Contents

Volume I          Main Text


List of Figures

(Please refer to Volume II for all the figures).

 

Figure 1-1         Site Location Plan

Figure 1-2         Locations of Approved EIA Projects and Adjacent Planned Development Sites

Figure 2-1         Master Layout Plan for the Proposed Development and the Environs

Figure 2-2         Layout of the Option 1

Figure 2-3         Layout of the Option 2

Figure 3-1         Locations of Air Sensitive Receivers

Figure 3-2         Representative ASRs Selected for Construction Phase Air Quality Assessment

Figure 3-3A       Contour Plot of Unmitigated Maximum Hourly TSP at Worst Hit Level at 5.9mPD (Southern Portion)

Figure 3-3B       Contour Plot of Unmitigated Maximum Hourly TSP at Worst Hit Level at 5.8mPD (Northern Portion)

Figure 3-4A       Contour Plot of Unmitigated 10th Highest Daily Average RSP at Worst Hit Level at 5.9mPD (Southern Portion)

Figure 3-4B       Contour Plot of Unmitigated 10th Highest Daily Average RSP at Worst Hit Level at 5.7mPD (Northern Portion)

Figure 3-5A       Contour Plot of Unmitigated Annual Average RSP at Worst Hit Level at 5.9mPD (Southern Portion)

Figure 3-5B       Contour Plot of Unmitigated Annual Average RSP at Worst Hit Level at 5.7mPD (Northern Portion)

Figure 3-6A       Contour Plot of Unmitigated 10th Highest Daily Average PM2.5 at Worst Hit Level at 5.9mPD (Southern Portion)

Figure 3-6B       Contour Plot of Unmitigated 10th Highest Daily Average PM2.5 at Worst Hit Level at 5.7mPD (Northern Portion)

Figure 3-7A       Contour Plot of Unmitigated Annual Average PM2.5 at Worst Hit Level at 5.9mPD (Southern Portion)

Figure 3-7B       Contour Plot of Unmitigated Annual Average PM2.5 at Worst Hit Level at 5.7mPD (Northern Portion)

Figure 3-8A       Contour Plot of Mitigated Maximum Hourly TSP at Worst Hit Level at 5.9mPD (Southern Portion)

Figure 3-8B       Contour Plot of Mitigated Maximum Hourly TSP at Worst Hit Level at 6.0mPD (Northern Portion)

Figure 3-9A       Contour Plot of Mitigated 10th Highest Daily Average RSP at Worst Hit Level at 5.9mPD (Southern Portion)

Figure 3-9B       Contour Plot of Mitigated 10th Highest Daily Average RSP at Worst Hit Level at 6.0mPD (Northern Portion)

Figure 3-10A     Contour Plot of Mitigated Annual Average RSP at Worst Hit Level at 5.9mPD (Southern Portion)

Figure 3-10B     Contour Plot of Mitigated Annual Average RSP at Worst Hit Level at 5.7mPD (Northern Portion)

Figure 3-11A     Contour Plot of Mitigated 10th Highest Daily Average PM2.5 at Worst Hit Level at 5.9mPD (Southern Portion)

Figure 3-11B     Contour Plot of Mitigated 10th Highest Daily Average PM2.5 at Worst Hit Level at 6.0mPD (Northern Portion)

Figure 3-12A     Contour Plot of Mitigated Annual Average PM2.5 at Worst Hit Level at 5.9mPD (Southern Portion)

Figure 3-12B     Contour Plot of Mitigated Annual Average PM2.5 at Worst Hit Level at 5.7mPD (Northern Portion)

Figure 4-1         Background Noise Measurement Location

Figure 4-2A       Representative NSRs for Construction Phase Noise Assessment

Figure 4-2B       Photographs of NSRs Selected for Construction Phase Noise Assessment

Figure 4-2C       Photographs of NSRs Selected for Construction Phase Noise Assessment

Figure 4-3A       Noise Assessment Study Boundary and Separation Distance to Major Roads

Figure 4-3B       Locations of NSRs for Operational Phase Road Traffic Noise Impact Assessment and Proposed Noise Mitigation Measures

Figure 4-4A       Locations of Identified Industrial Noise Sources and NSRs for Industrial Noise Impact Assessment

Figure 4-4B       Photographs of Identified Industrial Noise Sources for Industrial Noise Impact Assessment

Figure 4-4C       Proposed Noise Mitigation Measures to Shield Petrol Filling Station

Figure 4-5         Locations of Noise Assessment Points for Existing Floodwater Pumping Station

