LIST
OF TABLES
Table 2.1 Scale
of Proposed Project
Table 2.2 Tentative
Construction Schedule
Table 2.3 Evaluation
of Cumulative Impacts due to Concurrent Projects
Table 3.1 Proposed
Discharge Standard of Yuen Long Effluent Polishing Plant
Table 3.2 Water
Sampling Results
Table 3.3 Impacts
on Existing Sewerage System
Table 4.1 Hong
Kong Air Quality Objectives
Table 4.2 Identified
Representative Air Sensitive Receivers
Table 4.3 5-year Averaged Annual Background
Concentration of Air Pollutants recorded at Yuen Long Station by EPD for the
Period of 2013-2017
Table 5.1 EIAO-TM Day-time Construction Noise
Standards
Table 5.2 Area Sensitivity Ratings
Table 5.3 Acceptable Noise Levels (ANLs) for
General Construction Works to be carried out during Restricted Hours (GW-TM)
Table 5.4 ANLs for Fixed Noise Source under NCO
Table 5.5 Noise Criteria for Fixed Plant Noise
under EIAO
Table 5.6 Measured Baseline Noise Levels
Table 5.7 Representative Noise Sensitive
Receivers (NSRs)
Table 5.8 Predicted
Construction Noise Levels (Without Mitigation Measures)
Table 5.9 Predicted
Fixed Plant Noise Levels due to the Proposed DWF Pumping Station
Table 5.10 Sound Power Level of Quiet PME
Table 5.11 Predicted Construction Noise Levels (With
Mitigation Measures)
Table 5.12 Predicted Cumulative Construction Noise
Levels
Table 5.13 Predicted Cumulative Fixed Plant Noise
Levels
Table 6.1 Key Water Quality Objectives of the
Deep Bay WCZ for Yuen Long & Kam Tin (Upper) Subzone and Yuen Long &
Kam Tin (Lower) Subzone
Table 6.2 Summary of River Water Quality
Monitoring Data collected by EPD River Water Quality Monitoring Programme for Stations in YLTN, MN and SHN (2018)
Table 6.3 Summary of River Water Quality
Monitoring Data collected by EPD River Water Quality Monitoring Programme for Stations in Kam Tin River (2018)
Table 6.4 Water Sampling
Results
Table 6.5 Monthly Mean BOD5 and SS Levels
recorded for the Treated Effluent from YLSTW from January 2009 to December 2018
Table 6.6 Identified
Water Quality Sensitive Receivers (WSRs)
Table 6.7 Anticipated
Improvement to Water Quality in YLTN
Table 7.1 Government Facilities for Disposal of
C&D Materials
Table 7.2 Estimated Quantities of C&D Materials
generated, reused and disposed during Construction
Table 7.3 Review of Historical Aerial
Photographs
Table 8.1 Ecological
Survey Programme
Table 8.2 Mammal
Species of Conservation Importance in or near the Study Area in Previous
Studies
Table 8.3 Bird
Species of Conservation Importance Recorded in Shan Pui River and/or Nam Sang
Wai in Previous Studies
Table 8.4 Habitats
Present within the Project Site and the 500m Study Area
Table 8.5 List
of Bird Species of Conservation Importance Recorded during the Survey Period
Table 8.6 List
of Butterfly Species of Conservation Importance Recorded during the Survey
Period
Table 8.7 List
of Intertidal/Benthic Fauna Species Recorded in September 2019
Table 8.8
Results of Intertidal/Benthic Fauna Survey conducted in September 2019
Table 8.9 Habitat
Evaluation for Yuen Long Town Nullah
Table 8.10 Habitat
Evaluation for Shan Pui River and Minor Channelised
Watercourse
Table 8.11 Habitat
Evaluation for old Kam Tin River
Table 8.12 Habitat
Evaluation for Pond
Table 8.13 Habitat
Evaluation for Tidal Marsh and Mangrove
Table 8.14 Habitat
Evaluation for Reedbed
Table 8.15 Habitat
Evaluation for Shrubland
Table 8.16 Habitat
Evaluation for Agricultural Land
Table 8.17 Habitat
Evaluation for Plantation
Table 8.18 Habitat
Evaluation for Developed Area
Table 8.19 Evaluation
for Floral Species of Conservation Importance
Table 8.20 Evaluation
for Faunal Species of Conservation Importance
