Agreement No. CE 87/2001 (CE)

FURTHER DEVELOPMENT OF TSEUNG KWAN O

FEASIBILITY STUDY

 

Environmental Impact Assessment

 

 

 

Volume 1 (Text)

 

LIST OF CONTENTS

 

1          INTRODUCTION

1.1       Project Background     

1.2       Objective and Scope of the EIA Study

1.3       Consideration of Environmental Impact Assessment Ordinance

1.4       EIA Study Area

1.5       Relevant Approved EIA Reports and Studies

1.6       Approach of the EIA Report

1.7       Structure of the EIA Report

2.         PROJECT DESCRIPTION

2.1       Site Location   

2.2       Project Requirements, Scope and Benefits       

2.3       Consideration of Alternatives and Development of Preferred Option

2.4       Conceptual Plan and Proposed Development Option

2.5       Construction Methods and Engineering Requirements

2.6       Operation of the Project

2.7       Project Programme

2.8       Concurrent Projects     

3.         AIR QUALITY

3.1       Introduction     

3.2       Environmental Legislation, Policies, Plans, Standards and Criteria         

3.3       Description of the Environment

3.4       Air Sensitive Receivers

3.5       Identification of Pollutant Sources

3.6       Assessment Methodology        

3.7       Identification, Prediction and Evaluation of Air Quality Impacts

3.8       Mitigation Measures    

3.9       Residual Environmental Impact

3.10     Environmental Monitoring and Audit Requirements

 

 

4.         NOISE IMPACT

4.1       Introduction     

4.2       Environmental Legislation, Policies, Plans, Standards and Criteria

4.3       Description of the Environment

4.4       Noise Sensitive Receivers

4.5       Assessment Methodology        

4.6       Overview of Relevant Studies  

4.7       Identification of Environmental Impacts 

4.8       Prediction and Evaluation of Environmental Impacts

4.9       Mitigation of Adverse Environmental Impacts

4.10     Evaluation of Residual Impacts

4.11     Environmental Monitoring and Audit     

 

5.         HYDRODYNAMICS AND WATER QUALITY IMPACTS

5.1       Introduction

5.2       Environmental Legislation, Policies, Plans, Standards and Criteria

5.3       Description of the Environment

5.4       Water Sensitive Receivers

5.5       Assessment Methodology

5.6       Identification of Environmental Impact  

5.7       Prediction and Evaluation of Environmental Impacts

5.8       Mitigation of Adverse Environmental Impacts

5.9       Evaluation of Residual Impacts

5.10     Environmental Monitoring and Audit

 

6          SEWERAGE AND SEWAGE TREATMENT

6.1       Introduction

6.2       Sewerage Catchment Area, Development and Flow Projections

6.3       Existing & Committed Sewerage Infrastructure

6.4       Sewerage Impact Assessment  

6.5       Recommended works  

6.6       Summary         

 

7.         TERRESTRIAL ECOLOGY

7.1       Introduction

7.2       Environmental Legislation, Policies, Plans, Standards and Criteria

7.3       Assessment Methodology

7.4       Description of the Environment

7.5       Ecological Value          

7.6       Identification of Environmental Impacts

7.7       Evaluation of Environmental Impacts    

7.8       Mitigation of Adverse Environmental Impacts

7.9       Evaluation of Residual Impacts 

7.10     Environmental Monitoring and Audit

 

8.         MARINE ECOLOGY

8.1       Introduction

8.2       Environmental Legislation, Policies, Plans, Standards and Criteria         

8.3       Assessment Methodology

8.4       Description of the Environment

8.5       Ecological Value          

8.6       Identification of Environmental Impacts

8.7       Prediction and Evaluation of Environmental Impacts

8.8       Mitigation of Adverse Environmental Impacts

8.9       Evaluation of Residual Impacts

8.10     Environmental Monitoring and Audit

 

9          FISHERIES IMPACT

9.1       Introduction

9.2       Environmental Legislation, Standards and Guidelines

9.3       Assessment Methodology        

9.4       Description of the Environment

9.5       Environmental Impact Identification, Prediction and Evaluation  

9.6       Mitigation of Adverse Environmental Impacts   

9.7       Evaluation of Residual Impacts 

9.8       Environmental Monitoring and Audit     

 

