reclamation for the TKO
interchange slip road landings. On the Lam Tin side of the project mitigation
measures will reduce and offset the physical impacts on existing trees and
vegetation on the site of the ex-Cha Kwo Ling Kaolin Mine site. They will
also reduce the visual impact of the Lam Tin interchange on surrounding
visually sensitive receivers through sensitive design of the new structures
and extensive planting and greening. Compensation areas included: The landscaped deck over the depressed Road P2 will
provide additional public open space. Public waterfront access will also be
provided on the reclamation for the TKO Interchange. Streetscapes will be
reinstated along Road P2 where it integrates with the TKO road system. The
Lam Tin Interchange will be extensively planted to create a compensatory green
outlook for surrounding residents. Population and environmentally
sensitive receivers protected: The existing residents in TKO from elevated and
at-grade viewpoints, the planned visually sensitive receivers on the TKO
reclamation and surrounding area and recreational users of the surrounding
country parks and Junk Bay will benefit from the landscape and visual
mitigation measures. On the Lam Tin side, existing and planned visually
sensitive receivers from at grade and elevated viewpoints will benefit from
the mitigation measures. These will primarily be those residents of Lam Tin,
however residents on the north shore of Hong Kong Island and seaborne
travelers within Victoria harbour will also benefit. |
Landfill
Gas Hazard |
Environmental benefits of environmental
protection measures recommended: A qualitative assessment
of the potential hazards associated with landfill gas migration from Sai Tso
Wan Landfill to the tunnels, roads and associated facilities during the
construction and operation phases has been undertaken. The potential landfill gas hazards
associated with the Project are evaluated using the source-pathway-target
model in accordance with the EPD’s Guidance Note on Landfill Gas Hazard
Assessment. Sai Tso Wan Landfill has
been restored under the
Urban Landfills Restoration Contract commenced in April 1997 and were
completed in May 1998. The restoration works at Sai Tso Wan Landfill has
created a recreation ground which was opened for public use in April 2004. Sai Tso Wan Landfill is
considered as a “medium” source of gas migration. The source-pathway-target analysis shows
that overall landfill gas risk posed by Sai Tso Wan Landfill to the Project
will be “medium” for both
construction phase and operational phases. Landfill gas protection
measures and monitoring requirements have been recommended for the construction and operation of the
Project. It is expected that with the
proposed protection measures in place, the potential risk of landfill gas
migration to the Project will be minimal. Compensation areas included: N/A Population and environmentally
sensitive receivers protected: Construction workers,
operational staffs, maintenance workers, vehicles from general public |
Hazard to life |
Environmental benefits of
environmental protection measures recommended: As there is no overnight
storage of explosives on site, hazard assessment of the storage and transport
of explosives is not required as per Section 3.4.10 of the EIA Study Brief
No. ESB-195/2008. Compensation areas included: N/A Population and environmentally
sensitive receivers protected: N/A |
15.4.1 The findings of this EIA have provided information on the nature and extent of environmental impacts arising from the construction and operation of the Project. The EIA has, where appropriate, identified mitigation measures to ensure compliance with environmental legislation and standards.
15.4.2 Overall, the EIA Report has predicted that the Project would be environmentally acceptable with the implementation of the proposed mitigation measures for construction and operation phases. An environmental monitoring and audit programme has been recommended to ensure the effectiveness of recommended mitigation measures.