- Basic Principles of Environmental Impact Assessment Process [GN 1/2023]
- The Role and Operation of Environmental Study Management Group [GN 2/2023]
- Flexibility and Enforceability of Mitigation Measures Proposed in an Environmental Impact Assessment Report [GN 3/2023]
- The Role of Independent Environmental Checker [GN 4/2023]
- Implementation Schedule for Mitigation Measures arising from the Environmental Impact Assessment Process [GN 5/2023]
- Some Observations on Ecological Assessment From the Environmental Impact Assessment Ordinance Perspective [GN 6/2023]
- Ecological Baseline Survey for Ecological Assessment [GN 7/2023]
- Preparation of Landscape And Visual Impact Assessment Under the Environmental Impact Assessment Ordinance [GN 8/2023]
- Preparation of Construction Noise Impact Assessment Under the Environmental Impact Assessment Ordinance [GN 9/2023]
- Methodologies for Terrestrial and Freshwater Ecological Baseline Surveys [GN 10/2023]
- Methodologies for Marine Ecological Baseline Surveys [GN 11/2023]
- Road Traffic Noise Impact Assessment under the Environmental Impact Assessment Ordinance [GN 12/2023]
- Advertisement and Public Inspection of Documents [GN 13/2023]
- Fees and Submissions for EIAO Applications [GN 14/2023]
- Methodologies for Fisheries Baseline Surveys [GN 15/2023]
- Preparation of Fixed Noise Sources Impact Assessment Under the Environmental Impact Assessment Ordinance [GN 16/2023]