10.       LANDSCAPE AND VISUAL IMPACTS

10.1     Introduction     

10.2     Environmental Legislation and Guidelines          

10.3     Scope and Content of the Study           

10.4     Planning and Development Control Framework

10.5     Comments on Landscape and Visual Issues Received during Previous Consultations     

10.6     Baseline Study

10.7     Landscape Impact Assessment

10.8     Visual Impact Assessment        

10.9     Conclusions     

 

11.       WASTE MANAGEMENT IMPLICATIONS

11.1     Introduction     

11.2     Environmental Legislation, Policies, Plans, Standards and Criteria         

11.3     Assessment Methodology        

11.4     Baseline Conditions     

11.5     Identification and Evaluation of Environmental Impacts

11.6     Mitigation of Adverse Environmental Impacts   

11.7     Evaluation of Residual Impacts 

11.8     Environmental Monitoring and Audit     

 

12        BIOGAS ASSESSMENT

12.1     Introduction     

12.2     Calculation of Potential Gas Emissions  

12.3     Evaluation of Significance of Potential Gas Emissions

12.4     Conclusion      

 

13        IMPACT ON CULTURE HERITAGE

13.1     Introduction     

13.2     Environmental Legislation and Standards

13.3     Assessment Methodology

13.4     Baseline Condition       

13.5     Identification and Evaluation of Potential Cultural Heritage Impacts

13.6          Mitigation of Adverse Impacts 

13.7     Residual Environmental Impact

13.8     Environmental Monitoring and Audit Requirements

 

14        LANDFILL GAS HAZARD

14.1     Introduction     

14.2     Government Legislation and Standards

14.3     Description of the Environment

14.4     Assessment Methodology        

14.5     Qualitative Source-Pathway-Target Analysis

14.6     Site Categorisation       

14.7     Recommended Precautionary Measures for Construction Phase and Operational Phase   

 

15.       HAZARD TO LIFE

15.1     Introduction     

15.2     Environmental Legislations, Policies, Plans, Standards and Criteria

15.3     Previous Assessment for Hazard to Life of Proposed DGVFP  

15.4     Hazard to Life Assessment

15.5     Conclusions and Recommendations      

 

16.       ENVIRONMENTAL MONITORING AND AUDIT

16.1     Introduction     

16.2     Air Quality Impact

16.3     Noise Impact   

16.4     Water Quality Impact

16.5     Terrestrial Ecology       

16.6     Marine Ecology           

16.7     Fisheries Impact          

16.8     Landscape and Visual Impact  

16.9     Waste Management Implications          

16.10   Impact on Cultural Heritage     

16.11   Landfill Gas Hazard Assessment          

 

17.       CONCLUSION AND RECOMMENDATIONS

17.1     Introduction     

17.2     Air Quality Impact       

17.3     Noise  Impact  

17.4     Water Quality Impact  

17.5     Sewerage and Sewage Treatment Implications 

17.6     Terrestrial Ecology       

17.7     Marine Ecology           

17.8     Fisheries Impact          

17.9     Landscape and Visual Impact  

17.10   Waste Management Implications

17.11   Biogas Assessment      

17.12   Impact on Cultural Heritage

17.13   Landfill Gas Hazard Assessment

17.14   Hazard to Life 

17.15   Overall Conclusion      

 

18        IMPLEMENTATION SCHEDULE OF PROPOSED MITIGATION MEASURES

 

 

 

 


Tables (no hyperlink provided. please refer to the respective section)

 

Table 1.1          Schedule 2 Designated Projects Under this Project

 

Table 2.1          Summary of Meetings/Consultations During the CPI Process

Table 2.2          Summary of Public’s Views collected during the CPI Process

Table 2.3          Summary of Evaluation Results for Various Development Themes

Table 2.4          Comparison of Scheme 1 and Scheme 3 of WCR Tunnel Alignment

Table 2.5          Concurrent Projects

 

Table 3.1          Hong Kong Air Quality Objectives

Table 3.2          Tunnel Air Quality Guidelines (TAQG)

Table 3.3          EPD Air Quality Monitoring Data at Kwun Tong Station in 2001

Table 3.4          Representative Air Sensitive Receivers in the vicinity of Work Sites during Construction Phase

