EIA-308/2024 |
Provision of Crematorium at Wo Hop Shek Cemetery |
Food and Environmental Hygiene Department |
- Applicant was informed on 21 October 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Oct 2024 to 23 Nov 2024.
|
EIA-307/2024 |
Development of Integrated Waste Management Facilities Phase 2 (I·PARK2) |
Waste Infrastructure Division of Environmental Protection Department |
- Applicant was informed on 10 September 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Sep 2024 to 11 Oct 2024.
|
EIA-304/2024 |
Ngau Tam Mei Water Treatment Works Extension |
Water Supplies Department |
- Applicant was informed on 19 July 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Jul 2024 to 28 Aug 2024.
- Approved without conditions on 26 Sep 2024.
|
EIA-303/2023 |
Construction of Annex Block at Hong Kong Observatory Headquarters, Tsim Sha Tsui |
Hong Kong Observatory |
- Applicant was informed on 19 January 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 24 Jan 2024 to 22 Feb 2024.
- Approved without conditions on 19 Mar 2024.
|
EIA-302/2023 |
San Tin / Lok Ma Chau Development Node |
Civil Engineering and Development Department |
- Applicant was informed on 30 Jan 2024 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 Feb 2024 to 2 Mar 2024.
- Approved with conditions on 17 May 2024.
|
EIA-301/2023 |
Northern Link |
MTR Corporation Limited |
- Applicant was informed on 24 November 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Dec 2023 to 11 Jan 2024.
- Approved with conditions on 9 Feb 2024.
|
EIA-300/2023 |
Widening of Yuen Long Highway (Section between Lam Tei and Tong Yan San Tsuen) |
Highways Department |
- Applicant was informed on 20 November 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Nov 2023 to 29 Dec 2023.
- Approved without conditions on 25 Jan 2024.
|
EIA-299/2023 |
Improvement to So Kwun Po Interchange |
Civil Engineering and Development Department |
- Applicant was informed on 9 October 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Oct 2023 to 15 Nov 2023.
- Approved without conditions on 14 Dec 2023.
|
EIA-298/2023 |
Tuen Mun Bypass |
Highways Department |
- Applicant was informed on 22 September 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 6 Oct 2023 to 4 Nov 2023.
- Approved without conditions on 1 Dec 2023.
|
EIA-297/2023 |
Route 11 (Section between Yuen Long and North Lantau) |
Highways Department |
- Applicant was informed on 15 September 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Sep 2023 to 28 Oct 2023.
- Approved without conditions on 24 Nov 2023.
|
EIA-296/2023 |
Widening of Tsuen Wan Road and the associated junction improvement works |
Highways Department |
- Applicant was informed on 24 Aug 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Aug 2023 to 28 Sep 2023.
- Approved without conditions on 25 Oct 2023.
|
EIA-295/2023 |
Airport Tung Chung Link Project |
Airport Authority Hong Kong |
- Applicant was informed on 21 Aug 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 Aug 2023 to 29 Sep 2023.
Approved with conditions on 26 Oct 2023.
|
EIA-294/2023 |
Drainage Improvement Works in Mui Wo |
Drainage Services Department |
- Applicant was informed on 13 Jun 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Jun 2023 to 29 Jul 2023.
Approved without conditions on 22 Aug 2023.
|
EIA-293/2023 |
Traffic Improvement Scheme in Tuen Mun - Widening and Addition of Slip roads at Lung Fu Road / Tuen Mun Road / Wong Chu Road / Hoi Wing Road |
Highways Department |
- Applicant was informed on 12 May 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 May 2023 to 16 Jun 2023.
Approved without conditions on 23 June 2023.
|
EIA-292/2022 |
Revitalisation of Tai Wai Nullah |
Drainage Services Department |
- Applicant was informed on 15 Feb 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 21 Feb 2023 to 22 Mar 2023.
Approved without conditions on 19 Apr 2023.
|
EIA-291/2022 |
Establishment of Fish Culture Zone at Po Toi (Southeast)
|
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on
16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022.
Approved with conditions on 31 Mar 2023.
|
|
EIA-290/2022 |
Establishment of Fish Culture Zone at Mirs Bay
|
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on
16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022.
Approved with conditions on 31 Mar 2023.
|
|
EIA-289/2022 |
Establishment of Fish Culture Zone at Outer Tap Mun
|
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on
16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022.
Approved with conditions on 31 Mar 2023.
|
|
EIA-288/2022 |
Establishment of Fish Culture Zone at Wong Chuk Kok Hoi
|
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on
16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022.
Approved with conditions on 31 Mar 2023.
|
|
EIA-287/2022 |
Revitalisation of Fo Tan Nullah
|
Drainage Services Department |
- Applicant was informed on
3 Oct 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 Oct 2022 to 9 Nov 2022.
Approved without conditions on 25 Nov 2022.
|
|
EIA-286/2022 |
Upgrading of Tai Po Sewage Treatment Works
|
Drainage Services Department |
- Applicant was informed on
15 Sep 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Sep 2022 to 22 Oct 2022.
Approved without conditions on 5 Dec 2022.
|
|
EIA-285/2022 |
Improvement of Lion Rock Tunnel
|
Highways Department |
- Applicant was informed on
5 Aug 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Aug 2022 to 13 Sep 2022.
Approved with conditions on 15 Nov 2022.
|
|
EIA-284/2022 |
New Contaminated Sediment Disposal Facility to the West of Lamma Island
|
Civil Engineering and Development Department |
- Applicant was informed on
27 Jul 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Aug 2022 to 24 Sep 2022.
Approved without conditions on 21 Oct 2022.
|
|
EIA-283/2022 |
Drainage Improvement Works in Ta Kwu Ling
|
Drainage Services Department |
- Applicant was informed on
20 Jun 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jun 2022 to 26 Jul 2022.
Approved without conditions on 10 Aug 2022.
|
|
EIA-282/2022 |
Technical Study on Partial Development of Fanling Golf Course Site – Feasibility Study
|
Civil Engineering and Development Department |
- Applicant was informed on
17 May 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 May 2022 to 18 Jun 2022.
- DEP requested for information under section 8(1) of the Ordinance on 31 Aug 2022. [PDF]
- Additional information submitted under section 8.(1) of the Ordinance
[PDF]
- Approved with conditions on 11 May 2023.
|
|
EIA-281/2022 |
Hung Shui Kiu Effluent Polishing Plant
|
Drainage Services Department |
- Applicant was informed on
1 Jun 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Jun 2022 to 14 Jul 2022.
Approved with conditions on 19 Oct 2022.
