List of Figures

Figure No.

Title

Figure 1.1

Project Location Plan

Figure 1.2

Locations of Designated Projects

Figure 2.1

Recommended Outline Development Plan

Figure 2.2

Road Network of the Project

Figure 2.3

General Layout of New District Distributor Roads

Figure 2.4

Location Plan of Designated Project 2 (DP2) - Revitalisation of Ngau Tam Mei Drainage Channel and River Diversion Works

Figure 2.5

Locations of Major Concurrent Projects

Figure 3.1

Locations of Concerned PATH Grids

Figure 3.2

Locations of Representative Air Sensitive Receivers (Key Plan)

Figure 3.2.1

Locations of Representative Air Sensitive Receivers (Sheet 1 of 6)

Figure 3.2.2

Locations of Representative Air Sensitive Receivers (Sheet 2 of 6)

Figure 3.2.3

Locations of Representative Air Sensitive Receivers (Sheet 3 of 6)

Figure 3.2.4

Locations of Representative Air Sensitive Receivers (Sheet 4 of 6)

Figure 3.2.5

Locations of Representative Air Sensitive Receivers (Sheet 5 of 6)

Figure 3.2.6

Locations of Representative Air Sensitive Receivers (Sheet 6 of 6)

Figure 3.3

Locations of Industrial Emission Sources

Figure 3.4

Locations of Odour Emission Sources

Figure 3.5

Contour of Predicted 19th Highest 1-hour Average NO2 Concentration (µg/m3) at 1.5mAG

Figure 3.6

Contour of Predicted 10th Highest 24-hour Average NO2 Concentration (µg/m3) at 1.5mAG

Figure 3.7

Contour of Predicted Annual Average NO2 Concentration (µg/m3) at 1.5mAG

Figure 3.8

Contour of Predicted 10th Highest 24-hour Average RSP Concentration (µg/m3) at 1.5mAG

Figure 3.9

Contour of Predicted Annual Average RSP Concentration (µg/m3) at 1.5mAG

Figure 3.10

Contour of Predicted 19th Highest 24-hour Average FSP Concentration (µg/m3) at 1.5mAG

Figure 3.11

Contour of Predicted Annual Average FSP Concentration (µg/m3) at 1.5mAG

Figure 3.12

Contour of Predicted 4th Highest 10-minute Average SO2 Concentration (µg/m3) at 1.5mAG

Figure 3.13

Contour of Predicted 4th Highest 24-hour Average SO2 Concentration (µg/m3) at 1.5mAG

Figure 3.14

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 1.5mAG (Unmitigated)

Figure 3.15

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 5mAG (Unmitigated)

Figure 3.16

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 10mAG (Unmitigated)

Figure 3.17

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 15mAG (Unmitigated)

Figure 3.18

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 20mAG (Unmitigated)

Figure 3.19

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 25mAG (Unmitigated)

Figure 3.20

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 30mAG (Unmitigated)

Figure 3.21

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 35mAG (Unmitigated)

Figure 3.22

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 40mAG (Unmitigated)

Figure 3.23

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 45mAG (Unmitigated)

Figure 3.24

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 50mAG (Unmitigated)

Figure 3.25

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 55mAG (Unmitigated)

Figure 3.26

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 1.5mAG (Mitigated)

Figure 3.27

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 5mAG (Mitigated)

Figure 3.28

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 10mAG (Mitigated)

Figure 3.29

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 15mAG (Mitigated)

Figure 3.30

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 20mAG (Mitigated)

Figure 3.31

Contour of Predicted 5-Second Average Odour Concentration (OU/m3) at 25mAG (Mitigated)

Figure 4.1a

Assessment Area for Noise Impact Assessment and Locations of Noise Sensitive Receivers

Figure 4.1b

Uses of Planned Building Structures within Development Area

Figure 4.2

Locations of Noise Assessment Points for Construction Noise Impact Assessment (Key Plan)

