Measures
Adopted
Hoarding
- Hoarding was provided at the site boundary adjacent to the residential
development.
Treatment
- The bodies and wheels of vehicles leaving the construction site were
thoroughly washed by water spraying to remove dusty materials prior to
exit. Water basins were constructed at the construction site exits to
facilitate washing of vehicles.
Watering
- Continuous water spraying was provided during the breaking of slope.
Main haul road in the construction site was wetted by water trucks. Water
tanks and pumps were provided at remote locations to ensure adequate supply
of water for dust suppression. |