Contents
1.2
Background
Information & Previous Studies
1.7 Concurrent
Projects – Construction Phase
1.8 Concurrent
Projects – Operational Phase
2
Scope of Environmental
Impact Assessment Study
3.2 Cross
Bay Link Alignment Options Considered
3.4 Consideration
of Alternative Construction Methods and Sequences of Works
3.5 Preferred
Construction Methods
4.2 Construction
Methodology for Cross Bay Link
4.3 Construction
Methodology for Road D9
5.2 Description of Existing Environment
5.3 Air
Sensitive Receivers & Pollution Sources
5.4 Potential
Concurrent Projects
5.5 Construction
Dust Assessment
5.6 Operational
Air Quality Assessment
5.7 Residual
Environmental Impacts
6.2 Description
of Existing Environment
6.3 Noise
Sensitive Receivers & Pollution Sources
6.4 Potential
Concurrent Projects
6.6 Construction
Noise Assessment
6.7 Road
Traffic Noise Assessment
6.8 Assessment of Side Effects and Constraints
6.9 Evaluation of Constraints on Planned Noise Sensitive Developments/Land Uses
6.10 Residual Environmental Impacts
7.2 Methodology
for Sediment Quality Assessment
7.3 Review
of Previous Sediment Quality Data
7.4 Sample
Collection and Laboratory Analysis
7.5 Sediment
Quality and Classification
7.6 Classification
of Sediment
8.2 Description
of Existing Environment
8.3 Water
Quality Sensitive Receivers & Pollution Sources
8.4 Potential
Concurrent Projects
8.6 Construction
Phase Assessment
8.7 Operational
Phase Assessment
9
Waste Management
Implication
9.4 Construction
Phase – Evaluation of Waste Generation
9.5 Construction
Phase – Recommended Mitigation Measures
9.7 Residual
Environmental Impacts
10.1 Legislation
and Standards
10.2 Methodology for Baseline
Establishment
10.3 Ecological
Baseline
Conditions
10.4 Evaluation
of Ecological Importance of Habitats and Species
10.6 Impact
Identification and Evaluation
10.7 Mitigations
of Adverse Impacts
11.1 Legislation
and Standards
11.2 Methodology for
Baseline Establishment
11.3 Fisheries
Baseline
Conditions
11.5 Impact Identification and Evaluation
11.6 Mitigations of Adverse Impacts
12.1 Legislation
and Standards
12.2 Legislation
and Standards
12.3 Description
of Existing Environment
12.4 Cultural
Heritage Resources
12.6 Construction
Phase Assessment
12.7 Operational
Phase Assessment
12.8 Residual
Environmental Impacts
13.2 Legislation,
Standards and Guidelines
13.4 Scope
and Content of the Study
13.6 Landscape
Impact Assessment
14.1 Legislation
and Standards
14.3 Description
of Existing Environment
14.4 Potential
Hazards and Properties of Landfill Gas
14.6 Qualitative
Risk Assessment
14.7 Precautionary
and Protective Measures
15
Environmental Monitoring
and Audit
15.3 EM&A
Manual & Implementation Schedule
15.5 Environmental
Management Plan
15.6 Construction
Method Statement
16 Summary of Environmental Outcomes
16.1 Population and Environmental Sensitive Areas Protected
16.2 Approaches Adopted to Avoid Environmental Impacts
16.3 Approaches Adopted to Minimize Environmental Impacts
16.4 Approaches Adopted to Mitigate Environmental Impacts
17.2 Construction
Descriptions
17.10 Cultural
Heritage Impact
17.12 Landscape
and Visual Impact
17.13 Environmental
Monitoring and Audit Requirement
Drawings
Drawing No. Description
Appendices