|
|
EIA-280/2022 |
Cycle Track between Tsuen Wan and Tuen Mun (Tuen Mun to So Kwun Wat)
|
Civil Engineering and Development Department |
- Applicant was informed on
4 May 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 May 2022 to 18 Jun 2022.
Approved with conditions on 31 Aug 2022.
|
|
EIA-279/2022 |
Tuen Mun South Extension
|
MTR Corporation Limited |
- Applicant was informed on
26 Apr 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 May 2022 to 15 Jun 2022.
Approved without conditions on 12 Jul 2022.
|
|
EIA-278/2022 |
Yuen Long South Effluent Polishing Plant
|
Drainage Services Department |
- Applicant was informed on
25 Mar 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 6 Apr 2022 to 5 May 2022.
Approved with conditions on 25 Jul 2022.
|
|
EIA-277/2021 |
Tung Chung Line Extension
|
MTR Corporation Limited |
- Applicant was informed on
24 Jan 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Feb 2022 to 11 Mar 2022 and 23 Mar 2022 to 1 Apr 2022.
Approved with conditions on 12 Jul 2022.
|
|
EIA-276/2021 |
Re-provision of Open Cycle Gas Turbines at Lamma Power Station
|
The Hong Kong Electric Company Limited |
- Applicant was informed on
10 Dec 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 21 Dec 2021 to 19 Jan 2022.
Approved without conditions on 1 Apr 2022.
|
|
EIA-274/2021 |
Mai Po Nature Reserve Infrastructure Upgrade Project
|
World Wide Fund For Nature Hong Kong |
- Applicant was informed on
2 Nov 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Nov 2021 to 18 Dec 2021.
Approved with conditions on 16 Feb 2022.
|
|
EIA-273/2021 |
Revised Trunk Road T4 in Sha Tin
|
Civil Engineering and Development Department |
- Applicant was informed on
26 Aug 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Sep 2021 to 9 Oct 2021.
Approved without conditions on 8 Nov 2021.
|
|
EIA-271/2021 |
Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns
|
Water Supplies Department |
- Applicant was informed on
13 Jul 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jul 2021 to 25 Aug 2021.
Approved without conditions on 16 Nov 2021.
|
|
EIA-270/2021 |
Sai O Trunk Sewer Sewage Pumping Station
|
Drainage Services Department |
- Applicant was informed on
31 Mar 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Apr 2021 to 19 May 2021.
Approved without conditions on 4 June 2021.
|
|
EIA-269/2021 |
Yuen Long Barrage Scheme
|
Drainage Services Department |
- Applicant was informed on
16 Mar 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Mar 2021 to 27 Apr 2021.
Approved without conditions on 24 May 2021.
|
|
EIA-268/2020 |
Drainage Improvement Works Near Four Villages in Yuen Long - Sung Shan New Village, Tai Wo, Lin Fa Tei and Ha Che |
Drainage Services Department |
- Applicant was informed on
21 Jan 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Feb 2021 to 23 Mar 2021.
Approved with conditions on 3 June 2021.
|
|
EIA-267/2020 |
Revised Austin Road Flyover |
West Kowloon Cultural District Authority |
- Applicant was informed on
14 Dec 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Dec 2020 to 21 Jan 2021.
- Application was withdrawn by applicant on 27 Jul 2023.
|
|
EIA-266/2020 |
A Rooftop Helipad at New Acute Hospital at Kai Tak Development Area
|
Hospital Authority |
- Applicant was informed on
20 Oct 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Oct 2020 to 26 Nov 2020.
Approved without conditions on 17 Dec 2020.
|
|
EIA-265/2020 |
Pier Improvement at Tung Ping Chau
|
Civil Engineering and Development Department |
- Applicant was informed on
6 Oct 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Oct 2020 to 6 Nov 2020.
Approved with conditions on 29 December 2020.
|
|
EIA-264/2020 |
Pier Improvement at Lai Chi Wo
|
Civil Engineering and Development Department |
- Applicant was informed on
6 Oct 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Oct 2020 to 6 Nov 2020.
Approved with conditions on 29 December 2020.
|
|
EIA-263/2020 |
Development at San Hing Road and Hong Po Road, Tuen Mun
|
Civil Engineering and Development Department |
- Applicant was informed on
6 Oct 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Oct 2020 to 21 Nov 2020.
Approved with conditions on 30 December 2020.
|
|
EIA-262/2020 |
Improvement of Yuen Long Town Nullah (Town Centre Section)
|
Drainage Services Department |
- Applicant was informed on
7 Apr 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Apr 2020 to 21 May 2020.
Approved with conditions on 31 July 2020.
|
|
EIA-261/2019 |
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road
|
Highways Department |
- Applicant was informed on
31 Jan 2020 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Feb 2020 to 14 Mar 2020.
Approved with conditions on 27 May 2020.
|
|
EIA-260/2019 |
Shuen Wan Golf Course
|
Sha Lo Tung Development Company Limited |
- Applicant was informed on
28 Mar 2019 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 4 Apr 2019 to 3 May 2019.
Approved with conditions on 5 Jul 2019.
|
|
EIA-259/2018 |
Yuen Long Effluent Polishing Plant
|
Drainage Services Department |
- Applicant was informed on
19 Feb 2019 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Feb 2019 to 29 Mar 2019.
Approved with conditions on 25 Apr 2019.
|
|
EIA-258/2018 |
Lei Yue Mun Waterfront Enhancement Project
|
Civil Engineering and Development Department |
- Applicant was informed on
17 Jul 2018 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jul 2018 to 25 Aug 2018.
Approved with conditions on 26 Oct 2018.
|
|
EIA-257/2018 |
Intermodal Transfer Terminal - Bonded Vehicular Bridge and Associated Roads
|
Airport Authority Hong Kong |
- Applicant was informed on
9 Jul 2018 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Jul 2018 to 11 Aug 2018.
Approved without conditions on 23 August 2018.
|
|
EIA-256/2018 |
Hong Kong Offshore LNG Terminal
|
CLP Power Hong Kong Limited |
- Applicant was informed on
13 Jun 2018 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Jun 2018 to 14 Jul 2018.
Approved with conditions on 5 Oct 2018.
|
|
EIA-255/2018 |
Proposed Interim Sewage Treatment Plant and Effluent Reuse Facility at Wo Shang Wai, Yuen Long
|
Profit Point Enterprises Limited |
- Applicant was informed on
6 Jul 2018 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Jul 2018 to 18 Aug 2018.
Approved without conditions on 3 Sep 2018.