Figure 4.2.1

Locations of Noise Assessment Points for Construction Noise Impact Assessment (Sheet 1 of 3)

Figure 4.2.2

Locations of Noise Assessment Points for Construction Noise Impact Assessment (Sheet 2 of 3)

Figure 4.2.3

Locations of Noise Assessment Points for Construction Noise Impact Assessment (Sheet 3 of 3)

Figure 4.3

Locations of Noise Assessment Points for Road Traffic Noise Impact Assessment (Residential Premises and Educational Institutions) (Key Plan)

Figure 4.3.1

Locations of Noise Assessment Points for Road Traffic Noise Impact Assessment (Residential Premises and Educational Institutions) (Sheet 1 of 5)

Figure 4.3.2

Locations of Noise Assessment Points for Road Traffic Noise Impact Assessment (Residential Premises and Educational Institutions) (Sheet 2 of 5)

Figure 4.3.3

Locations of Noise Assessment Points for Road Traffic Noise Impact Assessment (Residential Premises and Educational Institutions) (Sheet 3 of 5)

Figure 4.3.4

Locations of Noise Assessment Points for Road Traffic Noise Impact Assessment (Residential Premises and Educational Institutions) (Sheet 4 of 5)

Figure 4.3.5

Locations of Noise Assessment Points for Road Traffic Noise Impact Assessment (Residential Premises and Educational Institutions) (Sheet 5 of 5)

Figure 4.4

Locations of Noise Assessment Points for Road Traffic Noise Impact Assessment (Proposed Kindergartens)

Figure 4.5

Locations of Noise Assessment Points for Road Traffic Noise Impact Assessment (Proposed Social Welfare Facilities)

Figure 4.6

Locations of Noise Assessment Points for Fixed Noise Sources Impact Assessment

Figure 4.7

Locations of Noise Assessment Points for Rail Noise Impact Assessment

Figure 4.8

Roads Sections for Road Traffic Noise Impact Assessment

Figure 4.9

Locations of Existing, Planned and Proposed Traffic Noise Mitigation Measures (Key Plan)

Figure 4.9.1

Locations of Existing, Planned and Proposed Traffic Noise Mitigation Measures (Sheet 1 of 5)

Figure 4.9.2

Locations of Existing, Planned and Proposed Traffic Noise Mitigation Measures (Sheet 2 of 5)

Figure 4.9.3

Locations of Existing, Planned and Proposed Traffic Noise Mitigation Measures (Sheet 3 of 5)

Figure 4.9.4

Locations of Existing, Planned and Proposed Traffic Noise Mitigation Measures (Sheet 4 of 5)

Figure 4.9.5

Locations of Existing, Planned and Proposed Traffic Noise Mitigation Measures (Sheet 5 of 5)

Figure 5.1

Locations of Water Sensitive Receivers (Key Plan)

Figure 5.1.1

Locations of Water Sensitive Receivers (Key Plan) (Sheet 1 of 6)

Figure 5.1.2

Locations of Water Sensitive Receivers (Key Plan) (Sheet 2 of 6)

Figure 5.1.3

Locations of Water Sensitive Receivers (Key Plan) (Sheet 3 of 6)

Figure 5.1.4

Locations of Water Sensitive Receivers (Key Plan) (Sheet 4 of 6)

Figure 5.1.5

Locations of Water Sensitive Receivers (Key Plan) (Sheet 5 of 6)

Figure 5.1.6

Locations of Water Sensitive Receivers (Key Plan) (Sheet 6 of 6)

Figure 5.2

Locations of EPD Water Quality Monitoring Stations

Figure 5.3

Locations of Flood Retention Facilities

Figure 5.4

Location of Sewage Pumping Station and Indicative Emergency Bypass Alignment

Figure 8.0

Land Contamination Assessment Areas Under Previous EIA Studies

Figure 8.1

Locations of Potentially Contaminated Sites and Sites with Suspected Industrial Land Uses / Operations (Key Plan)

