Monthly Update of Documents Uploaded

 

       Documents Uploaded to the EIAO Website

   (for the period between 16 June 2021 to 15 July 2021)

 

 

Application No. / Permit No.

Project Title

Document Name

Hyperlink

 

 

Application for EIA Study Brief

 

 

ESB-340/2021

San Tin / Lok Ma Chau Development Node

EIA Study Brief

https://www.epd.gov.hk/eia/register/study/latest/esb-340.pdf

 

 

ESB-341/2021

Remaining Phase Development of the New Territories North (NTN) - NTN New Town and Man Kam To

EIA Study Brief

https://www.epd.gov.hk/eia/register/study/latest/esb-341.pdf

 

 

ESB-343/2021

Widening of Tsuen Wan Road and the associated junction improvement works

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/esb343/esb343.pdf

 

 

ESB-344/2021

Proposed Residential Development at Lot No. 2 in D.D. 228 near Pak Fa Lam Road, Sai Kung

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/esb344/esb344.pdf

 

 

ESB-345/2021

Hudson Environmental Waste Disposal Center (Waste Mineral Oil)

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/esb345/esb345.pdf

 

 

ESB-346/2021

Northern Link

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/esb346/esb346.pdf

 

 

Application for Permission to Apply Directly for Environmental Permit

 

 

DIR-284/2021

Installation of the Proposed 132kV Cable Circuits Connecting with Ho To West Substation and Existing 132kV Fanling to Mai Po Cable Circuits

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/dir284/dir284.pdf

 

 

DIR-285/2021

Asia Direct Cable System - Hong Kong Segment (ADC-HK) - Chung Hom Kok

Project Profile

https://www.epd.gov.hk/eia/register/profile/latest/dir285/dir285.pdf

 

 

Application for Approval of EIA Report

 

 

EIA-270/2021

Sai O Trunk Sewer Sewage Pumping Station

EIA Reports Approved

https://www.epd.gov.hk/eia/register/report/conditions/aeiar2702021.pdf

 

 

Application for Environmental Permit

 

 

Nil

 

 

Application for Variation of an Environmental Permit

 

 

VEP-594/2021

Central Kowloon Route

Environmental Permit issued (EP-457/2013/D)

https://www.epd.gov.hk/eia/register/permit/latest/vep5942021.htm

 

 

 

Application for Further Environmental Permit

 

 

FEP-205/2021

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Environmental Permit issued (FEP-02/352/2009/D)

https://www.epd.gov.hk/eia/register/permit/latest/fep2052021.htm

 

 

Submission as required by Environmental Permit Condition - Design / Environmental Submissions

 

 

EP-572/2020

South East Asia - Japan 2 Cable System - Hong Kong Segment (SJC2-HK) - Chung Hom Kok

Post-Project Coral Survey Report

https://www.epd.gov.hk/eia/english/register/aep/ep5722020_content.html

 

 

 

 

EP-555/2018/A

New Wang Tong River Bridge

Construction Works Schedule and Location Plan

https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html

 

 

 

 

EP-555/2018/A

New Wang Tong River Bridge

Baseline Monitoring Report

https://www.epd.gov.hk/eia/english/register/index8/vep5852020_content.html

 

 

 

 

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Ecological Enhancement PlanRev C

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

 

 

EP-210/2005/D

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Third Annual Air Quality Impact Assessment Review

https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Mangrove Seedling Planting Proposal (Rev.2)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Landscape Plan (Rev.5)  

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

Construction Works Schedule and Location Plans

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Landscape Plan (Rev.4) Booklet 1 of 2

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Landscape Plan (Rev.4) Booklet 2 of 2

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Ecological Monitoring Report for the Woodland Compensation Area (Mar 2021to May 2021)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

EP-556/2018

Provision of Trunk Sewer to 3 Villages in Tai Po: Ta Tit Yan, Yuen Tun Ha and Lo Lau Uk in Tai Po

Water Quality and Ecological Monitoring Plan

https://www.epd.gov.hk/eia/english/register/aep/ep5562018_content.html

 

 

 

 

 

EP-556/2018

Provision of Trunk Sewer to 3 Villages in Tai Po: Ta Tit Yan, Yuen Tun Ha and Lo Lau Uk in Tai Po