|
|
EIA-254/2017 |
Housing Sites in Yuen Long South
|
Civil Engineering and Development Department |
- Applicant was informed on
27 Jul 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Aug 2017 to 6 Sep 2017.
Approved with conditions on 30 Nov 2017.
|
|
EIA-253/2017 |
Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works
|
MTR Corporation Limited |
- Applicant was informed on
10 Jul 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Jul 2017 to 12 Aug 2017.
Approved with conditions on 29 Nov 2017.
|
|
EIA-252/2017 |
Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot
|
MTR Corporation Limited |
- Applicant was informed on
10 Jul 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Jul 2017 to 12 Aug 2017.
Approved with conditions on 29 Nov 2017.
|
|
EIA-251/2017 |
Improvement Dredging for Lamma Power Station Navigation Channel
|
The Hong Kong Electric Company Limited |
- Applicant was informed on
24 May 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 9 Jun 2017 to 8 Jul 2017.
Approved with conditions on 10 Oct 2017.
|
|
EIA-250/2017 |
Mui Wo Lai Chi Yuen Cemetery Extension
|
Food and Environmental Hygiene Department |
- Applicant was informed on
24 Mar 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Apr 2017 to 17 May 2017.
Approved without conditions on 15 Jun 2017.
|
|
EIA-249/2016 |
A Rooftop Helipad at the Proposed New Block of Queen Mary Hospital
|
Food and Health Bureau |
- Applicant was informed on
18 Jan 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 3 Feb 2017 to 4 Mar 2017.
Approved without conditions on 22 Mar 2017.
|
EIA-246/2016 |
Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works
|
Drainage Services Department |
- Applicant was informed on
25 Aug 2016 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Nov 2016 to 17 Dec
2016.
- Approved with condition on 24 Apr 2017.
|
EIA-243/2016 |
Outlying Islands Sewerage Stage 2 - Upgrading of Tai O Sewage Collection, Treatment and Disposal Facilities
|
Drainage Services Department |
- Applicant was informed on
19 Aug 2016 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2016 to 28 Dec
2016.
- Approved with condition on 29 Mar 2017.
|
EIA-149/2008 |
Proposed Development at Fung Lok Wai, Yuen Long at Lot 1457 R.P. in D.D.123
|
Mutual Luck Investment Limited
|
- Applicant was informed on 14 Jul 2008 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Aug 2008 to 6 Sep 2008.
- Approved with conditions
on 27 Nov 2009.
|
EIA-148/2008 |
Harbour Area Treatment Scheme (HATS) Stage 2A
|
Drainage Services Department
|
- Applicant was informed on 18 June 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Aug 2008 to 10 Sep 2008.
- Approved without conditions on 30 Oct 2008.
|
EIA-147/2008 |
West Island Line |
MTR Corporation Limited |
- Applicant was informed on 7 May 2008 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 May 2008 to 14 Jun 2008.
- Application was withdrawn by applicant on 19 Jun 2008.
|
EIA-146/2008 |
Provision of Cremators at Wo
Hop Shek Crematorium
|
Food and Environmental Hygiene Department |
- Applicant was informed on 9 Apr 2008 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 May 2008 to 31 May 2008.
- Approved without conditions on 24 Jun 2008.
|
EIA-145/2008 |
Upgrading of Pillar Point
Sewage Treatment Works
|
Drainage Services Department |
- Applicant was informed on 3 Apr 2008 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Apr 2008 to 13 May 2008.
- Approved without conditions on 10 Jun 2008.
|
EIA-144/2008 |
Proposed Comprehensive
Development at Wo Shang Wai, Yuen Long
|
Profit Point Enterprises Limited |
- Applicant was informed on 26 Mar 2008 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Apr 2008 to 13 May 2008.
- Approved with conditions
on 31 Jul 2008.
|
EIA-143/2007 |
South East New Territories (SENT) Landfill
Extension
|
Environmental
Protection Department |
- Applicant was informed on 31 Jan 2008 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Feb 2008 to 26 Mar 2008.
- Approved with conditions
on 6 May 2008.
|
EIA-142/2007 |
Provision of Additional
Interchange connecting Tuen Mun Road and Castle Peak Road near Sam Shing Estate
and Widening of Tuen Mun Road at Tsing Tin Interchange
|
Highways
Department |
- Applicant was informed on
11 Dec 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Dec 2007 to 12 Jan
2008.
- Approved without conditions on 23 Jan 2008.
|
EIA-141/2007 |
Wan Chai Development Phase II
and Central-Wan Chai Bypass
|
Civil Engineering and Development Department |
- Applicant was informed on 17 Dec 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Dec 2007 to 18 Jan
2008.
- Approved with conditions
on 11 Dec 2008.
|
EIA-140/2007 |
Development of a Bathing
Beach at Lung Mei, Tai Po
|
Civil Engineering and Development Department |
- Applicant was informed on 12 Nov 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Nov 2007 to 22 Dec 2007.
- Approved with conditions
on 21 Nov 2008.
|
EIA-139/2007 |
Decommissioning of the Former
Kai Tak Airport Other than the North Apron
|
Civil Engineering and Development Department |
- Applicant was informed on 12 Oct 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2007 to 16 Nov
2007.
- Approved with conditions
on 19 Dec 2007.
|
EIA-138/2007 |
Dredging Works for Proposed
Cruise Terminal at Kai Tak
|
Civil Engineering and Development Department |
- Applicant was informed on 12 Oct 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2007 to 16 Nov
2007.
- Approved without conditions on 19 Dec 2007.
|
EIA-135/2007 |
Agreement No. CE 28/2004(GE) Landslide Preventive Works at Po Shan,
Mid-levels-Design and Construction (Natural Terrain Risk Mitigation Works)
|
Geotechnical
Engineering Office, Civil Engineering and Development Department |
- Applicant was informed on 15 Aug 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Aug 2007 to 26
Sep 200 7.
- Approved with conditions
on 22 Oct 2007.
|
EIA-134/2007 |
Harbour Area Treatment Scheme (HATS) - Provision of
Disinfection Facilities at Stonecutters Island Sewage Treatment Works
|
Drainage
Services Department |
- Applicant was informed on 19 Jul 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 Aug 2007 to 14
Sep 200 7.
- Approved with conditions
on 8 Nov 2007.
|
EIA-133/2007 |
North East New Territories (NENT) Landfill
Extension
|
Environmental Protection Department |
- Applicant was informed on 1 Jun 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Jun 2007 to 24 Jul 200 7.
