List of environmental impact assessment released

List of environmental impact assessment released

The Environmental Protection Department today (April 6) released a list of completed and on-going statutory environmental impact assessment (EIA) as well as non-statutory environmental studies for major development projects between January 1, 2007 and March 31, 2007.

Completed statutory EIA and non-statutory environmental studies:
--------------------------------------------------------------------------------

A. Statutory EIA:
    ----------------

1.  Relocation of Yiu Lian Floating Dock No. 3
(Yiu Lian Dockyards Limited)

2. A Commercial Scale Wind Turbine Pilot Demonstration at Hei Ling Chau
(Castle Peak Power Company Limited)

Reports and executive summaries of the above-mentioned approved statutory EIA are now available at the following locations:

a) EIA Ordinance Register Office, EPD, 27th floor, Southorn Centre, 130 Hennessy Road, Wan Chai;

b) Wan Chai Environmental Resource Centre, 221 Queen's Road East, Wan Chai;

c) Tsuen Wan Environmental Resource Centre, Tak Wah Park, Tak Wah Street, Tsuen Wan;

d) Fanling Environmental Resource Centre, 2/F, Government Accommodations, Grand Regentville, 9 Wo Mun Street, Luen Wo Hui, Fanling;

e) Public Enquiry Centre of relevant District Office(s); and

f) EIA Ordinance website at www.epd.gov.hk/eia.

B. Non-statutory Environmental Studies:
    ---------------------------------------------

 Nil

Ongoing statutory EIA and non-statutory environmental studies:
------------------------------------------------------------------------------

A.  Statutory EIA:
 --------------------

1. Reclamation of Sai Wan Typhoon Shelter and Associated Engineering Works at Cheung Chau
(Civil Engineering and Development Department)

2. Remaining Development in Tung Chung and Tai Ho - Comprehensive Feasibility Study
(Civil Engineering and Development Department)

3. Flyover at Junction of Che Kung Miu Road/Hung Mui Kuk Road
(Highways Department)

4. Proposed Shuen Wan Landfill Golf Course
(Home Affairs Bureau)

5. Widening of T6 Bridge, Sha Tin
(Highways Department)

6. Widening of Tate's Cairn Highway between Shek Mun Interchange and T6 Interchange - Environmental Impact Assessment
(Highways Department)

7. Drainage Improvement in Sha Tin and Tai Po
(Drainage Services Department)

8. Drainage Improvement in the Northern New Territories - Package C
(Drainage Services Department)

9. Tseung Kwan O Development Contract No. TK 44/97: Dualling of Hang Hau Road - Environmental Impact Assessment
(Civil Engineering and Development Department)

10. Sai Kung Sewage Treatment Works, Phase II Upgrading
(Drainage Services Department)

11. Planning and Development Study on North East New Territories
(Civil Engineering and Development Department)

12. Road Widening of Hing Wah Street
(Highways Department)

13. Extension of Kwai Chung Crematorium 
(Architectural Services Department)

14. Shatin to Central Link (EIA Study Brief no. ESB-106/2002)
(Kowloon-Canton Railway Corporation)
 
15. Animal Cremator
(Environmental Protection Department)

16. Flyover and Adjoining Footbridge between Yuen Long On Ning Road and Kau Yuk Road
(Highways Department)

17. Feasibility Study of Waste-to-Energy Incineration Facilities - Environmental Impact Assessment
(Environmental Protection Department)

18. Planning and Development Study of Potential Housing Site near Area 1 (San Wai Court), Tuen Mun
(Civil Engineering and Development Department)

19. Lau Fau Shan Development - Package 4
(Civil Engineering and Development Department)

20. San Tin Western Main Drainage Channel
(Drainage Services Department)

21. PWP Item No. 471CL (Part) - Lau Fau Shan Development, Remaining Engineering (Civil Engineering and Development Department)

22. Planning and Development Study on North West New Territories
(Civil Engineering and Development Department)

23. Proposed Development at Fung Lok Wai, Yuen Long at Lot 1457 R.P. in DD123
(Mutual Luck Investment Limited)

24. Proposed Road A connecting Sin Fat Road and Cha Kwo Ling Road at Cha Kwo Ling, Kwun Tong
(Civil Engineering and Development Department)

25. Central Kowloon Route (EIA Study Brief no. ESB-096/2002)
(Highways Department)

26. Western Harbour Submarine Pipeline and Associated Stations
(The Hong Kong China Gas Company Limited)

27. Aberdeen, Ap Lei Chau and Pok Fu Lam Sewerage and Sewage Disposal Stage II
(Drainage Services Department)

28. Proposed Submarine Pipelines System from Tuen Mun to Tung Chung And Associated Offtake and Pigging Station at Chek Lap Kok
(The Hong Kong & China Gas Company Limited)

29. Hong Kong - Zhuhai - Macao Bridge Hong Kong Section and North Lantau Highways Connection
(Highways Department)

30. West Island Line and South Island Line
(MTR Corporation Limited)

31. Northeast New Territories (NENT) Landfill Extension
(Environmental Protection Department)

32. Optimised Shatin to Central Link Conforming Scheme (East West Railway Corridor) (EIA Study Brief no. ESB-115/2004)
(Kowloon-Canton Railway Corporation)

33. Optimised Shatin to Central Link Conforming Scheme (North South Railway Corridor) (EIA Study Brief no. ESB-116/2004)
(Kowloon-Canton Railway Corporation)
           
34. West New Territories (WENT) Landfill Extensions
(Environmental Protection Department)

35. Southeast New Territories (SENT) Landfill Extension
(Environmental Protection Department)

36. Harbour Area Treatment Scheme (HATS) - Provision of Disinfection Facilities at Stonecutters Island Sewage Treatment Works
(Drainage Services Department)

37. Lantau Logistics Park Development
(Civil Engineering and Development Department)

38. Upgrading of Pillar Point Sewage Treatment Works
(Drainage Services Department)

39. Liquefied Natural Gas (LNG) Receiving Terminal and Associated Facilities
(Castle Peak Power Company Limited.)

40. "Provision of Additional Interchange Connecting Tuen Mun Road and Castle Peak Road Near Sam Shing Estate" and "Widening of Tuen Mun Road at Tsing Tin Interchange"
(Highways Department)

41. Proposed Development Phase IV at CRC Oil Terminal, Tsing Yi-Refrigerated Storage Tanks for Liquefied Gas
(China Resources Petrochems (Group) Co. Ltd.)