Waste Management Plan

https://www.epd.gov.hk/eia/english/register/aep/ep5562018_content.html

 

 

 

 

 

 

EP-516/2016

Port Shelter Sewerage, Stage3 - Sewerage Works at Po Toi O

Detailed Landscape Plan

https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monitoring Report for Wetland Compensation Area (NO.8) (May 2021)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monitoring Report for Wetland Compensation Area (NO.7) (Apr 2021) 

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

 

Submission as required by Environmental Permit Condition - EM&A Report

 

 

 

Island District

Central & Western District

 

 

 

 

North District

Wan Chai District

 

 

 

 

Sai Kung District

Eastern District

 

 

 

 

Sha Tin District

Southern District

 

 

 

 

Tai Po District

Kowloon City District

 

 

 

 

Tsuen Wan District

Kwun Tong District

 

 

 

 

Tuen Mun District

Sham Shui Po District

 

 

 

 

Yuen Long District

Wong Tai Sin District

 

 

 

 

Kwai Tsing District

Yau Tsim Mong District

 

 

 

- Island District

 

 

EP-083/2000

Conversion of Two Existing Gas Turbines (GT5 & GT7) into a Combined Cycle Unit

Monthly Environmental Monitoring And Audit Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep0832000_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.65

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.64

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.63

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Quarterly EM&A Report No.21 (Jan 2021 to Mar 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

EP-532/2017/A

Mui Wo Lai Chi Yuen Cemetery Extension

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5582019_content.html

 

 

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

FEP-03/558/2018/A

 Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Environmental Monitoring and Audit Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

EP-071/2000/D

1,800 MW Gas-Fired Power Station at Lamma Extension

Monthly Environmental Monitoring and Audit Report Unit L11& L12 (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5802020_content.html  

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(May 2021)(HY/2019/01)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

 

EP-353/2009/K

Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities

Monthly EM&A Report(May 2021) (HY/2011/03)

http://www.epd.gov.hk/eia/english/register/index8/vep4982016_content.html

 

 

 

 

 

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.35(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

EP-01/097/2001/C

Water Recreation Centre at Penny's Bay (part & remaining part)

Monthly Environmental Monitoring and Audit Report (No. 190)

http://www.epd.gov.hk/eia/english/register/index8/vep1992005_content.html

 

 

EP-352/2009/D

Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road

Monthly EM&A Report(May 2021) (HY/2011/03)

https://www.epd.gov.hk/eia/english/register/index8/vep4592014_content.html

 

 

 

 

 

 

EP-456/2013/A

Drainage Improvement Works at Ngong Ping

Monthly Environmental Monitoring And Audit Report (May 2021)DC/2019/06

https://www.epd.gov.hk/eia/english/register/index8/vep5592019_content.html

 

 

 

 

 

 

EP-560/2018

Intermodal Transfer Terminal – Bonded Vehicular Bridge and Associated Roads

EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5602018_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly EM&A Report (May 2021) 

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Quarterly EM&A Report (Dec 2020 to Feb 2021) (HY/2012/08)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-535/2017

Improvement Dredging for Lamma Power Station Navigation Channel

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html

 

 

 

 

 

EP-535/2017

Improvement Dredging for Lamma Power Station Navigation Channel

Quality EM&A Report (Feb 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5352017_content.html

 

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Seventy-second Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 


EP-248/2006

Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Projec

Quarterly EM&A Report (Jan 2021 to Mar 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep2482006_content.html

 

 

 

 

 

 

EP-01/059/2000/C

The Theme Park at Penny's Bay, Lantau

189th Monthly EM&A Report (12 May 2021 to 11 Jun 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep3782012_content.html

 

 

 

 

 

EP-573/2020

Bay to Bay Express Cable System - Hong Kong Segment (BtoBE-HK) – Chung Hom Kok

Monthly EM&A ReportMay 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5732020_content.html

 

 

 

 

 

 

- North District

 

 

EP-534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

 

FEP-01/534/2017/A

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Quarterly EM&A Report (Oct 2020 to Dec 2020)(YL/2017/03)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Quarterly EM&A Report (Jul 2020 to Oct 2020)(YL/2017/03)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (May 2021)(CV/2012/09)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (May 2021)(HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