Table 3.5          Representative Air Sensitive Receivers in the vicinity of Kowloon Section of WCR during Operation Phase

Table 3.6          Representative Air Sensitive Receivers in the vicinity of TKO Town Centre South during Operation Phase

Table 3.7          Emission Factors for Dusty Construction Activities

Table 3.8          Queuing Forecast at EHC Toll Plaza

Table 3.9          Queuing Forecast at WCR Toll Plaza

Table 3.10         Vehicle Idling Emission Factors

Table 3.11         Background Air Pollutant Concentration for Urban Development

Table 3.12         Predicted TSP Concentrations at Representative Air Sensitive Receivers

Table 3.13         Emission Factors for Dusty Construction Activities (With Mitigation Measures)

Table 3.14         Predicted TSP Concentrations at Representative Air Sensitive Receivers (Mitigated)

Table 3.15         Design of Ventilation Building at the eastern portal of WCR and Mid-Ventilation building.

 

Table 4.1          Construction Noise Criteria for Activity other than Percussive Piling

Table 4.2          Acceptable Noise Levels for Percussive Piling

Table 4.3          Permitted Hours of Operation for Percussive Piling

Table 4.4          Acceptable Noise Level for Fixed Plant Noise

Table 4.5          Summary of Representative Existing/ Planned Noise Sensitive Receivers for Construction Noise Impact Assessment

Table 4.6          Summary of Identified Existing/ Planned Noise Sensitive Receivers for Traffic Noise Impact Assessment

Table 4.7          Summary of Selected Noise Sensitive Receivers for Fixed Noise Impact Assessment

Table 4.8          Summary of Construction Tasks and Stages for TKO Further Development

Table 4.9          Summary of Equipments Installed  at Ventilation Building and Pumping Station

Table 4.10         Unmitigated Construction Noise Levels at Representative NSRs

Table 4.11         Unmitigated Traffic Noise Levels at Representative NSRs in TKO Area in Year 2016

Table 4.12         Unmitigated Traffic Noise Levels at Representative NSRs in Kowloon Area in Year 2031

Table 4.13         Unmitigated Traffic Noise Levels at Representative NSRs in TKO Area in Year 2031

Table 4.14         Potential Noise Impact from Fixed Noise Sources

Table 4.15         Predicted Mitigated Construction Noise Levels at NSRs in Worst-Case Scenario (Using Quieter Plant)

Table 4.16         Predicted Mitigated Construction Noise Levels at NSRs in Worst-Case Scenario (Quiet Plant + Movable Noise Barrier)

Table 4.17         Mitigated Traffic Noise Levels at Representative NSRs in TKO Area in Year 2016

Table 4.18         Mitigated Traffic Noise Levels at Representative NSRs in Kowloon Area in Year 2031

Table 4.19         Mitigated Traffic Noise Levels at Representative NSRs in TKO Area in Year 2031

Table 4.20         Number of Non-compliant Dwellings and Classrooms at TKO Area (Year 2016)

Table 4.21         Number of Non-compliant Dwellings and Classrooms at Kowloon Area (Year 2031)

Table 4.22         Number of Non-compliant Dwellings and Classrooms at TKO Area (Year 2031)

Table 5.1          Ultimate Population for TKO

Table 5.2          Summary of Water Quality Objectives for Junk Bay WCZ

Table 5.3          Summary of Water Quality Objectives for Victoria Harbour WCZ

Table 5.4          Summary of Water Quality Objectives for Eastern Buffer WCZ

Table 5.5          WSD Standards at Sea Water Intakes

Table 5.6          Assessment Criterion for SS for Local Marine Biota and Fisheries Resources

Table 5.7          Summary Statistics of 2002 and 2003 Marine Water Quality in Junk Bay WCZ

Table 5.8          Summary Statistics of 2002 and 2003 Marine Water Quality in Eastern Buffer WCZ

Table 5.9          Summary Statistics of 2002 and 2003 Marine Water Quality in Victoria Harbour WCZ

Table 5.10         Field Survey Results

Table 5.11         The Spacing and Cross Section of the Bridge Piers

Table 5.12         Loss Coefficient for the Piers in the Flow Direction Perpendicular to the Bridge Alignment