- Approved with conditions
on 20 Sep 2007.
|
EIA-131/2007 |
Laying of Western Cross
Harbour Main and Associated Land Mains from West Kowloon to Sai Ying Pun
|
Water
Supplies Department |
- Applicant was informed on 25 May 2007 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 4 Jun 2007 to 3 Jul 2007.
- Approved without conditions on 31 Jul 2007. |
EIA-130/2007 |
Drainage
Improvement in Sha Tin and Tai Po
|
Drainage Services Department |
- Applicant was informed on 8 May 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 May 2007 to 15 Jun 200 7.
- Approved with conditions
on 9 Aug 2007. |
EIA-128/2007 |
Drainage Improvement in Northern
New Territories - Package C
|
Drainage Services Department |
- Applicant was informed on 25 Apr 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 3 May 2007 to 1 Jun 2007.
- Approved without conditions on 9 Jul 2007. |
EIA-127/2006 |
Permanent Aviation Fuel Facility for Hong Kong International Airport
|
Airport Authority Hong Kong |
- Applicant was informed on 16 Feb 2007 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Feb 2007 to 24 Mar 200 7.
- Approved with conditions
on 30 May 2007. |
EIA-126/2006 |
Relocation
of Yiu Lian Floating Dock No. 3
|
Yiu Lian
Dockyards Limited |
- Applicant was informed on 19 Dec 2006 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Dec 2006 to 27 Jan 200 7.
- Approved with conditions
on 23 Feb 2007. |
EIA-125/2006 |
Liquefied
Natural Gas (LNG) Receiving Terminal and Associated Facilities
|
Castle Peak
Power Company Limited |
- Applicant was informed on 15 Dec 2006 of the
suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Dec 2006 to 25 Jan 200 7.
- Approved with conditions
on 3 Apr 2007. |
EIA-124/2006 |
A Commercial Scale Wind Turbine Pilot Demonstration at Hei Ling Chau
|
Castle Peak
Power Company Limited |
- Applicant was informed on 1 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 14 Dec 2006 to 12 Jan 200 7.
- Approved with conditions
on 12
Mar 2007. |
EIA-123/2006 |
Emissions Control Project at Castle Peak Power Station "B" Units
|
Castle Peak
Power Company Limited |
- Applicant was informed on 15 Aug 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 19 Aug 2006 to 17 Sep 2006.
- Approved without conditions on 25 Oct 2006.
|
EIA-122/2006 |
Yuen Long, Kam
Tin, Ngau Tam Mei & Tin Shui Wai Drainage Improvement Stage 1, Phase 2B - Kam
Tin Secondary Drainage Channel KT13
|
Drainage
Services Department |
- Applicant was informed on 2 Aug 2006
of the suitability of the report for public inspection.
-
Report was exhibited for public to comment from 22 Aug 2006 to 20 Sep 2006.
- Approved without conditions on 24 Oct 2006.
|
EIA-121/2006 |
Repositioning and Long Term Operation Plan of Ocean Park
|
Ocean Park Corporation |
- Applicant was informed on 29 May 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 1 Jun 2006 to 30 Jun 2006.
- Approved without conditions on 12 Jul 2006. |
EIA-120/2006 |
Hong Kong Convention and Exhibition Centre, Atrium Link Extension
|
Hong Kong Trade Development Council |
- Applicant was informed on 17 Mar 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Mar 2006 to 16 Apr 2006.
- Approved without conditions on 21 Apr 2006. |
EIA-119/2005 |
Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project
|
The Hong Kong Electric Co. Ltd. |
- Applicant was informed on 13 Feb 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Feb 2006 to 18 Mar 2006.
- Approved without conditions on 24 Mar 2006. |
EIA-118/2005 |
Main Arena of the 2008 Olympic Equestrian Event
|
The Hong Kong Jockey Club |
- Applicant was informed on 25 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jan 2006 to 25 Feb 2006.
- Approved without conditions on 24 Mar 2006. |
EIA-116/2005 |
Proposed Karting Track in D.D.134, Lung Kwu Sheung Tan, Tuen Mun
|
HGH Limited
|
- Applicant was informed on 25 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 Jan 2006 to 25 Feb 2006.
- Approved without conditions on 2 Mar 2006.
|
EIA-115/2005 |
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel |
Drainage Services Department
|
- Applicant was informed on 26 Jan 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Feb 2006 to 14 Mar 2006.
- Approved without conditions on 7 Apr 2006. |
EIA-114/2005 |
Helipad at Yung Shue Wan, Lamma Island
|
Civil Engineering and Development Department
|
- Applicant was informed on 14 Nov 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Nov 2005 to 22 Dec 2005.
|
EIA-113/2005 |
Expansion of Heliport Facilities at Macau Ferry Terminal
|
Civil Aviation Department, the Government of the HKSAR
|
- Applicant was informed on 28 Oct 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 1 Nov 2005 to 30 Nov 2005.
- Approved with conditions on 8 Feb 2006. |
EIA-112/2005 |
Proposed Extension of Public Golf Course at Kau Sai Chau Island, Sai Kung
|
The Hong Kong Jockey Club
|
- Applicant was informed on 1 Sep 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 6 Sep 2005 to 5 Oct 2005.
- Approved without conditions on 14 Nov 2005.
|
EIA-111/2005 |
Further Development of Tseung Kwan O Feasibility Study
|
Civil Engineering and Development Department
|
- Applicant was informed on 30 Sep 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Oct 2005 to 13 Nov 2005.
- Approved without conditions on 8 Dec2005. |
EIA-110/2005 |
Drainage Improvements in Southern Lantau
|
Drainage Services Department |
- Applicant was informed on 15 Sep 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Sep 2005 to 25 Oct 2005.
- Approved without conditions on 5 Dec 2005. |
EIA-109/2005 |
Road P1 Advance Works at Yam O on Lantau Island
|
Civil Engineering and Development Department
|
- Applicant was informed on 30 June 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 July 2005 to 9 August 2005.
- Approved without conditions on 6 Sep 2005. |
EIA-108/2005 |
Drainage Improvement in Tsuen Wan, Kwai Chung and Tsing Yi, Tsuen Wan Drainage Tunnel
|
Drainage Services Department
|
- Applicant was informed on 23 June 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 2 July 2005 to 31 July 2005.
