| Facility | : | Sludge Treatment Facility (STF) |
| Location | : | Tsang Tsui, Nim Wan, Tuen Mun |
| Design Capacity | : | 2,000 tonnes/day |
| Commencement of Operation | : | 1 April 2015 (Phase 1) |
| 5 April 2016 (Phase 2) | ||
| Contract Operation Period | : | 15 years |
| Contractor | : | VW-VES(HK) Ltd |
Technical Information
|
Technical Information
|
Remarks
|
|---|---|
|
Design Capacity
|
· 1,600 tonnes/day (Phase 1)
· 400 tonnes/day (Phase 2)
|
|
Incineration technology
|
· 4 fluidized bed incinerators, grouped into two plants each with 2 incinerator units
· The incineration process is raised to at least 850oC for
at least 2 seconds
|
|
Flue gas treatment system
|
· Selective non-catalytic reduction of NOx
· Multi-cyclone
· Dry reactor
· Bag filter
|
|
Seawater desalination plant
|
· Reverse osmosis technology
· 600 m3/day of potable and process water produced
|
|
Power generation system
|
· Two 14 MW Steam Turbine Generators
|