Figure 4-6         Location of Construction Phase Noise Barrier

Figure 4-6A       Cross Sectional Diagrame of Proposed Fixed Temporary Construction Noise Barrier

Figure 4-7         Summary of Proposed Noise Mitigation Meausres at the time of Operation of this Project

Figure 5-1         Baseline Water Quality Sampling Locations and Locations of Existing WSRs

Figure 5-2         Additional Baseline Water Quality Sampling Locations Between September 2012 and January 2013

Figure 5-3         Existing Drainage Condition

Figure 5-4         Proposed Drainage System

Figure 5-5         Construction Stage Drainage Condition

Figure 6-1         Proposed Sewer Connection

Figure 6-2         Proposed Ngau Tam Mei Trunk Sewerage

Figure 7-1         Location of Existing Petrol Filling Station at Fairview Park

Figure 7-2         Location of Existing Abandoned Water Pond Overlaid with Proposed Landscaped Pond in the Northern Portion of the Project Site

Figure 8-1         Project Site at Fairview Park and Adjacent Areas of Conservation Importance

Figure 8-2A       Habitat Map Within the Project Site and Assessment Area at Fairview Park

Figure 8-2B       Habitat Map Within the Project Site and Assessment Area at Fairview Park

Figure 8-3         Transect Walked and Sub-areas for Faunal Surveys

Figure 9-1         Pond Status Within the Assessment Area

Figure 11-01      Extract of Relevant OZP (As At 11.12.2013)

Figure 11-02A   Landscape Resources Plan (Within Project Site)

Figure 11-02B   Landscape Resources Plan (Outside Project Site)

Figure 11-03      Landscape Resource Views – On Site and Adjacent to Site (Sheet 1 of 3)

Figure 11-04      Landscape Resource Views – On Site and Adjacent to Site (Sheet 2 of 3)

Figure 11-05      Landscape Resource Views – On Site and Adjacent to Site (Sheet 3 of 3)

Figure 11-06      Landscape Character Area Plan

Figure 11-07      Landscape Character Area Views

Figure 11-08      Landscape Character Area Views

Figure 11-08A   Landscape Character Area Views

Figure 11-09      Zone of Visual Influence and Visually Sensitive Receivers

Figure 11-10      Section Showing Derivation of ZVI

Figure 11-11      Existing VSR Views (Sheet 1 of 5)

Figure 11-12      Existing VSR Views (Sheet 2 of 5)

Figure 11-13      Existing VSR Views (Sheet 3 of 5)

Figure 11-14      Existing VSR Views (Sheet 4 of 5)

Figure 11-15      Existing VSR Views (Sheet 5 of 5)

Figure 11-16      Landscape and Visual Mitigation Measures – Plan

Figure 11-17      Landscape and Visual Mitigation Measures – Southern Site Plan

Figure 11-18      Landscape and Visual Mitigation Measures – Northern Site Plan

Figure 11-19      Landscape Master Plan

Figure 11-20      Typical Section A-A (Sheet 1 of 7)

Figure 11-21      Typical Section B-B (Sheet 2 of 7)

Figure 11-22      Typical Section C-C (Sheet 3 of 7)

Figure 11-23      Typical Section D-D (Sheet 4 of 7)

Figure 11-24      Typical Section E-E (Sheet 5 of 7)

Figure 11-25      Typical Section F-F (Sheet 6 of 7)

Figure 11-26      Typical Section G-G (Sheet 7 of 7)

Figure 11-27      Residual Impacts on Landscape Resources During Construction

Figure 11-28      Residual Impacts on Landscape Resources During Operation (Day 1)

Figure 11-29      Residual Impacts on Landscape Resources During Operation (Year 10)

Figure 11-30      Residual Landscape Character Impacts During Construction

Figure 11-31      Residual Landscape Character Impacts During Operation (Day 1)

Figure 11-32      Residual Landscape Character Impacts During Operation (Year 10)

Figure 11-33      Residual Visual Impacts During Construction

Figure 11-34      Residual Visual Impacts During Operation (Year 10)

Figure 11-35      Landscape and Visual Mitigation Measure – Photomontage (Sheet 1 of 6)

Figure 11-36      Landscape and Visual Mitigation Measure – Photomontage (Sheet 2 of 6)

Figure 11-37      Landscape and Visual Mitigation Measure – Photomontage (Sheet 3 of 6)

Figure 11-38      Landscape and Visual Mitigation Measure – Photomontage (Sheet 4 of 6)

