Environmental Monitoring and Audit Manual

for

Proposed Low-rise and Low-density Residential Development

At Various Lots and their Adjoining Government Land

in D.D. 104, East of Kam Pok Road,

Mai Po, Yuen Long, N.T.

 

Final Report

 

 

 

 

 

Prepared by

Ramboll Environ Hong Kong Limited

 

in association with

ADI Limited

AECOM

China Point Consultants Ltd.

CKM Asia Limited

Ecosystems Ltd.

MCAAL

Vision Planning Consultants Ltd.

Westwood Hong and Associates Ltd.

 

 

Date:

August 2016

 

 

Report No.:

R2057_V6.F


Main Text

Main Text

 

 

List of Figures

Figure 1-1         Project Location Plan

Figure 2-1         Master Layout Plan of the Proposed Development and Environs

Figure 3-1         Typical Construction Phase Environmental Monitoring and Audit Procedure

Figure 4-1         Construction Phase Air Quality Monitoring Stations

Figure 5-1         Construction Phase Noise Monitoring Stations

Figure 5-2         Locations of Temporary Fixed Noise Barrier During Concurrent Construction with the Approved Cycle Track Project and Approved Public Sewerage Project

Figure 5-3         Locations of Operational Phase Noise Mitigation Measures

Figure 6-1         Construction Phase Water Quality Monitoring Stations

Figure 6-2         Proposed Drainage System for Construction Stage

Figure 6-3         Proposed Drainage System for Operation Stage 

Figure 7-1         Proposed Sewer Connection for Permanent Stage (With Sewage Pumping Station)

Figure 7-2         Proposed Sewer Connection for Interim Stage (With Sewage Treatment Plant)

Figure 9-1         Recommended Landscape Mitigation Measures ¡V Landscape Master Plan

Figure 9-2         Recommended Landscape Mitigation Measures ¡V Sections

Figure 9-3         Recommended Landscape Mitigation Measures ¡V Design of Noise Mitigation

Figure 9-4         Recommended Landscape Mitigation Measures ¡V Design of Landscape Berms

Figure 9-5         Recommended Landscape Mitigation Measures ¡V Design of Landscape Berms

Figure 9-6         Photomontages ¡V Vantage Point A

Figure 9-7         Photomontages ¡V Vantage Point A

Figure 9-8         Photomontages ¡V Vantage Point B

Figure 9-9         Photomontages ¡V Vantage Point B

Figure 9-10       Photomontages ¡V Vantage Point C

Figure 9-11       Photomontages ¡V Vantage Point C

Figure 9-12       Photomontages ¡V Vantage Point D

Figure 9-13       Photomontages ¡V Vantage Point D

Figure 9-14       Photomontages ¡V Vantage Point E

Figure 9-15       Photomontages ¡V Vantage Point E

Figure 9-16       Photomontages ¡V Vantage Point F

Figure 9-17       Photomontages ¡V Vantage Point F

Figure 9-18       Photomontages ¡V Vantage Point G

Figure 9-19       Photomontages ¡V Vantage Point G

Figure 9-20       Photomontages ¡V Vantage Point H

Figure 9-21       Photomontages ¡V Vantage Point H

Figure 9-22       Photomontages ¡V Vantage Point I

Figure 9-23       Photomontages ¡V Vantage Point I

Figure 9-24       Recommended Landscape Enhancement ¡V Provision of Landscape Pond

Figure 10-1       Location of Survey Transect to be Covered During Baseline Survey and Construction Phase Monitoring

Figure 11-1        Preliminary Site Inspection, Deficiency and Action Report System

Figure 11-2        Complaint ¡V Response Procedures

 

 

List of Appendices

Appendix I        EM&A Implementation Schedule

Appendix II       Sample EM&A Proforma and Record Forms

Appendix III       Tentative Construction Programme of the Project