Contents
List
of Figures
(Please refer to
Volume II for all the figures).
Figure 1-2 Locations
of Approved EIA Projects and Adjacent Planned Development Sites
Figure 2-1 Master
Layout Plan for the Proposed Development and the Environs
Figure 2-2 Layout
of the Option 1
Figure 2-3 Layout
of the Option 2
Figure 3-1 Locations
of Air Sensitive Receivers
Figure 3-2 Representative
ASRs Selected for Construction Phase Air Quality Assessment
Figure 4-1 Background
Noise Measurement Location
Figure 4-2A Representative NSRs for Construction
Phase Noise Assessment
Figure 4-2B Photographs
of NSRs Selected for Construction Phase Noise Assessment
Figure 4-2C Photographs
of NSRs Selected for Construction Phase Noise Assessment
Figure 4-3A Noise
Assessment Study Boundary and Separation Distance to Major Roads
Figure 4-4C Proposed Noise Mitigation Measures to
Shield Petrol Filling Station
Figure 4-5 Locations of Noise Assessment Points
for Existing Floodwater Pumping Station
Figure 4-6 Location of Construction Phase Noise
Barrier
Figure 4-6A Cross Sectional Diagrame of Proposed
Fixed Temporary Construction Noise Barrier
Figure 4-7 Summary of
Proposed Noise Mitigation Meausres at the time of Operation of this
Project
Figure 5-1 Baseline Water Quality Sampling
Locations and Locations of Existing WSRs
Figure 5-3 Existing Drainage Condition
Figure 5-4 Proposed Drainage System
Figure 5-5 Construction Stage Drainage Condition
Figure 6-1 Proposed Sewer Connection
Figure 6-2 Proposed Ngau Tam Mei Trunk Sewerage
Figure 7-1 Location of Existing Petrol Filling
Station at Fairview Park
Figure 8-1 Project Site at Fairview Park and
Adjacent Areas of Conservation Importance
Figure 8-2A Habitat Map Within
the Project Site and Assessment Area at Fairview Park
Figure 8-2B Habitat Map Within
the Project Site and Assessment Area at Fairview Park
Figure 8-3 Transect Walked and Sub-areas for
Faunal Surveys
Figure 9-1 Pond Status Within the Assessment
Area
Figure 11-01 Extract
of Relevant OZP (As At 11.12.2013)
Figure 11-02A Landscape
Resources Plan (Within Project Site)
Figure 11-02B Landscape
Resources Plan (Outside Project Site)
Figure 11-03 Landscape
Resource Views – On Site and Adjacent to Site (Sheet 1 of 3)
Figure 11-04 Landscape
Resource Views – On Site and Adjacent to Site (Sheet 2 of 3)
Figure 11-05 Landscape
Resource Views – On Site and Adjacent to Site (Sheet 3 of 3)
Figure 11-06 Landscape
Character Area Plan
Figure 11-07 Landscape
Character Area Views
Figure 11-08 Landscape
Character Area Views
Figure 11-08A Landscape
Character Area Views
Figure 11-09 Zone
of Visual Influence and Visually Sensitive Receivers
Figure 11-10 Section
Showing Derivation of ZVI
Figure 11-11 Existing
VSR Views (Sheet 1 of 5)
Figure 11-12 Existing
VSR Views (Sheet 2 of 5)
Figure 11-13 Existing
VSR Views (Sheet 3 of 5)
Figure 11-14 Existing
VSR Views (Sheet 4 of 5)
Figure 11-15 Existing
VSR Views (Sheet 5 of 5)
Figure 11-16 Landscape
and Visual Mitigation Measures – Plan
Figure 11-17 Landscape
and Visual Mitigation Measures – Southern Site Plan
Figure 11-18 Landscape
and Visual Mitigation Measures – Northern Site Plan
Figure 11-19 Landscape
Master Plan
Figure 11-20 Typical
Section A-A (Sheet 1 of 7)
Figure 11-21 Typical
Section B-B (Sheet 2 of 7)
Figure 11-22 Typical
Section C-C (Sheet 3 of 7)
Figure 11-23 Typical
Section D-D (Sheet 4 of 7)
Figure 11-24 Typical
Section E-E (Sheet 5 of 7)
Figure 11-25 Typical
Section F-F (Sheet 6 of 7)
Figure 11-26 Typical
Section G-G (Sheet 7 of 7)
Figure 11-27 Residual
Impacts on Landscape Resources During Construction
Figure 11-28 Residual
Impacts on Landscape Resources During Operation (Day
1)
Figure 11-29 Residual
Impacts on Landscape Resources During Operation (Year
10)