 

 

EP-517/2017/A

Expansion of Sha Tau Kok Sewage Treatment Works

Quarterly EM&A Report(Mar 2021 to May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5672019_content.html

 

 

 

 

 

 

EP-510/2016

Police Facilities in Kong Nga Po

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5102016_content.html

 

 

 

 

 

 

EP-450/2013/A

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Quarterly EM&A Report (Feb 2021 to Apr 2021)(YL/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

FEP-02/474/2013

Shek Wu Hui Effluent Polishing Plant

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1792018_content.html

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-466/2013

NENT - Castle Peak Road Diversion

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(Mayr 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Monthly EM&A Report (May 2021)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

 

EP-404/2011/D

Liantang / Heung Yuen Wai Boundary Control Point and Associated Works

Quarterly EM&A Report (Feb 2021 to Apr 2021)

http://www.epd.gov.hk/eia/english/register/index8/vep5192016_content.html

 

 

 

 

 

 

- Sai Kung District

 

 

EP-513/2016

Development of Anderson Road Quarry site - Road Improvement Works

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5132016_content.html

 

 

 

 

FEP-01/503/2015/A

Desalination Plant at Tseung Kwan O

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1922019_content.html

 

 

 

 

 

EP-573/2020

Bay to Bay Express Cable System - Hong Kong Segment (BtoBE-HK) – Chung Hom Kok

Monthly EM&A ReportMay 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5732020_content.html

 

 

 

 

 

 

FEP-01/308/2008/B

South-East New Territories Landfill Extension

Monthly EM&A Report No. 29(May 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1872018_content.html

 

 

 

 

 

 

EP-319/2009/D

Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

Monthly EM&A Report (May 2021) (V.1)

http://www.epd.gov.hk/eia/english/register/index8/vep4242014_content.html

 

 

 

 

EP-503/2015/A

Desalination Plant at Tseung Kwan O

34th Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5402018_content.html

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly EM&A Report (Nov 2020 to Jan 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly EM&A Report (Aug 2020 to Oct 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Quarterly Environmental Monitoring and Audit Report (Feb 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

EP-134/2002/N

Fill Bank at Tseung Kwan O Area 137

Monthly Environmental Monitoring and Audit Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5632019_content.html

 

 

 

 

 

 

EP-516/2016

Port Shelter Sewerage, Stage3 – Sewerage Works at Po Toi O

Monthly EM&A ReportMay 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5162016_content.html

 

 

 

 

 

 

- Sha Tin District

 

 

EP-494/2015

In-situ Reprovisioning of Sha Tin Water Treatment Works - South Works

Monthly EM&A Report No.63

http://www.epd.gov.hk/eia/english/register/aep/ep4942014_content.html

 

 

EP-463/2013/B

Widening and Reconstruction of Tai Po Road (Sha Tin Section)

Quarterly EM&A Report (Mar 2021 to May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5142016_content.html

 

 

 

 

EP-533/2017

Sha Tin Cavern Sewage Treatment Works

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5332017_content.html

 

 

 

 

 

- Tai Po District

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (May 2021)(CV/2012/09)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

EP-324/2008/E

Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling

Monthly EM&A Report (May 2021)(HY/2012/06)

https://www.epd.gov.hk/eia/english/register/index8/vep5222016_content.html

 

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Monthly EM&A Report(May 2021) (CV/2012/05)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Quarterly EM&A Report(Jun 2020 to Aug 2020) (CV/2012/05)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Quarterly EM&A Report(Dec 2020 to Feb 2021) (CV/2012/05)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Quarterly EM&A Report(Sep 2020 to Nov 2020) (CV/2012/05)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Quarterly EM&A Report (Mar 2021 to May 2021) (CV/2012/05)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Annual EM&A Review Report (Dec 2017 to Nov 2018)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Annual EM&A Review Report (Dec 2019 to Nov 2020)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Annual EM&A Review Report (Dec 2018 to Nov 2019)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Quarterly EM&A Report(Mar 2020 to May 2020) (CV/2012/05)

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

 

EP-388/2010

Development of a Bathing Beach at Lung Mei, Tai Po

Final Review Environmental Monitoring and Audit Report

https://www.epd.gov.hk/eia/english/register/aep/ep3882010_content.html

 