Table 5.13         Pollution Loading from Stonecutters Sewage Treatment Works under HATS

Table 5.14         Key Water Quality Modelling Parameters

Table 5.15         Key Parameters Selected for Presentation

Table 5.16         Unit Flow Factors

Table 5.17         The Assumed Flow Rate and Quality of Emergency Discharges

Table 5.18         Fill Volumes (with Phase II and Phase III Seawalls founded on Deep Cement Mixing Columns)

Table 5.18a       Sediment Analysis Results from Marine Ground Investigation Works under IETKO and this Study

Table 5.18b       Elutriate Test Results from Marine Ground Investigation Works under Feasibility Study for IETKO and this Study

Table 5.19         Sediment Loss Rate for Filling During the Phase I Seawall Construction

Table 5.20         Scenario for Sediment Plume Modelling

Table 5.21         Predicted Water Quality at EDC for Dry Season (Operational Phase)

Table 5.22         Predicted Water Quality at EDC for Wet Season (Operational Phase)

Table 5.23         Predicted Water Quality at Selected Indicator Points for Dry Season (Operational Phase)

Table 5.24         Predicted Water Quality at Selected Indicator Points for Wet Season (Operational Phase)

Table 5.25         Predicted Water Quality at Selected Cooling Water Intakes and Saltwater Intakes for Dry Season (Operational Phase)

Table 5.26         Predicted Water Quality at Selected Cooling Water Intakes and Saltwater Intakes for Wet Season (Operational Phase)

Table 5.27         Predicted Water Quality at Fish Culture Zones under Scenario 3b

Table 5.28a       Summary of E.coli Impacts Due to Sewage Bypass

Table 5.28b       Predicted Water Quality During Emergency Bypass  (Operational Phase)

Table 5.28c       Depth-averaged and Surface SS concentrations near the Reclamation Site

Table 5.29         Predicted Water Quality at Selected Indicator Points for Dry Season (Construction Phase)

Table 5.30         Predicted Water Quality at Selected Indicator Points for Wet Season (Construction Phase)

Table 5.31         Predicted Water Quality at Selected Cooling Water Intakes and Saltwater Intakes for Dry Season (Construction Phase)

Table 5.32         Predicted Water Quality at Selected Cooling Water Intakes and Saltwater Intakes for Wet Season (Construction Phase)

Table 5.33         Predicted Metal Elevations at Selected Indicated Points for Dry Season (Construction Phase)

Table 5.34         Predicted Metal Elevations at Selected Indicated Points for Wet Season (Construction Phase)

Table 5.35         Predicted Metal Elevations at Selected Cooling Water Intakes and Saltwater Intakes for Dry Season (Construction Phase)

Table 5.36         Predicted Metal Elevations at Selected Cooling Water Intakes and Saltwater Intakes for Wet Season (Construction Phase)

Table 6.1          Ultimate Population in Year 2016 for TKO Sewerage Catchment in Baseline Condition

Table 6.2          Proposed Changes in Population at TCS, TKL and PSK in Year 2016

Table 6.3          Ultimate Population in Year 2016 Associated with Further Development Proposed at TCS, TKL and PSK for TKO Sewerage Catchment

Table 6.4          Recommended Unit Flow Factors

Table 6.5          Ultimate ADWF in Year 2016 for TKO Sewerage Catchment

Table 6.6          Proposed Changes in ADWF at TCS, TKL and PSK in Year 2016

Table 6.7          Ultimate ADWF in Year 2016 for TKO Sewerage Catchment, with Further Development at TCS, TKL and PSK and TKO Stage 1 Landfill

Table 6.8          Recommended Peaking Factors for Sewers and PTWs

Table 6.9          Ultimate PWWF in Year 2016 at TKO PTW

Table 6.10         Ultimate PWWF in Year 2016, with Revised Flows Due to Further Development at TCS, TKL and PSK, and TKO Stage 1 Landfill, at TKO PTW

Table 6.11         TKO PTW Treatment Unit Capacities

Table 6.12         HATs Stage I Tunnel System Capacity

Table 6.13         Summary of Surcharged Sewers under Peak Flows at Baseline Condition

Table 6.14         Summary of Surcharged Sewers under 1.15 X Peak Flows at Baseline Condition

