• Foundation Works
    Foundation Works

A lot of foundation works involved noisy activities, such as excavation/site formation, rock breaking and piling works. Typically, sound power levels of excavator/loader, bulldozer, excavator mounted breaker and piling machines can reach about 112 dB(A). Quieter equipment or methods are commercially available, which can significantly reduce the noise emission from the foundation works.

Sound pressure level at 7 meters from equipment

Noise reduction for some mitigation measures for reference.

Noise reduction

Quieter Construction Methods

Non-Explosive Chemical Expansion Agent

Unlike explosive chemicals or expansive compounds, soundless chemical demolition agents do not produce vibrations, and hence, they are completely quiet and safe to use.

Silent Piling by Press-in Method

Silent Piling by Press-in Method : Traditional massive augering and piling machines for sheet piling work at hard ground condition would create significant noise and vibration impacts to neighbours. 

Bursting System

Bursting system can be used for concrete breaking to replace traditional handheld percussive breakers.