space
   
 
space space   space
space

Review of West Kowloon and Tsuen Wan Sewerage Master Plans - Feasibility Study

 

Final Report - Volume 1

Appendices

Appendix B

Water Quality Testing Results at Tsuen Wan and West Kowloon 
Pollution Loading Survey at Box Culvert
Water quality objectives for Victoria Harbour (Phase I and II) and Western Buffer Water Control Zone


Appendix C

Uncharted Manholes in Study Area

Hydraulic Performance for Future Design Scenarios
A3 Drawings -
2006, 2011, 2016, 2021, 2030, Ultimate Development
A0 Drawings - 2006, 2011, 2016, 2021, 2030, Ultimate Development
Sewer Upgrade in Tsuen Wan, Sewer Upgrade in West Kowloon


Appendix D

Options Evaluation


Appendix E

Summary of Risk Management Workshop
Report on Value Management Workshop
Minute from Tsuen Wan Rural Committee Meeting on 17 September 2009


Appendix F

Enlarged Views of Proposed Sewer Alignment in Unsewered Areas


Appendix G

Cost Estimate

 

Final Report - Volume 2

Figures

1.1

2.1-2.8

3.1, 3.2, 3.3, 3.4, 3.5, 3.63.7

4.14.2, 4.34.44.5, 4.64.7, 4.8, 4.94.10, 4.11, 4.12, 4.13, 4.144.154.16, 4.174.18-4.20

6.1-6.4

7.1-7.107.11-7.22, 7.23-7.25, 7.26-7.31, 7.32-7.37, 7.38-7.41 & 7.42-7.45

8.1-8.11, 8.12-8.21, 8.22, 8.23-8.418.42-8.43

9.1-9.5, 9.6-9.11, 9.12-9.16 & 9.17-9.20

11.1

 

Executive Summary

 
 
 
Back to topTable of Content

 

 
2005 copyright logo| Important notices

Last Revision Date : 21 February 2011