Figure 11-39      Landscape and Visual Mitigation Measure – Photomontage (Sheet 5 of 6)

Figure 11-40      Landscape and Visual Mitigation Measure – Photomontage (Sheet 6 of 6)

Figure 11-41      Visual Illustration for Proposed Noise Barrier

 


List of Appendices

 

Appendix 1-1    Project Construction Programme

Appendix 1-2    Preliminary Project Construction Programme

Appendix 1-3    Project EIA Study Brief Checklist

Appendix 3-1A  Construction Programme of the Adjacent Planned Development Projects

Appendix 3-1B Background Contribution from the PATH Output File

Appendix 3-2    Calculation of Hourly TSP Emission Rates of this Project

Appendix 3-3    Calculation of Daily and Annual RSP Emission Rates of this Project

Appendix 3-4    Summary Table of TSP Assessment Results (Unmitigated Scenario)

Appendix 3-5    Summary Table of RSP and PM2.5 Assessment Results (Unmitigated Scenario)

Appendix 3-6    Summary Table of TSP Assessment Results (Mitigated Scenario)

Appendix 3-7    Summary Table of RSP and PM2.5 Assessment Results (Mitigated Scenario)

Appendix 3-8    Phasing Construction During Site Formation Stage

Appendix 3-9    Calculation of Dust Suppression Efficiency and Annual Active Works Area

Appendix 3-10   RSP / TSP and PM2.5 / RSP Ratios

Appendix 4-1    Endorsed Traffic Forecast Data

Appendix 4-2    Road Traffic Noise Impact Assessment Results

Appendix 4-2A  Road Traffic Noise Sensitivity Test Results

Appendix 4-3    Calculation of Construction Noise Levels (Unmitigated Scenario)

Appendix 4-4    Calculation of Construction Noise Levels (Mitigated Scenario with QPMEs and Movable Noise Barriers)

Appendix 4-4A Calculation of Construction Noise Levels (Mitigated Scenario with QPMEs, movable Noise Barriers and Fixed Temporary Noise Barriers)

Appendix 4-5    Estimated Construction Noise Levels Due to Adjacent Approved EIA Projects

Appendix 4-6A  Estimated Construction Noise Levels Due to Planned RD Site

Appendix 4-6B  Estimated Construction Noise Levels Due to Planned Kam Pok Road Site

Appendix 4-7    Calculation of Industrial Noise Levels

Appendix 4-7A  Calculation of Noise Levels Due to Fixed Noise Sources at Nearby Existing Village Houses (Worst Case Scenario)

Appendix 4-7B  Calculation of Industrial Noise Levels (Worst Case Scenario) (Day-time)

Appendix 4-7C  Calculation of Industrial Noise Levels (Operational Noise Due to Warehouse and Godown During Nighttime Period)

Appendix 4-7D  Cumulative Noise Levels Due to Fixed Noise Sources, Existing and Proposed Pumping Stations

Appendix 4-7E  Operational Noise Due to a Petrol Filling Station at Fairview Park (Unmitigated)

Appendix 4-7F  Operational Noise Due to a Petrol Filling Station at Fairview Park (Mitigated)

Appendix 4-7G  Cumulative Noise Levels Due to Industrial Noise Sources and Petrol Filling Station

Appendix 4-8    Baseline Noise Measurement Results

Appendix 4-8A  Field Visit Records and Additional Night-time Noise Survey Near Industrial Sites

Appendix 4-9    Assigned Reference Number of Proposed Residential Blocks Within the Project Site

Appendix 5-1    Baseline Water Quality Survey Results Conducted in August 2009 and March 2010

Appendix 5-2    Additional Baseline Water Quality Survey Results Conducted between September 2012 and January 2013

Appendix 6-1    Hydraulic Analysis of Future Sewerage Systems

Appendix 7-1    Correspondence from FSD

Appendix 7-2    Historic Aerial Photos and Site Photographs

Appendix 7-3    Information Extracted from the Approved EIA Reports

Appendix 8-1    Plant Species recorded within Project Site

Appendix 8-2    Bird Species recorded within Project Site

Appendix 8-3    Bird Flight Line Observed

Appendix 8-4    Herpetofauna Species recorded

Appendix 8-5    Butterfly Species recorded

Appendix 8-6    Dragonfly Species recorded

Appendix 8-7    Representative Photos Showing Each Habitat Type

Appendix 10-1   Cultural Heritage Impact Assessment (CHIA) Report

Appendix 11-1   Broad Brush Tree Survey Information

Appendix 11-2   Indicative Mitigation Planting Species List