Table 6.15         Existing Sewers With Adverse Gradient

Table 6.16         Summary of Surcharged Sewers at Peak Flow under SIA Condition

Table 6.17         Summary of Surcharged Sewers At 1.15 X Peak Flow under SIA Condition

Table 6.18         Summary of Recommended Sewerage Upgrading Works

Table 6.19         Summary of Recommended Sewerage Upgrading Works

 

Table 7.1a         Ecological Value of Secondary Woodland and Mixed Woodland in the Assessment Areas

Table 7.1b         Ecological Value of Disturbed Woodland and Grassland/Shrubland in the Assessment Areas

Table 7.1c         Ecological Value of Disturbed Grassland and Plantation in the Assessment Areas

Table 7.1d         Ecological Value of Orchard And Village/Orchard in the Assessment Areas

Table 7.1e         Ecological Value of Streams in the Assessment Areas

Table 7.1f         Ecological Value of Abandoned Agriculture and Wasteland/Developed Areas in the Assessment Areas

Table 7.2          Species of Conservation Interest Recorded in the Assessment Areas

Table 7.3          Direct Habitat Loss Resulting from Proposed Works.

Table 7.4a         Overall Impact Evaluation: Secondary Woodland and Mixed Woodland

Table 7.4b         Overall Impact Evaluation: Disturbed Woodland and Grassland/ Shrubland

Table 7.4c         Overall Impact Evaluation: Disturbed Grassland and Plantation

Table 7.4d         Overall Impact Evaluation: Orchard and Village/Orchard

Table 7.4e         Overall Impact Evaluation: Streams

Table 7.4f         Overall Impact Evaluation: Abandoned Agriculture and Wasteland/ Developed Areas

Table 7.5          Summary of Potential Impacts to Species of Conservation Interest

 

Table 8.1          Composition and abundance (no. of individuals/ percentage cover per 0.25m2) of rocky shore biota at Transect 1 at the Chui Keng Wan coast on 19th May 2004 and 19th October 2004.

Table 8.2          Composition and abundance (no. of individuals/ percentage cover per 0.25m2) of rocky shore biota at Transect 2 at the Chui Keng Wan coast on 19th May 2004 and 19th October 2004.

Table 8.3          Summary of Rapid Ecological Assessment dive survey results.

Table 8.4          Summary Information on Coral Species recorded in Junk Bay

Table 8.5          Summary of benthic survey results.

Table 8.6          Composition and abundance of the soft substrata benthic community in grab samples collected from Chui Keng Wan, Junk Bay on 1 September 2004.

Table 8.7a         Ecological Value of natural rocky shore and artificial seawall habitats

Table 8.7b         Ecological Value of sandy shore habitat and hard substrata subtidal habitat

Table 8.7c         Ecological Value of soft substrata subtidal and marine mammal habitats

Table 8.8          Species of Conservation Interest within Assessment Area

Table 8.9          Overall Impact Evaluation for Rocky Shore Habitat

Table 8.10         Overall Impact Evaluation for Sandy Shore Habitat

Table 8.11         Overall Impact Evaluation for Artificial Seawall Habitat

Table 8.12         Overall Impact Evaluation for Hard Substrata Subtidal Habitat

Table 8.13         Overall Impact Evaluation for Hard Substrata Subtidal Habitat

Table 8.14         Overall Impact Evaluation for Marine Mammal Habitat

Table 9.1          Recent Hong Kong Capture Fisheries Industry Figures

Table 9.2          Recent Hong Kong Fish Culture Industry Figures

Table 10.3.1      Relationship Between Receptor Sensitivity And Impact Magnitude In Defining Impact Significance

Table 10.5.1      Comments and Responses Relating to Landscape and Visual Issues from Public Consultation Stage 1

Table 10.5.2      Comments and Responses Relating to Landscape and Visual Issues from Public Consultation Stage 2

Table 10.5.3      Comments and Responses Relating to Landscape and Visual Issues from Public Consultation Stage 3

Table 10.6.1      List of Existing Visually Sensitive Receivers (VSRs)

Table 10.6.2      List of Planned Visually Sensitive Receivers (VSRs)

Table 10.7.1.1   Proposed Construction Phase Landscape and Visual Mitigation Measures (Schedule 3 Project)