42. Harbour Area Treatment Scheme (HATS) Stage 2A
(Drainage Services Department)

43. West Island Line
(MTR Corporation Limited)

44. Proposed Comprehensive Development at Wo Shang Wai, Yuen Long
(Profit Point Enterprises Limited)

45. Laying of Western Cross Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun
(Water Supplies Department)

46. Development of a Bathing Beach at Lung Mei, Tai Po
(Civil Engineering and Development Department)
 
47. Widening of Yeung Uk Road Between Tai Ho Road and Ma Tau Pa Road, Tsuen Wan
(Civil Engineering and Development Department)

48. Provision of Cremators at Wo Hop Shek Crematorium
(Architectural Services Department)

49. Tsuen Wan Bypass, widening of Tsuen Wan Road between Tsuen Tsing Interchange and Kwai Tsing Interchange, and associated junction improvement works
(Civil Engineering and Development Department)  

50. Proposed Helipad on Rooftop of the Proposed North Lantau Hospital at Yu Tung Road, Tung Chung, Lantau
(Secretary for Health, Welfare and Food) 

51. A Commercial Scale Wind Turbine Pilot Demonstration at Kau Sai Chau
(Castle Peak Power Company Limited)
 
52. Hong Kong Offshore Wind Farm in Southeastern Waters
(HK Offshore Wind Limited)

53. West Kowloon Reclamation
Road D1A(N) - Between Yan Cheung Road and Jordan Road
(Civil Engineering and Development Department)

54. West Kowloon Reclamation
Road D1A(S) and Road D1 - Between Jordan Road and Road D12
Road D12 - Between Canton Road and Lin Cheung Road
(Civil Engineering and Development Department)

55, Construction of Cycle Tracks and the Associated Supporting Facilities from Sha Po Tsuen to Shek Sheung River
(Civil Engineering and Development Department)

56. Integration of Siu Ho Wan and Silver Mine Bay Water Treatment Works
(Water Supplies Department)

57. Development of a 100MW Offshore Wind Farm in Hong Kong
(The Hong Kong Electric Co. Ltd.)
     
58. Kai Tak Development
(Civil Engineering and Development Department)

59. Wan Chai Development Phase II and Central-Wan Chai Bypass
(Civil Engineering and Development Department)

60. West Kowloon Drainage Improvement - Lai Chi Kok Transfer Scheme
Inter - reservoirs Transfer Scheme
Water Tunnel between Kowloon Byewash Reservoir and Lower Shing Mun Reservoir
(Water Supplies Department)

61. Widening of Gascoigne Road Flyover
(Highways Department)     

62. Central Kowloon Route (EIA Study Brief no. ESB-156/2006)
(Highways Department)     

62. Tuen Mun Area 54 Sewage Pumping Station
(Civil Engineering and Development Department)

64. Landslide Preventive Works at Po Shan, Mid-levels-Design and Construction (Natural Terrain Risk Mitigation Works)
(Civil Engineering and Development Department)

65. Dredging Works for Proposed Cruise Terminal at Kai Tak
(Civil Engineering and Development Department)

66. Decommissioning of the Former Kai Tak Airport other than the North Apron
(Civil Engineering and Development Department)

67. Traffic Improvements to Tuen Mun Road Town Centre Section
(Highways Department)

68. Development of a Poultry Slaughtering and Processing Plant in Sheung Shui
(Architectural Services Department)


B. Non-statutory Environmental Studies:
    ---------------------------------------------

1. Dualling of Clear Water Bay Road between Tai Po Tsai and Hang Hau Road
(Highways Department)

2. Strategic Environmental Assessment for Hong Kong 2030: Planning Vision and Strategy
(Planning Department)

3. Investigation and Preliminary Design for Reconstruction and Improvement of Tuen Mun Road
(Highways Department)

4. Sunnyville Estate Development at Nam Sang Wai, Yuen Long
(Private Developer)

5. Development of an Integrated Arts, Cultural and Entertainment District of at the West Kowloon Reclamation, Hong Kong
(Housing, Planning and Lands Bureau)

6. Planning and Engineering Feasibility Study for North of Pamela Youde Hospital, Chai Wan
(Civil Engineering and Development Department)

7. Feasibility Study for Development at Cha Kwo Ling Kaolin Mine Site
(Civil Engineering and Development Department)

8. Restoration of the East Lamma Channel Marine Borrow Area
(Civil Engineering and Development Department)

9. Drainage Improvement in Tuen Mun
(Drainage Services Department)

10. Drainage Improvement in East Kowloon
(Drainage Services Department)

11. Kai Tak Planning Review
(Planning Department)

12. Engineering Strategy on Total Water Management for Hong Kong - Feasibility Study
(Water Supplies Department)

Information related to the EIA Ordinance is also available at the EIA Ordinance website.

End/Friday, April 6, 2007

 

 

Back to topTable of Content