 

 

 

 

 

EP-470/2013

NENT - Utilization of Treated Sewage Effluent (TSE) from Shek Wu Hui Sewage Treatment Works

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4702013_content.html

 

 

 

 

EP-475/2013/A

Reprovision of temporary Wholesale Market in Fanling North New Development Area

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5162016_content.html

 

 

 

 

EP-468/2013/A

Kwu Tung North New Development Area Road D1 to D5

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5232016_content.html

 

 

 

 

 

EP-466/2013

 NENT - Castle Peak Road Diversion

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4662013_content.html

 

 

 

 

 

 

EP-467/2013/A

Kwu Tung North New Development Area Road P1 and P2 and Associated New Kwu Tung Interchange and Pak Shek Au Interchange Improvement

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5242016_content.html

 

 

 

 

 

 

EP-469/2013

NENT - Sewage Pumping Stations in Kwu Tung North New Development Areaf

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4692013_content.html

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

- Tsuen Wan District

 

 

EP-076/2000

Upgrading of Siu Ho Wan Sewage Treatment Plant

Monthly Environmental Monitoring And Audit Report (May 2021)

http://www.epd.gov.hk/eia/english/register/aep/ep0762000_content.html

 

 

 

 

 

 

FEP-01/395/2010/C

Organic Waste Treatment Facilities, Phase I

Seventy-second Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep4872015_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.65

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.64

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.63

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Quarterly EM&A Report No.21 (Jan 2021 to Mar 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

- Tuen Mun District

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.65

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.64

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Construction Phase Monthly EM&A Report No.63

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-489/2014

Expansion of Hong Kong International Airport into a Three-Runway System

Quarterly EM&A Report No.21 (Jan 2021 to Mar 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4892014_content.html

 

 

 

 

 

 

EP-429/2012/A
FEP-01/429/2012/A

Development of the Integrated Waste Management Facilities Phase 1

Monthly EM&A Report No.35(Rev A)

https://www.epd.gov.hk/eia/english/register/index7/fep1772017_content.html

 

 

 

 

 

 

FEP-01/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the double berth jetty at LNG Terminal

Monthly Environmental Monitoring and Audit (EM&A) Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5832020_content.html

 

 

 

 

FEP-02/558/2018/A

Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Lamma Power Station (LPS) and the associated Gas Receiving Station (GRS) in LPS

Monthly Environmental Monitoring and Audit (EM&A) Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5862020_content.html

 

 

 

 

FEP-03/558/2018/A

 Hong Kong Offshore LNG Terminal - Works associated with the subsea gas pipeline for Black Point Power Station (BPPS) and the associated Gas Receiving Station (GRS) in BPPS

Monthly Environmental Monitoring and Audit (EM&A) Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5872020_content.html

 

 

 

 

EP-534/2017/A

 Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5542018_content.html

 

 

 

 

EP-534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5342017_content.html

 

 

 

 

FEP-01/534/2017

Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1802018_content.html

 

 

 

 

FEP-01/534/2017/A

 Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5552018_content.html

 

 

 

 

 

EP-210/2005/D

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Quarterly EM&A Report(Feb 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html

 

 

 

 

 

 

EP-210/2005/D

Expansion and Extension of Fill Bank at Tuen Mun Area 38

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5772020_content.html

 

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Monthly EM&A Report (May 2021) 

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

EP-354/2009/D

Tuen Mun - Chek Lap Kok Link

Quarterly EM&A Report (Dec 2020 to Feb 2021) (HY/2012/08)

https://www.epd.gov.hk/eia/english/register/index8/vep4692015_content.html

 

 

 

 

 

 

EP-441/2012/A

Enhanced Ash Utilisation and Water Management Facilities at the Castle Peak Power Station (CPPS)

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5432018_content.html

 

 

 

 

 

 

EP-507/2016/C

Installation of One additional gas-fired generation unit (CCGT Unit No. 1) at the Black Point Power Station

Monthly EM&A Report no.54

https://www.epd.gov.hk/eia/english/register/index8/vep5752020_content.html

 

 

 

 

 

 

FEP-03/507/2016/C

Additional Gas-fired Generation units Project - Installation of one additional gas-fired generation unit (CCGT Unit No. 2) at the Black Point Power Station