Table 8.21 Evaluation
of Ecological Impact of Habitat Loss
Table 8.22 Evaluation
of Ecological Impacts on Sites of Conservation Importance
Table 8.23 Evaluation
of Ecological Impacts on Species of Conservation Importance
Table 9.1 Zoning
Types and Areas affected by the Project
Table 9.2 Impact
Significance of Landscape or Visual Impact
Table 9.3 Landscape
Resources Identified within Assessment Area
Table 9.4 Sensitivity
of Landscape Resources
Table 9.5
Surveyed Tree Species and Quantity within the Project Boundary
Table 9.6 Landscape
Character Areas Identified within Assessment Area
Table 9.7 Sensitivity
of Landscape Character Area
Table 9.8 Magnitude
of Landscape Impact on LRs
Table 9.9 Magnitude
of Landscape Impact on LCAs
Table 9.10 Significance
of Landscape Impacts on LRs
Table 9.11 Significance
of Landscape Impacts on LCAs
Table 9.12 Representative
Visually Sensitive Receivers in the Vicinity of the Site
Table 9.13 Magnitude
of Visual Impact
Table 9.14 Significance
Thresholds of Visual Impacts
Table 9.15 Proposed
Mitigation Measures for Construction Phase
Table 9.16 Proposed
Mitigation Measures for Operation Phase
Table 10.1 Summary of EM&A Requirements
LIST
OF FIGURES
Figure 1.1 General Location Plan of the Project
Figure 2.1 General Layout Plan
Figure 2.2 Schematic Diagram for Dry Weather Flow
Interception System
Figure 2.3 Nullah Cross Section
Figure 2.4 Locations of Concurrent Projects
Figure 4.1 Representative Air Sensitive Receivers
Figure 5.1a-e Representative Noise Sensitive Receivers
Figure 5.2 Representative Noise Sensitive Receivers
(Operation Phase)
Figure 6.1 Location of Yuen Long Town Nullah
Figure 6.2 Water Quality Sensitive Receivers
Figure 6.3 Sewage Treatment Process Flowchart of the Yuen Long Sewage Treatment
Works
Figure 6.4 Discharge Point of Existing Low-flow
Pumping Station
Figure 8.1 Recognized Sites of Conservation
Importance
Figure 8.2 Habitat Map with Indicative Locations of
Non-bird Species of Conservation Importance Recorded
Figure 8.3 Watercourses Identified within the Study
Area
Figure 9.1 Review of the Planning and Development
Control Framework
Figure 9.2 Existing Landscape Resources
Figure 9.3 Existing Landscape Character Areas
Figure 9.4 Visual Envelope and Representative
Visual Sensitive Receivers
Figure 9.5 Representative Photos taken along the
Project Alignment
Figure 9.6 Vantage Points
Figure 9.7a DWF Pumping Station Elevation View 1
Figure 9.7b DWF Pumping Station Elevation View 2
Figure 9.7c DWF Pumping Station Elevation View 3
Figure 9.8a Photomontage for Vantage Point T1
Figure 9.8b Photomontage for Vantage Point T2
Figure 9.8c Photomontage for Vantage Point T3
Figure 9.9 Landscape Mitigation Plan
ANNEXES
Annex 2A Proposed Layout Plan
Annex 2B General Layout Plan for the Proposed DWF Pumping Station
Annex 5A Background Noise Monitoring Data
Annex 5B Photos of Representative Noise Sensitive
Receivers
Annex 5C Noise Impact Assessment – Improvement of Yuen Long Town Nullah Project
Annex 7A Historical Aerial Photos
Annex 7B Representative Photos showing the Existing Site Conditions
Annex 7C Correspondences with Government Departments
Annex 8A Floral Species Recorded within the Project Site and Study Area
Annex 8B Faunal Species Recorded within the Project Site and the Study Area
Annex 8C Representative Photographs of Habitats and Species of Conservation Importance Recorded within the Study Area
Annex 9A Broad-Brush Tree Survey Results
Annex 9B Potential OVTs
Annex 9C Existing View of the Representative Visual Sensitive Receivers
Annex 10A Implementation Schedule of Environmental Protection Measures for the Project