- Approved without conditions on 29 Aug 2005. |
EIA-107/2005 |
Peng Chau Helipad
|
Civil Engineering and Development Department
|
- Applicant was informed on 23 June 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 July 2005 to 9 August 2005.
- Approved without conditions on 25 Aug 2005. |
EIA-106/2005 |
New Contaminated Mud Marine Disposal Facility at Airport East / East Sha Chau Area
|
Civil Engineering and Development Department |
- Applicant was informed on 19 May 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 May 2005 to 25 June 2005.
- Approved without conditions on 1 Sep 2005. |
EIA-104/2005 |
Development of an EcoPark in Tuen Mun Area 38
|
Environmental Protection Department |
- Applicant was informed on 27 April 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 April 2005 to 28 May 2005.
- Approved without conditions on 29 June 2005. |
EIA-103/2004 |
Trunk Road T4 in Sha Tin
|
Civil Engineering and Development Department |
- Applicant was informed on 25 Feb 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 March 2005 to 6 April 2005.
- Approved without conditions on 3 May 2005. |
EIA-101/2004 |
Drainage Improvements in Sai Kung
|
Drainage Services Department |
- Applicant was informed on 16 Feb 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 1 March 2005 to 30 March 2005.
- Approved with conditions on 20 Apr 2005. |
EIA-100/2004 |
Siu Ho Wan Water Treatment Works Extension
|
Water Supplies Department |
- Applicant was informed on 15 Oct 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Oct 2004 to 23 Nov 2004.
- Approved without conditions on 15 Dec 2004. |
EIA-099/2004 |
Renewable Energy by a Wind Turbine System on Lamma Island
|
The Hongkong Electric Co. Ltd. |
- Applicant was informed on 6 Sep 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Sept 2004 to 9 Oct 2004.
- Approved without conditions on 27 Oct 2004. |
EIA-098/2004 |
Kowloon Southern Link
|
Kowloon-Canton Railway Corporation
|
- Applicant was informed on 7 Sep 2004 of the suitability of the report for public inspection..
- Report was exhibited for public to comment from 18 Jan 2005 to 16 Feb 2005.
- Approved with conditions on 30 Mar 2005. |
EIA-097/2004 |
Tai Po Sewage Treatment Works Stage V
|
Drainage Services Department |
- Applicant was informed on 26 Aug 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 03 Sept 2004 to 02 Oct 2004. .
- Approved without conditions on 28 Oct 2004. |
EIA-096/2004 |
Peng Chau Sewage Treatment Works Upgrade
|
Drainage Services Department |
- Applicant was informed on 24 Aug 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 01 Sept 2004 to 30 Sept 2004.
- Approved without conditions on 29 Oct 2004. |
EIA-094/2004 |
Yuen Long and Kam Tin Sewerage and Sewage Disposal Stage 2
|
Drainage Services Department |
- Applicant was informed on 17 Mar 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Apr 2004 to 22 May 2004.
- Approved without conditions on 17 Jun 2004. |
EIA-093/2004 |
Improvements to San Tin Interchange
|
Highways Department |
- Applicant was informed on 1 Mar 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Mar 2004 to 7 Apr 2004.
- Approved without conditions on 3 May 2004. |
EIA-092/2003 |
Reprovisioning of Diamond Hill Crematorium
|
Architectural Services Department |
- Applicant was informed on 5 Jan 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Jan 2004 to 10 Feb 2004.
- Approved with conditions on 30 Mar 2004. |
EIA-091/2003 |
Outlying Islands Sewerage Stage 1, Phase II Package J - Sok Kwu Wan Sewage Collection, Treatment & Disposal Facilities
|
Drainage Services Department |
- Applicant was informed on 23 Jun 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Aug 2003 to 20 Sep 2003.
- Approved with conditions on 25 Oct 2003. |
EIA-090/2003 |
Tung Chung - Ngong Ping Cable Car Project
|
MTR Corporation Limited |
- Applicant was informed on 27 Mar 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Mar 2003 to 27 Apr 2003.
- Approved with conditions on 9 Jun 2003. |
EIA-089/2003 |
The Proposed Submarine Gas Pipelines from Cheng Tou Jiao Liquefied Natural Gas Receiving Terminal, Shenzhen to Tai Po Gas Production Plant, Hong Kong
|
The Hong Kong and China Gas Company Limited |
- Applicant was informed on 27 Feb 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 5 Mar 2003 to 3 Apr 2003.
- Approved without conditions on 23 Apr 2003. |
EIA-088/2002 |
Lamma Power Station Navigation Channel Improvement
|
The Hongkong Electric Co., Ltd. |
- Applicant was informed on 18 Jan 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Jan 2003 to 23 Feb 2003.
- Approved without conditions on 11 Mar 2003. |
EIA-087/2002 |
Cement Silos addition work in Tai Po Cement Depot
|
K.WAH MATERIALS LTD. |
- Applicant was informed on 14 Jan 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Jan 2003 to 15 Feb 2003.
- Approved with conditions on 13 May 2003. |
EIA-086/2002 |
Upgrading and expansion of San Wai Sewage Treatement Works and expansion of Ha Tsuen Pumping Station
|
Drainage Services Department |
- Applicant was informed on 23 Dec 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Feb 2003 to 26 Mar 2003.
- Approved without conditions on 12 May 2003. |
EIA-085/2002 |
Proposed Joint User Complex and Wholesale Fish Market at Area 44, Tuen Mun
|
Architectural Services Department |
- Applicant was informed on 30 Oct 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 19 Nov 2002 to 18 Dec 2002.
- Approved with conditions on 14 Mar 2003. |
EIA-083/2002 |
Feasibility Study for Housing Development at Whitehead & Lee On in Man On Shan
|
Territory Development Department |
- Applicant was informed on 18 Oct 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 Oct 2002 to 29 Nov 2002.
- Approved without conditions on 18 Dec 2002. |
EIA-082/2002 |
Shenzhen Western Corridor
|
Highways Department |
- Applicant was informed on 9 Sep 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 Sep 2002 to 10 Oct 2002.
- Approved with conditions on 4 Nov 2002. |
EIA-081/2002 |
Construction of Lung Kwu Chau Jetty
|
Civil Engineering Department |
- Applicant was informed on 19 Sep 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Sep 2002 to 27 Oct 2002.
- Approved with conditions on 1 Nov 2002. |
EIA-079/2002 |
Ngong Ping Sewage Treatment Works and Sewerage
|
Drainage Services Department |
- Applicant was informed on 29 Aug 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Aug 2002 to 28 Sep 2002.