Monthly EM&A Report no.54

https://www.epd.gov.hk/eia/english/register/index7/fep2012020_content.html

 

 

 

 

 

 

- Yuen Long District

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Quarterly EM&A Report (Oct 2020 to Dec 2020)(YL/2017/03)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

 

 

EP-477/2013

Development of Lok Ma Chau Loop

Quarterly EM&A Report (Jul 2020 to Oct 2020)(YL/2017/03)

https://www.epd.gov.hk/eia/english/register/aep/ep4772013_content.html

 

 

 

 

 

 

EP-464/2013

Expansion of Ha Tsuen Sewage Pumping Station

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep4642013_content.html

 

 

 

 

EP-450/2013/A

Construction of Cycle Tracks and the associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River

Quarterly EM&A Report (Feb 2021 to Apr 2021)(YL/2015/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4782015_content.html

 

 

 

 

EP-311/2008/E

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html

 

 

 

 

EP-311/2008/E

Proposed Comprehensive Development at Wo Shang Wai, Yuen Long

Quarterly EM&A Report (Feb 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5382017_content.html

 

 

 

 

 

 

EP-565/2019

Yuen Long Effluent Polishing Plant

Monthly EM&A ReportMay 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5652019_content.html

 

 

 

 

 

 

- Kwai Tsing District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

- Central & Western District

 

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (May 2021) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

 

 

EP-364/2009

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jan 2021 to Apr 2021) 

https://www.epd.gov.hk/eia/english/register/aep/ep3642009_content.html

 

 

 

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Quarterly EM&A Report (Jan 2021 to Apr 2021) 

https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (May 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (May 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HY/2010/08) - Marine Work

Monthly EM&A Report (May 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (May 2021)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jan 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

- Wan Chai District

 

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (May 2021) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

 

 

FEP-03/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html

 

 

 

 

 

 

FEP-03/376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Quarterly EM&A Report (Jan 2021 to Apr 2021) 

https://www.epd.gov.hk/eia/english/register/index7/fep1982020_content.html

 

 

 

 

 

 

EP-364/2009

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jan 2021 to Apr 2021) 

https://www.epd.gov.hk/eia/english/register/aep/ep3642009_content.html

 

 

 

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Quarterly EM&A Report (Jan 2021 to Apr 2021) 

https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (May 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (May 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HY/2010/08) - Marine Work

Monthly EM&A Report (May 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (May 2021)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(May  2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jan 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

- Eastern District

 

 

EP-122/2002/E

Central Reclamation Phase III

Monthly EM&A Report (May 2021) (HY/2019/18)

http://www.epd.gov.hk/eia/english/register/index8/vep4832015_content.html

 

 

EP-356/2009

Wan Chai Development Phase II and Central-Wan Chai Bypass

Monthly EM&A Report (May 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/aep/ep3562009_content.html

 

 

 

 

 

 

FEP-04/356/2009

Central - Wan Chai Bypass - Tunnel (Causeway Bay Typhoon shelter section) Contract No. HY/2009/15 - Marine Works

Monthly EM&A Report (May 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1172010_content.html

 

 

 

 

 

 

FEP-07/356/2009

Wan Chai Development Phase II - Central - Wan Chai Bypass at Wan Chai West (Contract No. HY/2010/08) - Marine Work

Monthly EM&A Report (May 2021)(HY/2019/18)

https://www.epd.gov.hk/eia/english/register/index7/fep1492013_content.html

 

 

 

 

 

 

EP-364/2009

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jan 2021 to Apr 2021) 

https://www.epd.gov.hk/eia/english/register/aep/ep3642009_content.html

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-376/2009       

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Monthly EM&A Report (May 2021)(HY/2019/18)

http://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

EP-376/2009

DP2-Road P2 and other roads which are classified as primary/district distributor roads

Quarterly EM&A Report (Jan 2021 to Apr 2021) 

https://www.epd.gov.hk/eia/english/register/aep/ep3762009_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly EM&A Report (Nov 2020 to Jan 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly EM&A Report (Aug 2020 to Oct 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-473/2013/A

Fanling Bypass Eastern Section

Monthly EM&A Report(May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5262016_content.html