Figure 8.2

Locations of Potentially Contaminated Sites and Sites with Suspected Industrial Land Uses / Operations (Sheet 1 of 6)

Figure 8.3

Locations of Potentially Contaminated Sites and Sites with Suspected Industrial Land Uses / Operations (Sheet 2 of 6)

Figure 8.4

Locations of Potentially Contaminated Sites and Sites with Suspected Industrial Land Uses / Operations (Sheet 3 of 6)

Figure 8.5

Locations of Potentially Contaminated Sites and Sites with Suspected Industrial Land Uses / Operations (Sheet 4 of 6)

Figure 8.6

Locations of Potentially Contaminated Sites and Sites with Suspected Industrial Land Uses / Operations (Sheet 5 of 6)

Figure 8.7

Locations of Potentially Contaminated Sites and Sites with Suspected Industrial Land Uses / Operations (Sheet 6 of 6)

Figure 9.1

Ecological Survey Locations

Figure 9.2

Assessment Area for Ecology, Sites of Conservation Importance and Other Ecologically Sensitive Resources / Areas

Figure 9.3

Locations of Species of Conservation Importance from Literature Review (Key Plan)

Figure 9.3.1

Locations of Species of Conservation Importance from Literature Review (Sheet 1 of 6)

Figure 9.3.2

Locations of Species of Conservation Importance from Literature Review (Sheet 2 of 6)

Figure 9.3.3

Locations of Species of Conservation Importance from Literature Review (Sheet 3 of 6)

Figure 9.3.4

Locations of Species of Conservation Importance from Literature Review (Sheet 4 of 6)

Figure 9.3.5

Locations of Species of Conservation Importance from Literature Review (Sheet 5 of 6)

Figure 9.3.6

Locations of Species of Conservation Importance from Literature Review (Sheet 6 of 6)

Figure 9.4

Habitat Map and Locations of Species of Conservation Importance from Recent Survey (Key Plan)

Figure 9.4.1

Habitat Map and Locations of Species of Conservation Importance from Recent Survey (Sheet 1 of 7)

Figure 9.4.2

Habitat Map and Locations of Species of Conservation Importance from Recent Survey (Sheet 2 of 7)

Figure 9.4.3

Habitat Map and Locations of Species of Conservation Importance from Recent Survey (Sheet 3 of 7)

Figure 9.4.4

Habitat Map and Locations of Species of Conservation Importance from Recent Survey (Sheet 4 of 7)

Figure 9.4.5

Habitat Map and Locations of Species of Conservation Importance from Recent Survey (Sheet 5 of 7)

Figure 9.4.6

Habitat Map and Locations of Species of Conservation Importance from Recent Survey (Sheet 6 of 7)

Figure 9.4.7

Habitat Map and Locations of Species of Conservation Importance from Recent Survey (Sheet 7 of 7)

Figure 9.5

Flight Lines of Ardeids and Other Waterbirds

Figure 9.6

Habitat Map Overlaid with Recommended Outline Development Plan

Figure 9.7

Potential Location for Wetland Compensation

Figure 9.8

Potential Location of Wildlife Corridor Design

Figure 10.1

Locations of Fishponds within Assessment Area (Key Plan)

Figure 10.1.1

Locations of Fishponds within Assessment Area (Sheet 1 of 4)

Figure 10.1.2

Locations of Fishponds within Assessment Area (Sheet 2 of 4)

Figure 10.1.3

Locations of Fishponds within Assessment Area (Sheet 3 of 4)

Figure 10.1.4

Locations of Fishponds within Assessment Area (Sheet 4 of 4)

Figure 11.1

Project Location Plan and Landscape Impact Assessment Area

Figure 11.2

Landscape Resources Plan

Figure 11.3.1

Landscape Resource Photos

Figure 11.3.2

Landscape Resource Photos

Figure 11.3.3

Landscape Resource Photos

Figure 11.4

Landscape Resource Impact Plan

Figure 11.5

Landscape Character Area Plan

Figure 11.6

Landscape Character Area Photos

Figure 11.7

Landscape Character Area Impact Plan

Figure 11.8

Visual Envelope and Locations of Viewpoints

Figure 11.9.1

Landscape and Visual Mitigation Measures Plan (Key Plan)