- Approved without conditions on 12 Nov 2002. |
EIA-078/2002 |
Deep Bay Link
|
Highways Department |
- Applicant was informed on 10 Jul 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Jul 2002 to 21 Aug 2002.
- Approved with conditions on 13 Sep 2002. |
EIA-077/2002 |
Permanent Aviation Fuel Facility for Hong Kong International Airport
|
Airport Authority Hong Kong |
The Court of Final Appeal ordered on 17 Jul 2006 that
the decision of the Director made on 2 Aug 2002 approving the EIA report be
quashed. |
EIA-076/2002 |
Fill Bank at Tseung Kwan O Area 137
|
Civil Engineering Department |
- Applicant was informed on 8 May 2002 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 May 2002 to 14 Jun 2002.
- Approved without conditions on 27 Jun 2002. |
EIA-075/2002 |
Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha
|
Highways Department |
- Applicant was informed on 7 May 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 May 2002 to 12 Jun 2002.
- Approved with conditions on 4 Jul 2002. |
EIA-074/2002 |
Yuen Long and Kam Tin Sewerage and Sewage Disposal Stage 1 Packages 1A-1T and 1B-1T - Kam Tin Trunk Sewerage Phase I and II
|
Drainage Services Department |
- Applicant was informed on 7 May 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Jun 2002 to 10 Jul 2002.
- Approved with conditions on 26 Aug 2002. |
EIA-073/2001 |
Yau Tong Bay Development - Engineering Feasibility Study for the Comprehensive Development at Yau Tong Bay
|
Maunsell Consultants Asia Ltd |
- Applicant was informed on 15 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 1 Feb 2002 to 2 Mar 2002.
- Approved with conditions on 8 Apr 2002. |
EIA-072/2001 |
Decommissioning of Cheoy Lee Shipyard at Penny's Bay
|
Civil Engineering Department |
- Applicant was informed on 9 Feb 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 21 Feb 2002 to 22 Mar 2002.
- Approved without conditions on 24 Apr 2002. |
EIA-071/2001 |
Sheung Shui to Lok Ma Chau Spur Line
|
Kowloon-Canton Railway Corporation |
- Applicant was informed on 2 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 7 Jan 2002 to 5 Feb 2002.
- Approved with conditions on 11 Mar 2002. |
EIA-069/2001 |
Reclamation of Yau Tong Bay
|
Maunsell Consultants Asia Limited |
- Applicant was informed on 15 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 1 Feb 2002 to 2 Mar 2002.
- Approved with conditions on 8 Apr 2002. |
EIA-068/2001 |
Planning and Engineering Feasibility Study for Sham Tseng Development
|
Civil Engineering Department |
- Applicant was informed on 10 Jan 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 25 Jan 2002 to 23 Feb 2002.
- Approved with conditions on 2 May 2002. |
EIA-067/2001 |
Widening of Yuen Long Highway between Lam Tei and Shap Pat Heung Interchange
|
Highways Department |
- Applicant was informed on 14 Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 3 Jan 2002 to 1 Feb 2002.
- Approved with conditions on 22 May 2002. |
EIA-066/2001 |
The Decommissioning of Underground Fuel Tanks at Tsuen Wan No.1 Pumping Station
|
Water Supplies Department |
- Applicant was informed on 13 Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 22 Dec 2001 to 20 Jan 2002.
- Approved with conditions on 9 Feb 2002. |
EIA-065/2001 |
132 KV Supply Circuit from Pui O via Chi Ma Wan Peninsula via Sea Crossing towards Cheung Chau
|
CLP Power Hong Kong Limited |
- Applicant was informed on 14 Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 3 Jan 2002 to 1 Feb 2002.
- Approved with conditions on 28 Feb 2002. |
EIA-064/2001 |
Demolition of Buildings and Structures in the Proposed Kennedy Town Comprehensive Development Area Site
|
Civil Engineering Department |
- Applicant was informed on 20 Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 7 Dec 2001 to 5 Jan 2002.
- Approved with conditions on 16 Apr 2002. |
EIA-063/2001 |
Replacement of Cremators at Fu Shan Crematorium
|
Architectural Services Department |
- Applicant was informed on 9 Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 24 Nov 2001 to 23 Dec 2001.
- Approved with conditions on 4 Jan 2002. |
EIA-062/2001 |
Demolition of Kwai Chung Incineration Plant
|
Civil Engineering Department |
- Applicant was informed on 13 Nov 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 20 Nov 2001 to 19 Dec 2001.
- Approved with conditions on 9 Jan 2002. |
EIA-061/2001 |
Tseung Kwan O Roads D1, D8 and D10
|
Territory Development Department |
- Applicant was informed on 11 Oct 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Oct 2001 to 16 Nov 2001.
- Approved with conditions on 23 Nov 2001. |
EIA-060/2001 |
Proposed Headquarters and Bus Maintenance Depot in Chai Wan
|
Citybus Limited |
- Applicant was informed on 11 Aug 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 16 Aug 2001 to 14 Sep 2001.
- Approved with conditions on 26 Sep 2001. |
EIA-059/2001 |
Comprehensive Feasibility Study for The Revised Scheme of South East Kowloon Development
|
Territory Development Department |
- Applicant was informed on 30 Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 July 2001 to 29 Aug 2001.
- Approved with conditions on 25 Sep 2001. |
EIA-058/2001 |
Wanchai Development phase II
|
Territory Development Department |
- Applicant was informed on 7 Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 July 2001 to 15 Aug 2001.
- Approved with conditions on 31 Aug 2001. |
EIA-057/2001 |
Central - Wan Chai Bypass and Island Eastern Corridor Link
|
Highways Department |
- Applicant was informed on 7 Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 July 2001 to 15 Aug 2001.
- Approved with conditions on 31 Aug 2001. |
EIA-056/2001 |
Lei Yue Mun Road Underpass, Modification at Junction with Yau Tong Road and Associated Improvement Works - Feasibility Study
|
Highways Department |
- Applicant was informed on 6 Aug 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 28 Sep 2001 to 27 Oct 2001.
- Approved with conditions on 21 Feb 2002. |
EIA-055/2001 |
Central Reclamation Phase III - Studies, Site Investigation, Design and Construction
|
Territory Development Department |
- Applicant was informed on 7 Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 July 2001 to 15 Aug 2001.
- Approved with conditions on 31 Aug 2001. |
EIA-054/2001 |
Improvement to Castle Peak Road between Ka Loon Tsuen and Siu Lam
|
Highways Department |
- Applicant was informed on 31 Jul 2001 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Aug 2001 to 15 Sep 2001.