Figure 11-30 Residual
Landscape Character Impacts During Construction
Figure 11-31 Residual
Landscape Character Impacts During Operation (Day 1)
Figure 11-32 Residual
Landscape Character Impacts During Operation (Year 10)
Figure 11-33 Residual
Visual Impacts During Construction
Figure 11-34 Residual
Visual Impacts During Operation (Year 10)
Figure 11-35 Landscape
and Visual Mitigation Measure – Photomontage (Sheet 1 of 6)
Figure 11-36 Landscape
and Visual Mitigation Measure – Photomontage (Sheet 2 of 6)
Figure 11-37 Landscape
and Visual Mitigation Measure – Photomontage (Sheet 3 of 6)
Figure 11-38 Landscape
and Visual Mitigation Measure – Photomontage (Sheet 4 of 6)
Figure 11-39 Landscape
and Visual Mitigation Measure – Photomontage (Sheet 5 of 6)
Figure 11-40 Landscape
and Visual Mitigation Measure – Photomontage (Sheet 6 of 6)
Figure 11-41 Visual
Illustration for Proposed Noise Barrier
List of Appendices
Appendix 1-1 Project
Construction Programme
Appendix 1-2 Preliminary
Project Construction Programme
Appendix 1-3 Project
EIA Study Brief Checklist
Appendix 3-1A Construction
Programme of the Adjacent Planned Development Projects
Appendix 3-1B Background
Contribution from the PATH Output File
Appendix 3-2 Calculation
of Hourly TSP Emission Rates of this Project
Appendix 3-3 Calculation
of Daily and Annual RSP Emission Rates of this Project
Appendix 3-4 Summary
Table of TSP Assessment Results (Unmitigated Scenario)
Appendix 3-5 Summary
Table of RSP and PM2.5 Assessment Results (Unmitigated Scenario)
Appendix 3-6 Summary
Table of TSP Assessment Results (Mitigated Scenario)
Appendix 3-7 Summary
Table of RSP and PM2.5 Assessment Results (Mitigated Scenario)
Appendix 3-8 Phasing
Construction During Site Formation Stage
Appendix 3-9 Calculation
of Dust Suppression Efficiency and Annual Active Works Area
Appendix 3-10 RSP
/ TSP and PM2.5 / RSP Ratios
Appendix 4-1 Endorsed
Traffic Forecast Data
Appendix 4-2 Road
Traffic Noise Impact Assessment Results
Appendix 4-2A Road
Traffic Noise Sensitivity Test Results
Appendix 4-3 Calculation
of Construction Noise Levels (Unmitigated Scenario)
Appendix
4-5 Estimated Construction Noise Levels
Due to Adjacent Approved EIA Projects
Appendix 4-6A Estimated
Construction Noise Levels Due to Planned RD Site
Appendix 4-6B Estimated
Construction Noise Levels Due to Planned Kam Pok Road Site
Appendix 4-7 Calculation
of Industrial Noise Levels
Appendix 4-7B Calculation
of Industrial Noise Levels (Worst Case Scenario) (Day-time)
Appendix 4-7E Operational
Noise Due to a Petrol Filling Station at Fairview Park (Unmitigated)
Appendix 4-7F Operational
Noise Due to a Petrol Filling Station at Fairview Park (Mitigated)
Appendix 4-7G Cumulative
Noise Levels Due to Industrial Noise Sources and Petrol Filling Station
Appendix 4-8 Baseline
Noise Measurement Results
Appendix 4-8A Field
Visit Records and Additional Night-time Noise Survey Near
Industrial Sites
Appendix 4-9 Assigned
Reference Number of Proposed Residential Blocks Within
the Project Site
Appendix 5-1 Baseline
Water Quality Survey Results Conducted in August 2009 and March 2010
Appendix 6-1 Hydraulic Analysis
of Future Sewerage Systems
Appendix 7-1 Correspondence
from FSD
Appendix 7-2 Historic
Aerial Photos and Site Photographs
Appendix 7-3 Information
Extracted from the Approved EIA Reports
Appendix 8-1 Plant Species recorded within Project Site
Appendix 8-2 Bird Species recorded within Project Site
Appendix 8-3 Bird Flight Line Observed
Appendix 8-4 Herpetofauna Species recorded
Appendix 8-5 Butterfly Species recorded
Appendix 8-6 Dragonfly Species recorded
Appendix
8-7 Representative Photos Showing Each
Habitat Type
Appendix 10-1 Cultural
Heritage Impact Assessment (CHIA) Report