Construction
of Tsing Tsuen Tunnel for KCRC West Rail
The project involved the construction of two 1.7 km-long tunnels using Tunnel Boring Machine (TBM) for the West Rail from Tsuen Wan to Lai King, and the demolition of two industrial buildings within the construction site.
Environmental Concern
The
tunnel construction work was commenced from a site, which was only about
20 m away from a large residential development, the Waterside Plaza. The
major concern was the dust generation from building demolition works and
the transportation of substantial amount of excavated soils during the
tunnel construction.
The
project employed many construction equipment including some huge ones
such as a 100 m long Tunnel Boring Machine for round-the-clock operation.
Noise from the construction work, in particular during night-time, was
also a major concern.
Moreover,
as the early stage of the construction works involved diaphragm walls
construction and bulk excavation, large amount of muddy ground water and
wastewater would be generated. Discharge of this polluted water if not
treated would cause blockage of the downstream drainage system. |