Contents
1.5 Further EIA Study for the Schedule 2 DPs
1.8 Structure of this EIA Report
2 SCOPE OF ENVIRONMENTAL
IMPACT ASSESSMENT STUDY
3.1 General Description of the Project
3.3 Recommended Outline Development Plan
3.5 Nature, Benefit and Scope of the Project
3.8 Concurrent Projects and Evaluation of Potential Cumulative Impacts
4.2 Description of Existing Environment
4.3 Study Area &Air Sensitive Receivers
4.5 Potential Concurrent Projects/ Sources
4.6 Assessment Methodology 4-37
4.7 Construction Dust Assessment
4.8 Operational Air Quality Assessment
4.10 Environmental Acceptability of Schedule 2
Designated Projects
5.2 Description of Existing Environment
5.3 Study Area & Noise Sensitive Receivers
5.4 Potential Concurrent Projects
5.5 Assessment Methodology 5-11
5.6 Construction Noise Assessment
5.7 Road Traffic Noise Assessment
5.8 Fixed
Plant Noise Assessment
5.9 Assessment of Side Effects and Constraints
5.10 Evaluation of Constraints on Planned Noise
Sensitive Developments/ Land Uses
5.12 Environmental Acceptability of Schedule 2
Designated Projects
6.2 Description of Existing Environment
6.3 Water Quality Sensitive Receivers & Pollution Sources
6.4 Potential Concurrent Projects
6.5 Assessment Methodology 6-9
6.6 Construction Phase Assessment
6.7 Operational Phase Assessment
6.9 Environmental Acceptability of Schedule 2 Designated Projects
7 SEWERAGE AND SEWAGE
TREATMENT IMPLICATION
7.2 Description of Existing Environment
7.3 Sewage Estimation and Assessment Methodology
7.4 Evaluation of Impact on Sewage Treatment Works
7.5 Evaluation of Impact on Sewerage System and Mitigation Measures
7.6 Environmental Acceptability of Schedule 2 Designated Projects
8 WASTE MANAGEMENT
IMPLICATION
8.1 Environmental
Legislation, Standards and Guidelines
8.2 Description of the Environment
8.3 Assessment Methodology 8-4
8.4 Identification
and Evaluation of Waste Management Implications
8.6 Residual Environmental Impacts
8.7 Environmental Acceptability of Schedule 2 Designated Projects
9.1 Environmental
Legislation and Guidelines
9.2 Assessment Methodology 9-6
9.3 Description of the Environment
9.5 Potentially
Contaminated Area
9.7 Environmental Acceptability of Schedule 2 Designated Projects
10.1 Legislation and Standards
10.4 Ecological Baseline Conditions
10.5 Evaluation of Ecological Importance of Habitats and
10.6 Potential Ecological Impacts of the Proposed
10.7 Mitigation Measures Adopted to Avoid, Minimise and
Compensate for Ecological Impacts
10.8 Precautionary measures for herpetofauna
10.10 Environmental Acceptability of Schedule 2
Designated Projects
11 LANDSCAPE AND VISUAL
IMPACTS
11.1 Legislation
and Standards
11.3 Scope and Content of the Study
11.4 Review
of Planning and Development Control Framework
11.9 Landscape Resources and Landscape Character Areas
11.11 Visually
Sensitive Receivers (VSRs)
11.12 Landscape
Impact Assessment
11.13 Visual
Impact Assessment
11.15 Magnitude
Of Visual Impacts
11.16 Prediction
of Significance of Visual Impacts
11.17 Environmental Acceptability of Schedule 2
Designated Projects
12 ENVIRONMENTAL
MONITORING AND AUDIT
12.4 Project Implementation
Schedule
13 SUMMARY OF ENVIRONMENTAL
OUTCOMES
13.1 Population
and Environmental Areas Protected
13.2 Environmental
Friendly Design and Benefits
13.3 Summary
of the Measures taken for the Avoidance and Minimisation of Environmental
Impacts
14.5 Sewerage and Sewage Treatment Implication
14.6 Waste Management Implication
14.9 Landscape and Visual Impacts
14.10 Environmental Monitoring and Audit Requirement
FIGURES
1 INTRODUCTION
227724/E/0001 Location of Project
227724/E/0002 Locations of Designated Projects
3 PROJECT
DESCRIPTION
227724/E/0003 Recommended Outline Development Plan
227724/E/0004 Plan of Road L4 of ARQ
227724/E/0005 Plan of Access Road Leading to Po Lam Road
227724/E/0006 Location of Deleted Drainage Retention Tank
227724/E/0007 Plan of Proposed Sewerage Layout
227724/E/0008 Locations of Concurrent Projects
4 AIR
QUALITY IMPACT
227724/E/1010 Locations
of Air Sensitive Receivers (Sheet 1 of 4)
227724/E/1020 Locations
of Air Sensitive Receivers (Sheet 2 of 4)
227724/E/1030 Locations
of Air Sensitive Receivers (Sheet 3 of 4)
227724/E/1040 Locations
of Air Sensitive Receivers (Sheet 4 of 4)
227724/E/1050 Locations
of Chimneys within 500m Assessment Area
227724/E/1060 Locations
of Potential Odour Sources
227724/E/1065 Location
of Open Road and Tunnel Portal (Construction Phase) (Sheet 1 of 3)
227724/E/1066 Location
of Open Road and Tunnel Portal (Construction Phase) (Sheet 2 of 3)
227724/E/1067 Location
of Open Road and Tunnel Portal (Construction Phase) (Sheet 3 of 3)
227724/E/1070 Location
of Open Road and Tunnel Portal (Operational Phase) (Sheet 1 of 3)
227724/E/1080 Location
of Open Road and Tunnel Portal (Operational Phase) (Sheet 2 of 3)
227724/E/1090 Location
of Open Road and Tunnel Portal (Operational Phase) (Sheet 3 of 3)
227724/E/1188 Contours of Cumulative Mitigated Max. 24-hour FSP Concentratio