Figure 11.9.2

Landscape and Visual Mitigation Measures Blow Up Plan (Sheet 1 of 4)

Figure 11.9.3

Landscape and Visual Mitigation Measures Blow Up Plan (Sheet 1 of 4)

Figure 11.9.4

Landscape and Visual Mitigation Measures Blow Up Plan (Sheet 1 of 4)

Figure 11.9.5

Landscape and Visual Mitigation Measures Blow Up Plan (Sheet 1 of 4)

Figure 11.10

Photomontage Viewpoint 1

Figure 11.11

Photomontage Viewpoint 2

Figure 11.12

Photomontage Viewpoint 3

Figure 11.13

Photomontage Viewpoint 4

Figure 11.14

Photomontage Viewpoint 5A

Figure 11.15

Photomontage Viewpoint 5B

Figure 11.16

Photomontage Viewpoint 6

Figure 11.17

Photomontage Viewpoint 7

Figure 12.1

Project Site Boundary and Assessment Area for Cultural Heritage Impact Assessment

Figure 12.2

Geological Map of Assessment Area

Figure 12.3

1963 Aerial Photo

Figure 12.4

1982 Aerial Photo

Figure 12.5

Previous Archaeological Works Conducted within Assessment Area

Figure 12.6.1

Assessed Archaeological Potential Area Prior to this Study (1)

Figure 12.6.2

Assessed Archaeological Potential Area Prior to this Study (2)

Figure 12.6.3

Assessed Archaeological Potential Area Prior to this Study (3)

Figure 12.6.4

Assessed Archaeological Potential Area Prior to this Study (4)

Figure 12.7

Locations of Built Heritage and Other Identified Items (Key Plan)

Figure 12.7.1

Locations of Built Heritage and Other Identified Items (Sheet 1 of 12)

Figure 12.7.2

Locations of Built Heritage and Other Identified Items (Sheet 2 of 12)

Figure 12.7.3

Locations of Built Heritage and Other Identified Items (Sheet 3 of 12)

Figure 12.7.4

Locations of Built Heritage and Other Identified Items (Sheet 4 of 12)

Figure 12.7.5

Locations of Built Heritage and Other Identified Items (Sheet 5 of 12)

Figure 12.7.6

Locations of Built Heritage and Other Identified Items (Sheet 6 of 12)

Figure 12.7.7

Locations of Built Heritage and Other Identified Items (Sheet 7 of 12)

Figure 12.7.8

Locations of Built Heritage and Other Identified Items (Sheet 8 of 12)

Figure 12.7.9

Locations of Built Heritage and Other Identified Items (Sheet 9 of 12)

Figure 12.7.10

Locations of Built Heritage and Other Identified Items (Sheet 10 of 12)

Figure 12.7.11

Locations of Built Heritage and Other Identified Items (Sheet 11 of 12)

Figure 12.7.12

Locations of Built Heritage and Other Identified Items (Sheet 12 of 12)

Figure 12.8

Locations of Other Identified Items in Relations to RODP

Figure 12.9

Further Review of Past Disturbance that Affect Archaeological Potential Assessment

Figure 12.10

Overall Evaluated Archaeological Potential of Assessment Area

Figure 12.11

Mitigation Measures for Archaeological Heritage

Figure 12.12

Geological Map Overlay with Moderate-Low and High Archaeological Potential Areas within Project Site Requiring Mitigation Measures

Figure 14.1

Location of Ngau Tam Mei Landfill and Project Site Boundary

Figure 14.2

Geological Map in the Vicinity of Ngau Tam Mei Landfill

Figure 14.3

Locations of Landfill Gas and Groundwater Monitoring Wells at Ngau Tam Mei Landfill

Figure 15.1

Location of 400kV Overhead Cables