 

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Quarterly EM&A Report (Jan 2021 to Apr 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

FEP-13/364/2009/H

Central-Wanchai Bypass (CWB) including its road tunnel and slip roads

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index7/fep1992020_content.html

 

 

 

 

 

 

- Southern District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-537/2017

Proposed Extension of Academic Block, The Swire Institute of Marine Science, Faculty of Science, The University of Hong Kong, Cape D’Aguilar Road, Shek O

Monthly EM&A Report No.44

http://www.epd.gov.hk/eia/english/register/aep/ep5372017_content.html

 

 

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

 

EP-487/2014/A

Tai Shue Wan Development at Ocean Park

Quarterly EM&A Report (Mar 2021 to May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5392017_content.html

 

 

 

 

 

 

EP-573/2020

Bay to Bay Express Cable System - Hong Kong Segment (BtoBE-HK) – Chung Hom Kok

Monthly EM&A ReportMay 2021

https://www.epd.gov.hk/eia/english/register/aep/ep5732020_content.html

 

 

 

 

 

 


EP-287/2007

Lamma Power Station - Unit L2 Flue Gas Desulphurization Plant Retrofit Project

Quarterly EM&A Report (Jan 2021 to Mar 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep2872007_content.html

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly EM&A Report (Nov 2020 to Jan 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly EM&A Report (Aug 2020 to Oct 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

- Kowloon City District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-451/2013

Trunk Road T2

Monthly EM&A Report (May 2021)(ED/2018/04)

https://www.epd.gov.hk/eia/english/register/aep/ep4512013_content.html 

 

 

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (May 2021) (ED/2018/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (May 2021)(KL/2014/01)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

 

 

EP-445/2013/A

Kai Tak Development – Roads D3A & D4A

Monthly EM&A Report (May 2021) (ED/2018/05)

https://www.epd.gov.hk/eia/english/register/index8/vep4492014_content.html

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

EP-563/2018

The Development of AFCD Animal Management and Animal Welfare Building Complex in Kai Tak Development

Monthly Audit Report No. 08

https://www.epd.gov.hk/eia/english/register/aep/ep5632018_content.html

 

 

 

 

 

 

- Kwun Tong District

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-564/2018

Lei Yue Mun Waterfront Enhancement Project

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5642018_content.html

 

 

 

 

EP-458/2013/C

Tseung Kwan O – Lam Tin Tunnel and Associated Works

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly EM&A Report (Nov 2020 to Jan 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-458/2013/C

Tseung Kwan O - Lam Tin Tunnel and Associated Works ED/2018/04 - Cha Kwo Ling

Quarterly EM&A Report (Aug 2020 to Oct 2020)

https://www.epd.gov.hk/eia/english/register/index8/vep5272016ED201804_content.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

- Sham Shui Po District

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DE/2018/17)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

EP-322/2008/G

Harbour Area Treatment Scheme (HATS) Stage 2A

Monthly EM&A Report (May 2021)(DC/2009/10)

http://www.epd.gov.hk/eia/english/register/index8/vep4362014_content.html

 

 

 

 

 

 

- Wong Tai Sin District

 

 

EP-337/2009        

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021) (ED/2018/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021) (ED/2018/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021)(KL/2016/05)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

EP-337/2009

New Distributor Roads Serving the Planned Kai Tak Development

Monthly EM&A Report (May 2021)(KL/2014/01)

http://www.epd.gov.hk/eia/english/register/aep/ep3372009.html

 

 

 

 

 

 

EP-544/2017

Kai Tak Sports Park

EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/aep/ep5442017_content.html

 

 

 

 

 

 

- Yau Tsim Mong District

 

 

EP-453/2013/B

Underpass Road and Austin Road Flyover Serving the West Kowloon Cultural District

Monthly EM&A Report (May 2021)

https://www.epd.gov.hk/eia/english/register/index8/vep5032016_content.html

 

 

 

 

 

 

EP-523/2016

Proposed Sewage Pumping Station and Dry Weather Flow Interceptor at Cherry Street Box Culvert

Submission of Monthly EM&A Report No.41

https://www.epd.gov.hk/eia/english/register/aep/ep5232016_content.html