|
Figure
|
Title |
|
1.1
|
Simplified TDS Review Process (69 KB) |
|
|
|
|
4.1
|
Hong Kong¡¦s Growth Needs (232 KB) |
|
|
|
|
4.2
|
Evaluation process for TDS Preferred Options (63 KB) |
|
|
|
|
4.3
|
Process for Establishing Opportunities for Improvements to Preferred Options (45 KB) |
|
|
|
|
4.4
|
Options for Route Y (100 KB) |
|
|
|
|
4.5
|
Highway Network Assumed for Testing Refined Preferred Options, (Scenarios A and B) (159 KB) |
|
|
|
|
4.6
|
Rail Networks Assumed for Testing Refined Preferred Options, (Scenarios A and B) (161 KB) |
|
|
|
|
4.7
|
Potential Strategic Growth Areas (75 KB) |
|
|
|
|
4.8
|
Projected Daily Patronage on Major Sections of the Passenger Rail Network for Scenario A (58 KB) |
|
|
|
|
4.9
|
Projected Daily Patronage on Major Sections of the Passenger Rail Network for Scenario B (61 KB) |
|
|
|
|
4.10
|
Cross Border Goods Vehicle Flows for Scenario A 2011 Option (AM Peak Hour, 1-way Southbound) (49 KB) |
|
|
|
|
4.11
|
Cross Border Goods Vehicle Flows for Scenario B 2011 Option (AM Peak Hour, 1-way Southbound) (49 KB) |
|
|
|
|
5.1
|
Liquid Waste Forecast (Prototype Preferred Options) (91 KB) |
|
|
|
|
5.2
|
Volume/Composition of Effluent Generated Under Refined Preferred Options (110 KB) |
|
|
|
|
5.3
|
Projected Daily COD Loads By District (65 KB) |
|
|
|
|
6.1
|
Environmental Profiles ¡V Air Control Zones (74 KB) |
|
|
|
|
6.2 (a)
|
Summary of SO2 for Worst Case Industrial Scenario (56 KB) |
|
|
|
|
6.2 (b)
|
Summary of SO2 for Medium Case Industrial Scenario (49 KB) |
|
|
|
|
6.2 (c)
|
Summary of SO2 for Realistic Case Industrial Scenario (48 KB) |
|
|
|
|
6.3 (a)
|
Summary of NO2 for Traffic (with Euro I and Euro II) (43 KB) |
|
|
|
|
6.3 (b)
|
Summary of NO2 for Traffic (with Euro I and Euro II with higher penalties for smoky vehicles) (50 KB) |
|
|
|
|
6.3 (c)
|
Summary of NO2 for Traffic (with Euro I and Euro II with higher penalties for smoky vehicles and conversion of diesel to petrol engines) (51 KB) |
|
|
|
|
6.4
|
Results of Monitoring RSP at Fixed Stations (67 KB) |
|
|
|
|
6.5
|
Results of Monitoring TSP at Fixed Stations (52 KB) |
|
|
|
|
6.6
|
Variation in Vehicular Emissions with Speed (24 KB) |
|
|
|
|
6.7
|
Identification of Existing and Potential Pollution Blackspots (61 KB) |
|
|
|
|
7.1
|
Solid Waste Generated Under Prototype Preferred Options (33 KB) |
|
|
|
|
7.2
|
Solid Waste Generated Under Refined Preferred Options (33 KB) |
|
|
|
|
7.3
|
Summary of Construction Waste Arising by Sub Region (40 KB) |
|
|
|
|
7.4
|
Environmental Profiles ¡V Future Municipal Waste Disposal Strategy (78 KB) |
|
|
|
|
7.5
|
Environmental Profiles ¡V Location of Existing Waste Treatment and Disposal Facilities (62 KB) |
|
|
|
|
8.1
|
Environmental Profiles ¡V Noise Pollution (82 KB) |
|
|
|
|
9.1
|
Environmental Profiles ¡V Location of Existing Sites for Potentially Hazardous Installations (82 KB) |
|
|
|
|
10.1
|
Environmental Profiles ¡V Country Parks, Special Areas and SSSI (86 KB) |
|
|
|
|
10.2
|
Environmental Profiles ¡V Ecologically Sensitive Sites (82 KB) |
|
|
|
|
15.1
|
Environmental Profiles ¡V Topography and Wind Constraint to Development (90 KB) |
|
|
|
|
15.2
|
Environmental Profiles ¡V Air Pollution Profile (103 KB) |