- Approved with conditions on 5 Dec 2001. |
EIA-053/2001 |
Modifications to MTRC Tsim Sha Tsui Station
|
MTR Corporation Limited |
- Applicant was informed on 12 Jul 2001 of the suitability of the report for public inspection.
- Report was informed for public to comment from 20 July 2001 to 18 Aug 2001.
- Approved with conditions on 12 Sep 2001. |
EIA-049/2000 |
West Kowloon Reclamation Contract No. WK30-Remaining Roadworks Stage 4, Link Roads G & L
|
Kowloon Development Office, Territory Development Department |
- Applicant was informed on 31 Oct 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Nov 2000 to 14 Dec 2000.
- Approved with conditions on 10 Jan 2001. |
EIA-047/2000 |
Proposed RMC Concrete Batching Plant at Telegraph Bay for Cyber-Port Development
|
Cyber-Port Limited |
- Applicant was informed on 21 Oct 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Nov 2000 to 13 Dec 2000.
- Approved with conditions on 15 Jan 2001. |
EIA-044/2000 |
Sheung Shui to Lok Ma Chau Spur Line - Environmental Impact Assessment
|
Kowloon-Canton Railway Corporation |
- Applicant was informed on 7 June 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 12 June 2000 to 11 July 2000.
- The ACE EIA sub-committee and ACE were consulted on 27 June, 6 July, 11 July and 17 July 2000.
- Applicant was informed on 16 October 2000 that the report was rejected. (reasons) |
EIA-043/2000 |
Agreement No. CE 73/98 Investigation Assignment for Widening of Tolo Highway/Fanling Highway between Island House Interchange and Fanling - Environmental Impact Assessment
|
Highways Department |
- Applicant was informed on 17 May 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 May 2000 to 24 Jun 2000.
- Approved with conditions on 14 Jul 2000. |
EIA-042/2000 |
Tai O Sheltered Boat Anchorage - Environmental & Drainage Impact Assessment - Environmental Impact Assessment
|
Civil Engineering Department |
- Applicant was informed on 08 May 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 24 May 2000 to 22 Jun 2000.
- Approved with conditions on 12 Jul 2000. |
EIA-041/2000 |
Construction of an International Theme Park in Penny's Bay of North Lantau together with its Essential Associated Infrastructures - Environmental Impact Assessment
|
Civil Engineering Department |
- Applicant was informed on 11 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Mar 2000 to 11 Apr 2000.
- The ACE EIA sub-committee and ACE were consulted on 5 Apr, 10 Apr and 17 Apr 2000.
- Approved with conditions on 28 Apr 2000. |
EIA-040/2000 |
Northshore Lantau Development Feasibility Study - Environmental Impact Assessment
|
Civil Engineering Department |
- Applicant was informed on 11 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Mar 2000 to 11 Apr 2000.
- The ACE EIA sub-committee and ACE were consulted on 5 Apr, 10 Apr and 17 Apr 2000.
- Approved with conditions on 28 Apr 2000. |
EIA-039/2000 |
Shenzhen River Regulation Project Stage III - Environmental Impact Assessment
|
Drainage Services Department |
- Applicant was informed on 27 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Apr 2000 to 10 May 2000.
- Approved with conditions on 8 Jun 2000. |
EIA-038/2000 |
Tuen Mun Sewerage - Eastern coastal Sewerage Extension - Environmental Impact Assessment
|
Drainage Services Department |
- Applicant was informed on 27 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Apr 2000 to 12 May 2000.
- Approved with conditions on 7 June 2000. |
EIA-036/1999 |
East Rail - Extension - Hung Hom To Tsim Sha Tsui - Environmental Impact Assessment
|
Kowloon-Canton Railway Corporation |
- Applicant was informed on 27 Jan 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Feb 2000 to 23 Mar 2000.
- Approved with conditions on 24 May 2000. |
EIA-034/1999 |
New World First Bus Permanent Depot at Chai Wan
|
New World First Bus Services Limited |
- Applicant was informed on 09 Dec 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 11 Dec 1999 to 12 Jan 2000.
- Approved with conditions on 25 Jan 2000. |
EIA-033/1999 |
Route 10 North Lantau to Yuen Long Highway Investigation and Preliminary Design (Southern Section)
|
Highways Department |
- Applicant was informed on 23 Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Nov 1999 to 29 Dec 1999.
- Approved with conditions on 02 Feb 2000. |
EIA-031/1999 |
Light Rail Transit (LRT) Extension in Tin Shui Wai Reserve Zone and Grade Separation of the LRT with Pui To Road and Tsing Lung Road in Tuen Mun
|
Kowloon-Canton Railway Corporation |
- Applicant was informed on 18 Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 Nov 1999 to 25 Dec 1999.
- Approved with conditions on 06 Jan 2000. |
EIA-030/1999 |
Tin Shui Wai Phase 4 Rail Extension
|
Kowloon-Canton Railway Corporation |
- Applicant was informed on 18 Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 26 Nov 1999 to 25 Dec 1999.
- Approved with conditions on 06 Jan 2000. |
EIA-029/1999 |
132 kV Overhead Pole Line & Underground Cable from the Existing Po Lam Substation to the Existing Tui Min Hoi Substation - Circuit No.2
|
CLP Power Hong Kong Limited |
- Applicant was informed on 28 Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 05 Nov 1999 to 04 Dec 1999.
- Approved with conditions on 22 Dec 1999. |
EIA-028/1999 |
Hebe Haven Yacht Club Development - Phase 2 Environmental Impact Assessment Study
|
Halcrow China Limited |
- Applicant was informed on 28 Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Nov 1999 to 14 Dec 1999.
- Approved with conditions on 03 Jan 2000. |
EIA-027/1999 |
East Rail Extensions - Tai Wai to Ma On Shan
|
Kowloon-Canton Railway Corporation |
- Applicant was informed on 19 Oct 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 20 Oct 1999 to 18 Nov 1999.
- Approved with conditions on 15 Jan 2000. |
EIA-026/1999 |
Essential Public Infrastructure Works with West Rail Stations (the Eastern Access Road)
|
Kowloon-Canton Railway Corporation |
- Applicant was informed on 30 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 02 Oct 1999 to 31 Oct 1999.
- Approved with conditions on 28 Dec 1999. |
EIA-025/1999 |
Route 9 between Tsing Yi and Cheung Sha Wan
|
Major Works Project Management Office, Highways Department |
- Applicant was informed on 13 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 23 Aug 1999 to 21 Sep 1999.