Table 10.7.1.2   Proposed Operation Phase Landscape and Visual Mitigation Measures (Schedule 3 Project)

Table 10.7.1.3   Significance of Landscape Impacts in Construction and Operation Phases for Schedule 3 Project (Adverse Impacts unless otherwise stated)

Table 10.7.2.1   Proposed Construction Phase Landscape and Visual Mitigation Measures (Western Coast Road DP1)

Table 10.7.2.2   Proposed Operation Phase Landscape and Visual Mitigation Measures (Western Coast Road DP1)

Table 10.7.2.3   Significance of Landscape Impacts in Construction and Operation Phases for Western Coast Road DP1 (Adverse Impacts unless otherwise stated)

Table 10.7.3.1   Proposed Construction Phase Landscape and Visual Mitigation Measures (Cross Bay Link DP2)

Table 10.7.3.2   Proposed Operation Phase Landscape and Visual Mitigation Measures (Cross Bay Link DP2)

Table 10.7.3.3   Significance of Landscape Impacts in Construction and Operation Phases for Cross Bay Link DP2 (Adverse Impacts unless otherwise stated)

Table 10.7.4.1   Proposed Construction Phase Landscape and Visual Mitigation Measures (Road P2 & Road D4 Flyover DP3)

Table 10.7.4.2   Proposed Operation Phase Landscape and Visual Mitigation Measures (Road P2 & Road D4 Flyover DP3)

Table 10.7.4.3   Significance of Landscape Impacts in Construction and Operation Phases for Road P2 & Road D4 Flyover DP3 (Adverse Impacts unless otherwise stated)

Table 10.8.1      Significance of Visual Impacts in the Construction and Operation Phases for Schedule 3 Project (Note: All impacts adverse unless otherwise noted)

Table 10.8.2      Significance of Visual Impacts in the Construction and Operation Phases for Western Coast Road DP1 (Note: All impacts adverse unless otherwise noted)

Table 10.8.3      Significance of Visual Impacts in the Construction and Operation Phases for Cross Bay Link DP2 (Note: All impacts adverse unless otherwise noted)

Table 10.8.4      Significance of Visual Impacts in the Construction and Operation Phases for Road P2 & Road D4 Flyover DP3 (Note: All impacts adverse unless otherwise noted)

 

Table 11.1         Sediment Quality Criteria For The Classification Of Sediment

Table 11.2         Sediment Analysis Results From Marine Ground Investigation Works Under Feasibility Study For IETKO

Table 11.3         Sediment Analysis Results From Marine Ground Investigation Works under the Project

Table 11.4         Summary of C&D Material Volumes

Table 11.5         Estimated Domestic Waste Arising (2016) in TKO Further Development

Table 11.6         Summary of Waste Handling Procedures and Disposal Routes

Table 12.1         Calculation of Methane Flux from the WCR Reclamation

Table 13.1         Proximity of Notable Buildings and Structures to the Worksites

Table 14.1         Qualitative Source-Pathway-Target Analysis Of Proposed Development In Proximity To Tseung Kwan O Stage I Landfill

Table 14.2         Qualitative Source-Pathway-Target Analysis Of Proposed Development In Proximity To Tseung Kwan O Stage II/III Landfill

Table 14.3         Qualitative Source-Pathway-Target Analysis Of Proposed Development In Proximity To Sai Tso Wan Landfill

Table 14.4         Actions In The Event Of Gas Being Detected In Excavations

Table 14.5         Actions In The Event Of Gas Being Detected During Operational Phase

Table 15.1         Traffic Flow/Road Population Close to the Proposed DGVFP Estimated in the Previous Assessment

Table 18.1         Implementation Schedule For Air Quality Control

Table 18.2         Implementation Schedule For Noise Control

Table 18.3         Implementation Schedule For Water Quality Control

Table 18.5         Implementation Schedule For Terrestrial Ecological Impact

Table 18.6         Implementation Schedule For Marine Ecological Impact

Table 18.7         Implementation Schedule For Fisheries

Table 18.8         Implementation Schedule For Landscape And Visual Impact

Table 18.9         Implementation Schedule For Waste Management Implications

Table 18.10       Implementation Schedule For Cultural Heritage

Table 18.11       Implementation Schedule For Landfill Gas Hazard