- Approved with conditions on 19 Oct 1999. |
EIA-024/1999 |
Widening and Reconstruction of Tai Po Road (Sha Tin Section)
|
Major Works Project Management Office, Highways Department |
- Applicant was informed on 09 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 15 Sep 1999 to 14 Oct 1999.
- Approved with conditions on 19 Nov 1999. |
EIA-023/1999 |
Tseung Kwan O Development - Contract F: Grade Separated Interchange T1/P1/P2
|
N.T. East Development Office, Territory Development Department |
- Applicant was informed on 31 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Sep 1999 to 13 Oct 1999.
- Approved with conditions on 20 Oct 1999. |
EIA-022/1999 |
Sha Tin Sewage Treatment Works, Stage III Extension - Environmental Impact Assessment Study
|
Drainage Services Department |
- Applicant was informed on 03 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 17 Sep 1999 to 16 Oct 1999.
- Approved with conditions on 05 Nov 1999. |
EIA-021/1999 |
Feasibility Study on the Alternative Alignment for the Western Coast Road, Tseung Kwan O
|
N.T. East Development Office, Territory Development Department |
- Applicant was informed on 01 Sep 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Sep 1999 to 13 Oct 1999.
- Approved with conditions on 20 Oct 1999. |
EIA-020/1999 |
Route 16 Investigation Assignment from West Kowloon to Sha Tin - Alternative Alignment Environmental Impact Assessment
|
Major Works Project Management Office, Highways Department |
- Applicant was informed on 30 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 03 Sep 1999 to 02 Oct 1999.
- Approved with conditions on 05 Nov 1999. |
EIA-018/1999 |
Sai Sha Road Widening between Kam Ying Road and proposed Road T7 Junction
|
Highways Department |
- Applicant was informed on 13 Aug 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 27 Aug 1999 to 25 Sep 1999.
- Approved with conditions on 19 Oct 1999. |
EIA-017/1999 |
Essential Public Infrastructure Works associated with West Rail Stations in Yuen Long Tin Shui Wai and Tuen Mun Centre
|
Kowloon-Canton Railway Corporation |
- Applicant was informed on 22 June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 25 Jun 1999 to 24 Jul 1999.
- Approved with conditions on 20 Aug 1999. |
EIA-016/1999 |
EIA for Salisbury Road Underpass and Associated Road Improvement Works (including Middle Road Circulation System)
|
Highways Department |
- Applicant was informed on 21 Jun 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Jun 1999 to 29 Jul 1999.
- Approved with conditions on 26 Aug 1999. |
EIA-015/1999 |
Planning and Development Study of Potential Housing Site in Area 54, Tuen Mun
|
N.T. West Development Office, Territory Development Department |
- Applicant was informed on 24 June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 09 Jul 1999 to 08 Aug 1999.
- Approved with conditions on 03 Sep 1999. |
EIA-014/1999 |
Main Drainage Channels and Poldered Village Protection Schemes for San Tin, NWNT EIA Study
|
N.T. North Development Office, Territory Development Department |
- Applicant was informed on 04 June 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 Jun 1999 to 13 Jul 1999.
- Approved with conditions on 14 Sep 1999. |
EIA-013/1999 |
Tang Lung Chau Dangerous Goods Anchorage
|
N.T. West Development Office, Territory Development Department |
- Applicant was informed on 20 May 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 01 Jun 1999 to 30 Jun 1999.
- Approved with conditions on 17 Jul 1999. |
EIA-011/1999 |
Infrastructural Works for the Proposed Development at Telegraph Bay - Engineering Feasibility Study
|
Information Technology and Broadcasting Bureau of the Government for the Hong Kong Special Administrative Region Department |
- Applicant was informed on 09 Mar 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 12 Mar 1999 to 10 Apr 1999.
- Approved with conditions on 26 Apr 1999. |
EIA-009/1998 |
1,800 MW Gas-fired Power Station at Lamma Extension
|
The Hongkong Electric Co., Ltd. |
- Applicant was informed on 19 Feb 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 05 Mar 1999 to 03 Apr 1999.
- Approved with conditions on 05 May 1999. |
EIA-008/1998 |
Planning and Engineering Feasibility Study for Development near Choi Wan Road and Jordan Valley
|
Civil Engineering Department |
- Applicant was informed on 09 Feb 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 12 Feb 1999 to 15 Mar 1999.
- Approved with conditions on 20 Apr 1999. |
EIA-007/1998 |
Footbridge and Improvement to Ap Lei Chau Bridge Road and Ap Lei Chau Drive
|
Highways Department |
- Applicant was informed on 04 Jan 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 08 Jan 1999 to 06 Feb 1999.
- Approved with conditions on 24 Feb 1999. |
EIA-006/1998 |
Dredging an Area of Kellett Bank for Reprovisioning of Six Government Mooring Buoys
|
Civil Engineering Department |
- Applicant was informed on 28 Nov 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 10 Dec 1998 to 8 Jan 1999.
- Approved without conditions on 01 Mar 1999. |
EIA-005/1998 |
Planning and Engineering Feasibility Study for Development at Anderson Road
|
Civil Engineering Department |
- Applicant was informed on 04 Dec 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 10 Dec 1998 to 08 Jan 1999.
- Approved with conditions on 02 Mar 1999. |
EIA-004/1998 |
Yuen Long Bypass Floodway - Feasibility Study
|
Territory Development Department |
- Applicant was informed on 31 Jul 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 14 Aug 1998 to 12 Sep 1998.
- Approved without conditions on 10 Oct 1998. |
EIA-003/1998 |
Kai Tak Airport North Apron Decomissioning
|
Territory Development Department |
- Applicant was informed on 25 Jun 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 03 Jul 1998 to 02 Aug 1998.
- Approved with conditions on 04 Sep 1998. |
EIA-002/1998 |
Tsuen Wan Bay Further Reclamation, Area 35, Tsuen Wan Engineering, Planning and Environmental Investigation
|
N.T. West Development Office, Territory Development Department |
- Applicant was informed on 15 Jun 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 25 Sep 1998 to 24 Oct 1998.
- Approved with conditions on 24 Nov 1998. |
EIA-001/1998 |
Pak Shek Kok Development
|
Maunsell Consultants Asia Ltd. |
- Applicant was informed on 15 Jun 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 19 Jun 1998 to 18 Jul 1998.
- Approved with conditions on 10 Aug 1998. |